首页 | 本学科首页   官方微博 | 高级检索  
     

白石水库洪水过程泥沙冲淤数值模拟分析
引用本文:郭维东,李东斌,李晓丽,胡 艳.白石水库洪水过程泥沙冲淤数值模拟分析[J].水电能源科学,2013,31(6):89-92.
作者姓名:郭维东  李东斌  李晓丽  胡 艳
作者单位:沈阳农业大学 水利学院, 辽宁 沈阳 110866;沈阳农业大学 水利学院, 辽宁 沈阳 110866;沈阳农业大学 水利学院, 辽宁 沈阳 110866;沈阳农业大学 水利学院, 辽宁 沈阳 110866
基金项目:国家自然科学基金资助项目(40071183)
摘    要:为研究白石水库泥沙冲淤特性,选取水库大坝至上游BD20断面,分别模拟汛期典型洪水过程和百年一遇洪水过程,分析洪水过程泥沙冲淤变化。结果表明,白石水库洪水期间最大输沙量与最大流量并不同步,在库区弯道处凹岸库底冲刷、凸岸库底淤积;同一断面的洪峰流量、最大输沙率不同步;洪水过后,淤积厚度随控制水位的升高而减小。

关 键 词:白石水库    洪水过程    泥沙冲淤    数值模拟

Numerical Simulation Analysis of Sediment Erosion and Deposition of Baishi Reservoir
GUO Weidong,LI Dongbin,LI Xiaoli and HU Yan.Numerical Simulation Analysis of Sediment Erosion and Deposition of Baishi Reservoir[J].International Journal Hydroelectric Energy,2013,31(6):89-92.
Authors:GUO Weidong  LI Dongbin  LI Xiaoli and HU Yan
Affiliation:College of Water Conservancy, Shenyang Agricultural University, Shenyang 110866, China;College of Water Conservancy, Shenyang Agricultural University, Shenyang 110866, China;College of Water Conservancy, Shenyang Agricultural University, Shenyang 110866, China;College of Water Conservancy, Shenyang Agricultural University, Shenyang 110866, China
Abstract:For the study of Baishi Reservoir sediment erosion and deposition characteristics, numerical simulation of sediment erosion and deposition in flood season is made on the basic of river segment from dam to upstream cross section BD20. And the typical flood process and the hundred year flood are simulated. The results show that during the flood period, the maximum sediment discharge does not synchronize with the maximum flow; in the bend of reservoir area, concave bank scours and convex bank deposits; in the same section, the peak flow does not synchronize with the maximum sediment rate; after the flood depletion, deposition thickness decreases with the increase of water level control.
Keywords:Baishi Reservoir  flood process  sediment erosion and deposition  numerical simulation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号