首页 | 本学科首页   官方微博 | 高级检索  
     

基于混合智能算法的多资源约束项目优化调度
引用本文:施国洪,陈敬贤,马汉武,陈黎卿.基于混合智能算法的多资源约束项目优化调度[J].工程设计学报,2008,15(2):140-144.
作者姓名:施国洪  陈敬贤  马汉武  陈黎卿
作者单位:1. 江苏大学,工商管理学院,江苏,镇江,212013
2. 安徽农业大学,工学院,安徽,合肥,230036
基金项目:江苏省社会科学基金 , 安徽省科技厅软科学重点项目
摘    要: 基于关键链项目管理(critical chain project management,CCPM),利用一种混合智能优化算法求解多资源约束项目调度问题,解决传统调度优化算法的不足,提高这类问题的求解质量.首先利用一类启发式算法识别项目关键链,并设置缓冲区尺寸,以项目总工期和在制品库存为优化目标建立数学模型,设计一种混合智能优化算法求解,并对项目问题库中的j30hrs.sm问题和某生产型项目进行实验分析,得到优化的结果.实验表明,采用混合智能算法求解这类问题能得到明显优于一般调度优化算法的结果.

关 键 词:关键链  多资源约束项目  启发式算法  混合智能算法
文章编号:1006-754X(2008)02-0140-06
修稿时间:2007年8月9日

Optimization scheduling research of multi-resource-constrained project based on mixed-intelligence algorithm
SHI Guo-hong,CHEN Jing-xian,MA Han-wu,CHEN Li-qing.Optimization scheduling research of multi-resource-constrained project based on mixed-intelligence algorithm[J].Journal of Engineering Design,2008,15(2):140-144.
Authors:SHI Guo-hong  CHEN Jing-xian  MA Han-wu  CHEN Li-qing
Affiliation:1.School of Business Administration, Jiangsu University, Zhenjiang 212013, China;
2. College of Engineering, Anhui Agricultural University, Hefei 230036, China
Abstract:For multi-resource-constrained project scheduling problem, a mixing-intelligence optimization algorithm to overcome the insufficiency of the traditional optimization one and enhance quality of the solution was proposed, which is based on critical chain project management (CCPM). Firstly, one kind of heuristic algorithm was adopted to recognize the critical chain and establish buffer size. And then by taking the project total time and work-in-process as the optimized goal, the mathematical model was established. Finally, a kind of intelligent optimization algorithm was designed and then the j30hrs.sm problem of project scheduling problem library and one production project problem were analyzed to get the optimizing result. The experiment result indicates that this algorithm can obtain better result than traditional scheduling optimization one in this kind of problem.
Keywords:critical chain  multi-resource-constrained project  heuristic algorithm  mixing-intelligence algorithm
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《工程设计学报》浏览原始摘要信息
点击此处可从《工程设计学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号