常州高架五星大桥挂篮悬臂现浇施工控制 |
| |
引用本文: | 房浩,谭晓芸,刘斌.常州高架五星大桥挂篮悬臂现浇施工控制[J].中国市政工程,2009(5):32-34. |
| |
作者姓名: | 房浩 谭晓芸 刘斌 |
| |
作者单位: | 上海市第二市政工程有限公司,上海,200065 |
| |
摘 要: | 以常州高架五星大桥挂篮悬臂现浇施工为例,详细介绍挂篮悬臂施工的流程和具体步骤。对施工中的监控方法,详述了要提供的数据。施工中的关键技术可为类似的桥梁施工提供借鉴。
|
关 键 词: | 连续梁桥 挂篮施工 施工控制 测量监控 |
On Cast-in-situ Cantilever Cradle Construction Controlling of Wuxing Bridge,Changzhou Viaduct |
| |
Abstract: | Taking the cast-in-situ cantilever cradle construction of Wuxing Bridge, Changzhou viaduct for the example, the procedure and the concrete steps of its construction were introduced in this paper. For the used monitoring method, the related data were applied in detail. The key technique could provide reference for the similar bridge construction. |
| |
Keywords: | continuous girder bridge cradle construction construction controlling surveying monitoring |