首页 | 本学科首页   官方微博 | 高级检索  
     

孟加拉HATHAZARI 132kV电缆回流线取舍探讨
引用本文:熊玉,黄准.孟加拉HATHAZARI 132kV电缆回流线取舍探讨[J].自动化应用,2012(3):82-83.
作者姓名:熊玉  黄准
作者单位:1. 广东火电电控公司,广州,510725
2. 广东省大宝山矿业有限公司,广东韶关,512128
摘    要:针对孟加拉Hathazari 100MW重油发电机组EPC工程132kV电缆现场实际设计、采购和敷设情况,通过理论计算探讨回流线取舍问题。

关 键 词:132kV单芯电缆  回流线  敷设方式  金属护层  感应电压

Discussing of Choosing 132kV Return Line in Bangladesh HATHAZARI Power Plant
XIONG Yu,HUANG Zhun.Discussing of Choosing 132kV Return Line in Bangladesh HATHAZARI Power Plant[J].Automation Application,2012(3):82-83.
Authors:XIONG Yu  HUANG Zhun
Affiliation:1.Electrical Manage Company of Gouangdong Power Engineering Corp.,Guangzhou 510000,China;2.Guangdong Dabao Mountain Mining Co.,LTD,Shaoguan 512128,China)
Abstract:According to practical circumstances of the 132kV power cables design,stock and laying mode,whether adopt the return line in Bangladesh HATHAZARI 100MW heavy oil power plant is discussed through theory calculation.
Keywords:132kV single core cable  return line  installation mode  laying mode  metal sheath  induced voltage
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏