首页 | 本学科首页   官方微博 | 高级检索  
     

基于AHP的油田产能建设项目后评价模型研究
引用本文:杜睿山,李阳,曹茂俊,王永安,李文赫,李荟.基于AHP的油田产能建设项目后评价模型研究[J].计算机技术与发展,2014(11):203-206.
作者姓名:杜睿山  李阳  曹茂俊  王永安  李文赫  李荟
作者单位:东北石油大学,黑龙江 大庆,163318
基金项目:黑龙江省教育科学技术研究项目,东北石油大学青年科学基金
摘    要:为了提高油田产能建设项目的投资效益以及决策、管理水平,在详细分析油田产能建设项目后评价工作程序、工作内容的基础上,针对油田产能建设项目不确定因素多、风险高、投资大等特点,提出建立以计算机技术支持的基于AHP油田产能建设项目后评价辅助系统的设计方案。运用层次分析法( AHP)合理地确定了评价指标的权重,得到项目综合评分;根据实际需求研究并开发了以满足工程技术人员及项目管理决策需求的智能系统。该系统应用于油田产能建设项目后评价工作中,更为客观地对产能建设项目进行高效的评价,使产能建设项目投资决策更加科学化。

关 键 词:产能建设  后评价  层次分析法  模糊逻辑

Research on Post Evaluation Model for Productivity Construction Project of Oilfield Based on AHP
DU Rui-shan,LI Yang,CAO Mao-jun,WANG Yong-an,LI Wen-he,LI Hui.Research on Post Evaluation Model for Productivity Construction Project of Oilfield Based on AHP[J].Computer Technology and Development,2014(11):203-206.
Authors:DU Rui-shan  LI Yang  CAO Mao-jun  WANG Yong-an  LI Wen-he  LI Hui
Affiliation:( Northeast Petroleum University ,Daqing 163318 ,China)
Abstract:In order to improve the investment efficiency,decision-making and management level of the productive capacity construction project of oilfield,on the basis of analysis of work processes and work content in detail,for uncertainty,high risk,large investment and other characteristics,propose a design scheme on computer technical supporting of auxiliary systems of the post evaluation for the produc-tive capacity construction project of oilfield based on the AHP. First,determine the evaluation weights reasonably with the AHP,get the composite score. Then,research and develop the intelligent systems of satisfying engineering and technical personnel and the decision-making needs of project management according to the actual needs. The system is used in the work of the productive capacity construction project of oilfield,evaluating efficiently and objectively and making the decision scientifically.
Keywords:productivity construction  post evaluation  AHP  fuzzy logic
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号