首页 | 本学科首页   官方微博 | 高级检索  
     

不同外网等值模型对EMS应用效果影响的试验研究
引用本文:张海波,张伯明,王俏文,陈绪国,黄滔,温伯坚.不同外网等值模型对EMS应用效果影响的试验研究[J].电网技术,2006,30(3):1-6.
作者姓名:张海波  张伯明  王俏文  陈绪国  黄滔  温伯坚
作者单位:1. 清华大学,电机与应用电子技术系,北京市,海淀区,100084
2. 深圳供电分公司,广东省,深圳市,518001
3. 广东省电力调度中心,广东省,广州市,510600
基金项目:国家自然科学基金(50595414,50323002),国家重点基础研究发展计划项目(973项目)(2004CB217904)
摘    要:利用广东省调实时外网等值自动生成系统为深圳地调生成了几种外网等值模型:外网简单挂等值机模型、外网直接等值模型、缓冲网等值模型和详细外网模型。通过远程网将等值模型送到深圳地调,在深圳地调现有能量管理系统上进行了几种主要开合环操作的仿真计算,并和现场实际操作的测试结果进行了比较,评估了应用不同外网等值模型时开断潮流的计算精度。结果表明,缓冲网等值模型具有与详细外网模型一致的精度,是最佳的外网等值建模方式。

关 键 词:NULL
文章编号:1000-3673(2006)03-0001-06
收稿时间:11 7 2005 12:00AM
修稿时间:2005年11月7日

A Test Investigation on Effect of Different External Network Equivalent Models on EMS Applications
ZHANG Hai-bo,ZHANG Bo-ming,WANG Qiao-wen,CHEN Xu-guo,HUANG Tao,WEN Bo-jian.A Test Investigation on Effect of Different External Network Equivalent Models on EMS Applications[J].Power System Technology,2006,30(3):1-6.
Authors:ZHANG Hai-bo  ZHANG Bo-ming  WANG Qiao-wen  CHEN Xu-guo  HUANG Tao  WEN Bo-jian
Affiliation:1. Department of Electrical Engineering, Tsinghua University, Haidian District, Beijing 100084, China; 2. Shenzhen Power Supply Branch Company, Shenzhen 518001, Guangdong Province, China; 3. Guangdong Power Dispatching Center, Guangzhou 510600, Guangdong Province, China
Abstract:Four external network equivalent models for Shenzhen power dispatching center are generated by use of Guangdong provincial real-time external network equivalence system, including the only equivalent machine model, the conventional Ward equivalent model, the buffer-net equivalent model and the unreduced external network model. These models are separately sent to Shenzhen power dispatching center for EMS application via WAN. Some main open/close loop operation tests are simulated by EMS equipped in Shenzhen power dispatching center and the simulation results are compared with testing results of practical on-site operations. The calculation accuracies of breaking power flow under different external network equivalent models are evaluated and the results show that the buffer-net equivalent model performs a rather consistent accuracy with the unreduced external network model, and it is the best external network equivalent model.
Keywords:Power system  Practical on-site test  External network model  Real-time external network equivalence  Energy management system (EMS)  Buffer-net
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电网技术》浏览原始摘要信息
点击此处可从《电网技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号