首页 | 本学科首页   官方微博 | 高级检索  
     

汽车同步装配线生产计划与调度集成优化汽车同步装配线生产计划与调度集成优化
引用本文:安玉伟,严洪森.汽车同步装配线生产计划与调度集成优化汽车同步装配线生产计划与调度集成优化[J].控制与决策,2011,26(5):641-649.
作者姓名:安玉伟  严洪森
作者单位:1. 东南大学自动化学院,南京210096;东南大学复杂工程系统测量与控制教育部重点实验室,南京210096;黑龙江科技学院数力系,哈尔滨150027
2. 东南大学自动化学院,南京210096;东南大学复杂工程系统测量与控制教育部重点实验室,南京210096
基金项目:国家863计划项目,国家自然科学基金
摘    要:为克服传统的"自顶向下"方式下生产计划与调度不协调的缺陷,针对汽车同步装配线,构造了生产计划与调度集成优化混合整数规划模型,并采用拉格朗日松弛法将其分解为批量计划及调度等子问题.将调度子问题转化为与时间相关的旅行商问题,并采用dynasearch算法求解.对于拉格朗日对偶问题,采用均衡方向策略法求解.仿真实验结果验证了模型及算法的有效性.

关 键 词:同步装配线  生产计划与调度  拉格朗日松弛  均衡方向策略法  dynasearch算法
收稿时间:2010/2/1 0:00:00
修稿时间:2010/7/12 0:00:00

Integrated optimization for production planning and scheduling on
synchronous automobile assembly line
AN Yu-wei,YAN Hong-sen.Integrated optimization for production planning and scheduling on
synchronous automobile assembly line[J].Control and Decision,2011,26(5):641-649.
Authors:AN Yu-wei  YAN Hong-sen
Affiliation:AN Yu-wei1,2,YAN Hong-sen1(1a.School of Automation,1b.Key Laboratory of Measurement and Control of CSE of Ministry of Education,Southeast University,Nanjing 210096,China,2.Department of Mathematics and Mechanics,Heilongjiang Institute of Science and Technology,Harbin 150027,China.)
Abstract:To overcome the incoordination between production plan and its schedule in the classic from-top-to-down approach,a mixed integer programming model of integrated production planning and scheduling is presented for synchronous automobile assembly line.A Lagrangian relaxation method is developed for the proposed model which is decomposed into planning and scheduling sub-problems,etc.The scheduling sub-problem is modeled as a time-dependent traveling salesman problem(TDTSP) which is solved by using a dynasearch...
Keywords:synchronous assembly line  production planning and scheduling  Lagrangian relaxation  average direction strategy method  dynasearch algorithm  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《控制与决策》浏览原始摘要信息
点击此处可从《控制与决策》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号