首页 | 本学科首页   官方微博 | 高级检索  
     

基于裁剪的弱硬实时调度算法
引用本文:吴 彤,金士尧,刘华锋,陈积明.基于裁剪的弱硬实时调度算法[J].软件学报,2008,19(7):1837-1846.
作者姓名:吴 彤  金士尧  刘华锋  陈积明
作者单位:国防科学技术大学,并行与分布处理国家重点实验室,湖南,长沙,410073
基金项目:Supported by the National Natural Science Foundation of China under Grant Nos.60603032, 60604029 (国家自然科学基金); the NSFC-Guangdong Province of China under Grant No.U0735003 (国家自然科学基金委-广东省联合基金重点项目)
摘    要:针对当前弱硬实时调度算法无法保证超过窗口长度的执行序列的满足率达到一定比例的问题,基于(m~-,p)弱硬实时约束,提出了一种基于裁剪的调度算法(cut-down based scheduling,简称CDBS).由于判断(m~-,p)约束是否满足需要遍历任务的整个执行序列,因此判断复杂度很大.为此,提出一种高效的裁剪执行序列的算法,同时证明其正确性,并利用适当的数据结构,使得计算复杂度与序列长度无关,通过实验说明其降低计算复杂度的有效性.进一步与其他经典实时调度算法(EDF(earliest deadline first),DBP(distance-based priority),DWCS(dynamic window constraint schedule))进行比较,验证该算法与其他算法具有相当的性能.

关 键 词:弱硬实时  动态失效  执行序列  CDBS(cut-down  based  scheduling)  转折点
收稿时间:2006/11/17 0:00:00
修稿时间:3/8/2007 12:00:00 AM

A Weakly Hard Real-Time Schedule Algorithm Based on Cutting Down
WU Tong,JIN Shi-Yao,LIU Hua-Feng and CHEN Ji-Ming.A Weakly Hard Real-Time Schedule Algorithm Based on Cutting Down[J].Journal of Software,2008,19(7):1837-1846.
Authors:WU Tong  JIN Shi-Yao  LIU Hua-Feng and CHEN Ji-Ming
Abstract:Existing weakly hard real-time scheduling algorithms can not guarantee the meeting ratio of executing sequence of which the length islarger than fixed window-size.Therefore,this paper,based on the(m~-,p)constraint, proposes an algorithm which is named as CDBS(cut-down based scheduling).Since the discrimination of the satisfiability of(m~-,p)constraintneeds to go over the whole executing sequence of the task,it is very difficult and infeasible.For this reason,this paper introduces an efficient algorithm of cutting down the sequence,proves the correctness of the algorithm.This paper uses proper data structures so that the complexity of judgment is irrelevant to the length of sequence.Experimental results show the efficiency.Furthermore,this paper compares CDBS with other classical algorithms,such as EDF,(earliest deadline first),DBP(distance-based priority),DWCS(dynamic window constraint schedule),and the results show its competence.
Keywords:weakly hard real-time  dynamic failure  executing sequence  CDBS(cut-down based scheduling)  turnpoint
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《软件学报》浏览原始摘要信息
点击此处可从《软件学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号