An optimal integrated lot sizing and maintenance strategy for multi-machines system with energy consumption |
| |
Authors: | Zied Hajej Nidhal Rezg |
| |
Affiliation: | 1. Laboratory of Industrial Engineering Production and Maintenance, University of Lorraine, Metz, France zied.hajej@univ-lorraine.fr;3. Laboratory of Industrial Engineering Production and Maintenance, University of Lorraine, Metz, France |
| |
Abstract: | This paper proposes an integrated model for multi-machines dynamic lot sizing aiming to produce a single item, considering the energy consumption during the production horizon. The objective is to find, firstly, the optimal lot size as well as the number of machines that satisfy a random demand under given service level and secondly, maintenance plan depended to production planning to minimise the total production, energy and maintenance costs. In fact, the problem of energy consumption is one of the most evoked topics especially with the decision of many governments to reduce theirs (For example France is willing to reduce the total consumption by 20% by 2020). The keys of this study are to consider, firstly, the correlation between the forecasting of demand, the variation of the working machines as well as their production rates under energy constraint and secondly the correlation between the production cadences and the maintenance strategy of all machines. |
| |
Keywords: | lot sizing production maintenance energy failure-rate optimisation forecasting |
|
|