首页 | 本学科首页   官方微博 | 高级检索  
     

计及风电场的发输配电系统可靠性评估
引用本文:刘威,赵渊,周家启,王成亮,胡博,张禄琦,彭鹄,田娟娟. 计及风电场的发输配电系统可靠性评估[J]. 电网技术, 2008, 32(13): 69-74
作者姓名:刘威  赵渊  周家启  王成亮  胡博  张禄琦  彭鹄  田娟娟
作者单位:1. 输配电装备及系统安全与新技术国家重点实验室(重庆大学),重庆市,沙坪坝区,400044
2. 重庆电力设计院,重庆市,沙坪坝区,400044
摘    要:考虑风速时序性和自相关性的特点,建立了风速的自回归移动平均(auto-regressive and moving average,ARMA)模型,并结合常规机组、线路和变压器等状态模型,建立了基于蒙特卡罗仿真方法的风电场可靠性模型,对含风电场的发输电组合系统进行可靠性评估,同时建立了发输电组合系统的多状态机组等值模型,将该等值模型与配电系统相结合,计算了平均停电频率和停电电量损失等配电网可靠性指标,通过分析和比较可靠性指标研究了风电场对配电系统可靠性的影响,结果表明风电机组的接入对提高电力系统可靠性具有一定的作用。

关 键 词:风电场  配电系统  可靠性评估  序贯蒙特卡罗仿真  多状态机组等值模型
收稿时间:2007-07-19

Reliability Assessment of Power Generation Transmission and Distribution Systems Containing Wind Farms
LIU Wei,ZHAO Yuan,ZHOU Jia-qi,WANG Cheng-liang,HU Bo,ZHANG Lu-qi,PENG Hu,TIAN Juan-juan. Reliability Assessment of Power Generation Transmission and Distribution Systems Containing Wind Farms[J]. Power System Technology, 2008, 32(13): 69-74
Authors:LIU Wei  ZHAO Yuan  ZHOU Jia-qi  WANG Cheng-liang  HU Bo  ZHANG Lu-qi  PENG Hu  TIAN Juan-juan
Affiliation:1.State Key Laboratory of Power Transmission Equipment &; System Security and New Technology (Chongqing University),Shapingba District,Chongqing 400044,China;2.Chongqing Electric Power Design Institute,Shapingba District,Chongqing 400044,China
Abstract:Considering the features of sequentiality and self-correlation of wind speed, an auto-regressive and moving average (ARMA) model for wind speed is built. Combining with the state models of conventional generating units, transmission lines and transformers, a Monte Carlo simulation based wind farm reliability model is established to perform reliability assessment of power generation and transmission system containing wind farm, meanwhile, a multi-state service provider (MSP) model of power generation and transmission system is built; combining the MSP model with distribution system, the reliability indices of distribution network such as average interruption frequency and interruption caused electricity loss are calculated. By means of comparing and analyzing the reliability indices, the impact of wind farm on distribution system is researched and the results show that interconnection of wind farm with power grid can play a certain role in the improvement of power system reliability.
Keywords:wind farm  distribution system  reliability assessment  sequential Monte Carlo simulation  multi-state service provider model
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电网技术》浏览原始摘要信息
点击此处可从《电网技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号