Minimizing the number of tardy jobs under piecewise-linear deterioration
Authors:Ghasem Moslehi  Abbasali Jafari
Affiliation:Department of Industrial and Systems Engineering, Isfahan University of Technology, 84156-83111, Isfahan, Iran
Abstract:In this paper, we consider a single machine scheduling problem with piecewise-linear deterioration where its objective is to minimize the number of tardy jobs, in which the processing time of each job depends on its starting time where all the jobs have a specific deterioration rate. The problem is known to be NP-hard; therefore a Branch and Bound algorithm and a heuristic algorithm with O(n2) are proposed. The proposed heuristic algorithm has been utilized for solving large scale problems and upper bound of the B&B algorithm. Computational experiments on 1840 problems demonstrate that the Branch and Bound procedure can solve problems with 28 jobs and 85.4% of all the sample problems optimally showing the high capability of the proposed procedure. Also it is shown that the average value of the ratio of optimal answer to the heuristic algorithm result with the objective ∑(1-Ui)(1-Ui) is at last 1.08 which is more efficient in contrast to other proposed algorithms in related studies in the literature. According to high efficacy of the heuristic algorithm, large scale samples are also being solved and the results are presented. A specific form of this problem is also being considered and it is proven that the B&B procedure can handle problems with more jobs even up to 44 jobs.
Keywords:Scheduling  Single machine  Deteriorating jobs  Branch and Bound
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号