首页 | 本学科首页   官方微博 | 高级检索  
     


An efficient hybrid algorithm for resource-constrained project scheduling
Authors:Wang Chen  Hong-fei Teng  Li-chen Hu
Affiliation:a School of Mechanical Engineering, Dalian University of Technology, Dalian 116024, PR China
b China North Vehicle Research Institute, Beijing 100072, PR China
Abstract:We propose an efficient hybrid algorithm, known as ACOSS, for solving resource-constrained project scheduling problems (RCPSP) in real-time. The ACOSS algorithm combines a local search strategy, ant colony optimization (ACO), and a scatter search (SS) in an iterative process. In this process, ACO first searches the solution space and generates activity lists to provide the initial population for the SS algorithm. Then, the SS algorithm builds a reference set from the pheromone trails of the ACO, and improves these to obtain better solutions. Thereafter, the ACO uses the improved solutions to update the pheromone set. Finally in this iteration, the ACO searches the solution set using the new pheromone trails after the SS has terminated. In ACOSS, ACO and the SS share the solution space for efficient exchange of the solution set. The ACOSS algorithm is compared with state-of-the-art algorithms using a set of standard problems available in the literature. The experimental results validate the efficiency of the proposed algorithm.
Keywords:Project management  Scheduling  Ant colony optimization  Scatter search  Project scheduling
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号