首页 | 本学科首页   官方微博 | 高级检索  
     

新疆风力发电中的计量问题研究
引用本文:任孝平,张跃,王健,蔡常青,薛志超.新疆风力发电中的计量问题研究[J].中国计量学院学报,2012,23(4):319-325.
作者姓名:任孝平  张跃  王健  蔡常青  薛志超
作者单位:1. 中国计量科学研究院力学与声学计量科学研究所,北京,100013
2. 哥本哈根大学生命科学学院,丹麦哥本哈根2100
摘    要:在对新疆达坂城风力发电场进行调研的基础上,通过与企业科技工作人员的座谈,总结了新疆地区风力发电中的计量测试需求等计量科学问题.列举了近几年来国内发生的重大风电事故,引出了风电系统中的监管问题,指出由于监管部门对风电场质量的监管空白,造成了制造企业、施工单位对质量控制的忽视.从风电项目设计、安装、运行三个环节分析了所涉及到的风电设备质量问题,在每一个环节中计量检测技术都是风电行业质量与安全的重要保障;由于风电场的位置和设备复杂性,企业和计量监管部门都十分重视风电系统的在线监测、检定和校准的功能.这也是"十二五"规划中智能电网的重要组成部分.

关 键 词:风力发电  计量技术  在线监测  检定与校准  智能电网

Metrology supervision problems of Xinjiang wind power generation
REN Xiao-ping , ZHANG Yue , WANG Jian , CAI Chang-qing , XUE Zhi-chao.Metrology supervision problems of Xinjiang wind power generation[J].Journal of China Jiliang University,2012,23(4):319-325.
Authors:REN Xiao-ping  ZHANG Yue  WANG Jian  CAI Chang-qing  XUE Zhi-chao
Affiliation:1.Division of Mechanics and Acoustics,National Institute of Metrology,Beijing 100013,China; 2.Faculty of Health Science,University of Copenhagen,Copenhagen 2100,Denmark)
Abstract:Based on the investigation of wind power located in the city of Dabancheng,this paper summarized the metrology supervision problems of Xinjiang.By listing domestic wind power accidents happened in recent years and supervision problems in the management of wind power,it pointed out that the supervision abscence of the quality of wind power plants by the authority was the reason why manufacturing corporations and construction departments neglected quality control.It then analyzed the quality problems of wind power equipment in three areas of wind power projects which induded design,installation and operation.In every area of wind power generation,metrology testing technology is guarantee to the quality and safety of wind power.Due to the location and complexity of wind power plant instrument,the online monitoring and its inspection and calibration are important to both corporations and authoritis.This will be an important part of the smart grid of the country in the Twelfth Five-Year Plan.
Keywords:wind power  metrology technology  online monitoring  inspection and calibration  smart grid
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号