基于RTDS的“1.15”高肇直流极2闭锁事故仿真
引用本文:贾旭东,李庚银,彭谦,李书勇.基于RTDS的“1.15”高肇直流极2闭锁事故仿真[J].电网技术,2009,33(12):30-35.
作者姓名:贾旭东  李庚银  彭谦  李书勇
作者单位:贾旭东,李庚银,彭谦,JIA Xu-dong,LI Geng-yin,PENG Qian(电力系统保护与动态安全监控教育部重点实验室(华北电力大学),北京市,昌平区,102206);李书勇,LI Shu-yong(中国南方电网超高压输电公司广州局,广东省,广州市,510405)  
基金项目:国家科技支撑计划,高等学校学科创新引智计划项目 
摘    要:基于实时数字仿真器(real time digital simulator,RTDS)搭建了仿真模型,并将RTDS与实际直流输电控制及保护装置连接,建立了交直流混合系统实时仿真实验平台。在此基础上,针对“1.15”高肇直流极2闭锁事故进行了仿真研究,成功地再现了实际故障过程,并分析了事故发生的真正原因:直流极控装置误将瞬时故障检测为永久故障,终止直流线路重启;并提出了合理的改进措施:修改极控装置中接地检测故障装置和直流线路重启去游离时间。

关 键 词:电力系统仿真  高压直流输电  闭锁故障  实时数字仿真器(RTDS)
收稿时间:2009-03-25

RTDS Based Simulation of Pole 2 Block Fault of HVDC Project From Gaopo to Zhaoqing Occurred on Jan.15
JIA Xu-dong,LI Geng-yin,PENG Qian,LI Shu-yong.RTDS Based Simulation of Pole 2 Block Fault of HVDC Project From Gaopo to Zhaoqing Occurred on Jan.15[J].Power System Technology,2009,33(12):30-35.
Authors:JIA Xu-dong  LI Geng-yin  PENG Qian  LI Shu-yong
Affiliation:1.Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control (North China Electric Power University),Ministry of Education,Changping District,Beijing 102206,China;2.Guangzhou Bureau of EHV Power Transmission Company of China Southern Power Grid,Guangzhou 510405,Guangdong Province,China
Abstract:Based on real time digital simulator (RTDS), an equivalent AC/DC hybrid simulation system for HVDC power transmission project from Gaopo to Zhaoqing is set up and the actual DC control and protection devices for this project are connected with RTDS to built a real-time AC/DC hybrid simulation experiment platform. On this basis, the pole 2 block fault of HVDC power transmission project from Gaopo to Zhaoqing Occurred on Jan. 15, 2007 is simulated, and the actual fault process is successfully reappeared, and then the real cause leading to the fault is found, that is, the control device of DC pole misjudged the instant fault of pole 2 as permanent one, so the restart of DC transmission line was terminated. For this reason, rational improvement measures, such as to modify the earth fault detection in DC pole control device and the de-ionization time for restart of DC transmission line, are put forward.
Keywords:power system simulation  HVDC power transmission  block fault  real time digital simulator (RTDS)