基于负荷曲线的水电站群短期运行效益研究
引用本文:喻〓杉,纪昌明,张验科,杨子俊,黄海涛.基于负荷曲线的水电站群短期运行效益研究[J].水电能源科学,2012,30(2):56-59,158.
作者姓名:喻〓杉  纪昌明  张验科  杨子俊  黄海涛
作者单位:1. 华北电力大学可再生能源学院,北京,102206
2. 中国水电顾问集团昆明勘测设计研究院,云南昆明,650051
3. 华北电力大学可再生能源学院,北京102206;中国水电顾问集团昆明勘测设计研究院,云南昆明650051
基金项目:国家水体污染控制与治理科技专项基金资助重大项目(2009ZX07423-001);国家自然科学基金资助项目(40971300);中国博士后科学基金资助项目(20100470276);中央高校基本科研业务费专项资金基金资助项目(10QX43,09MG16,10QG23)
摘    要:以金沙江中游梯级水电站群为例,结合电网需求,建立了基于负荷曲线运行的梯级水电站群短期联合发电优化调度模型,并采用逐次逼近法与逐步优化法的耦合算法对模型进行求解,比较分析了基于该模型的短期运行发电量效益。结果表明,梯级联合运行更符合电网调度需求,且在周调节基础上进一步日调节,综合效益增幅显著。

关 键 词:梯级水电站群    短期运行    电力负荷曲线    日调度    调峰调度

Short term Operation Benefit Analysis of Cascade Hydropower Stations Based on Load Curve
YU Shan,JI Changming,ZHANG Yanke,YANG Zijun and HUANG Haitao.Short term Operation Benefit Analysis of Cascade Hydropower Stations Based on Load Curve[J].International Journal Hydroelectric Energy,2012,30(2):56-59,158.
Authors:YU Shan  JI Changming  ZHANG Yanke  YANG Zijun and HUANG Haitao
Affiliation:1,2(1.Renewable Energy School,North China Electric Power University,Beijing 102206,China;2.HydroChina Kunming Engineering Corporation,Kunming 650051,China)
Abstract:Taking the cascade hydropower stations in middle reaches of Jinsha river for an example,the short-term generation optimal model based on load curve is established to meet the demand of power grid.The model is solved with coupling of dynamic programming successive method and progressive optimality algorithm.And then the short-term generation benefit based on the model is calculated and made a comparison.The results show that not only the cascade joint operation is more accord with the dispatching demand of power grid,but also the comprehensive benefits could improve more observably with the further daily regulation on the basis of weekly regulation.
Keywords:cascade hydropower stations  short-term operation  power load curve  daily scheduling  peak regulation dispatching