定时维修间隔期的优化计算方法 |
| |
引用本文: | 庞名泰,郭金茂,张耀辉.定时维修间隔期的优化计算方法[J].四川兵工学报,2013,34(9):39-40. |
| |
作者姓名: | 庞名泰 郭金茂 张耀辉 |
| |
作者单位: | 装甲兵工程学院,北京,100072 |
| |
摘 要: | 分析了现有装甲装备定时维修可能出现维修过剩的问题,阐述了合理确定定时维修间隔期的重要性,对以费用最小为目标的定时维修间隔期模型进行了研究,实现了优化定时维修间隔期的目的。
|
关 键 词: | 装甲装备 定时维修 维修间隔期 |
An Optimization Method for the Calculation of Hard-time Maintenance Interval |
| |
Authors: | PANG Ming-tai GUO Jin-mao ZHANG Yao-hui |
| |
Affiliation: | (The Academy of Armored Forces Engineering, Beijing 100072, China) |
| |
Abstract: | Abstract: Analysis of existing hard-time maintenance of armored equipment may repair the problem of ex- cess. This paper elaborated reasonable assurance as to the importance of hard-time maintenance intervals, and researched the minimum cost hard-time maintenance Intervals model, so as to achieve the purpose of optimization of hard-time maintenance intervals. |
| |
Keywords: | armored equipment hard-time maintenance repair interval |
本文献已被 维普 万方数据 等数据库收录! |
|