城市桥梁大行程同步顶升支撑系统空间仿真非线性分析
引用本文:袁鑫,郑伟,杨浩,吴毅彬.城市桥梁大行程同步顶升支撑系统空间仿真非线性分析[J].振动与冲击,2014,33(4):22-26.
作者姓名:袁鑫  郑伟  杨浩  吴毅彬
作者单位:1 东南大学 江苏南京 210096 ;2上海颖川加固工程技术有限公司 上海 200000
摘    要:为了研究城市桥梁大行程同步顶升在特定的边界条件下支撑体系的真实力学行为,对钢管支撑实体空间计算应力结果和杆系结构计算进行数值模拟对比分析,从顶升支撑结构体系仿真计算方法角度出发,开展了钢支撑、承台和人工挖孔桩三者共同构成顶升支撑体系的空间仿真计算方法研究。研究表明:传统的顶升支撑结构体系计算方法基于弹性地基梁假定,计算精度不高,不能反映支撑系统的空间力学状态。本文针对顶升支撑体系整体采用ABAQUS空间仿真计算,考虑了结构的非线性特点,计算收敛良好;并与"m"法计算进行对比分析,验证了钢支撑、承台、人工挖孔桩顶升底盘结构体系空间计算的精确性。

关 键 词:城市桥梁    同步顶升    非线性分析    支撑系统    大行程    “m”法  
收稿时间:2013-1-22
修稿时间:2013-3-27

Space simulation nonlinear analysis of the support system for urban bridge long stroke Synchronous jack-up
Yuan Xin,Zheng Wei Yang Hao Wu Yibin.Space simulation nonlinear analysis of the support system for urban bridge long stroke Synchronous jack-up[J].Journal of Vibration and Shock,2014,33(4):22-26.
Authors:Yuan Xin  Zheng Wei Yang Hao Wu Yibin
Affiliation:1. School of Civil Engineering, Southeast University, Nanjing 210096, China;2 Shanghai Yingchuan Reinforce Techinical Limited Company; Shanghai 200000, China
Abstract:In order to research the real mechanical behavior of the supporting system during urban bridge long stroke synchronous jack-up under specific boundary conditions, the comparative stress analysis of space calculation results and truss structure calculation is adopted. From the perspective of the simulation calculation method, this paper carries on analysis on the simulation calculation method of the lifting support system which is constituted by the steel support, pile caps, artificial dig-hole pile three a whole. The results show that the accuracy of the traditional support system calculation method which is based on elastic foundation beam hypothesis is not high and often cannot reflect the space mechanics state of supporting system. In this paper, the ABAUQS space simulation is adopted to lifting support system during which the nonlinear characteristics of the structure is considered, the convergence is good .The space calculation method of the lifting support system which is constituted by the steel support, pile caps, artificial dig-hole pile is more accurate than “m” method.
Keywords:urban bridgesynchronous jack-upnonlinear analysissupport systemlong stroke“m” method