首页 | 本学科首页   官方微博 | 高级检索  
     


A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates
Authors:AH Gharehgozli  R Tavakkoli-Moghaddam  N Zaerpour
Affiliation:aDepartment of Industrial Engineering, College of Engineering, University of Tehran, P.O. Box: 11155-4563, Tehran, Iran
Abstract:This paper presents a new mixed-integer goal programming (MIGP) model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the complexity of the above model and uncertainty involved in real-world scheduling problems, it is sometimes unrealistic or even impossible to acquire exact input data. Hence, we consider the parallel-machine scheduling problem with sequence-dependent set-up times under the hypothesis of fuzzy processing time's knowledge and two fuzzy objectives as the MIGP model. In addition, a quite effective and applicable methodology for solving the above fuzzy model are presented. At the end, the effectiveness of the proposed model and the denoted methodology is demonstrated through some test problems.
Keywords:Parallel machine scheduling  Mixed-integer goal programming  Fuzzy theory  Sequence-dependent setup time  Release date
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号