Construction and field measurement of high-speed railway test embankment built on Indian expansive soil “Black Cotton Soil”
Authors:Kenji Watanabe  Susumu Nakajima  Torajiro Fujiwara  Kyoichiro Yoshii  G Venkatappa Rao
Affiliation:1. University of Tokyo, 7-3-1, Bunkyo-ku, Hongo, Tokyo, 113-8656, Japan;2. Railway Technical Research Institute, 2-8-38, Hikari-cho, Kokubunji-shi, Tokyo 185-8540, Japan;3. East Japan Railway Company, 2-6-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo 163-0231, Japan;4. East Japan Railway Company, 2-2-6, Yoyogi, Shibuya-ku, Tokyo 151-8512, Japan;5. IIT Gandhi Nagar, Bhakta Nivas, 12-1-170/46 P, Hanuman Nagar, Jaipuri Colony, Nagole, Hyderabad 500 068, India
Abstract:The railway embankment applied to high-speed railways is required to have high performance in terms of strength and deformation characteristics. Especially in the case of railway embankments that support slab tracks, the allowable settlement is very small. There are two technical challenges in constructing high-speed rail embankments to support slab tracks in India. The first challenge is dealing with problematic black cotton soil (BCS), which is widely distributed in India but very unusual soil in Japan. The second challenge is posed by the strict deformation requirement in the construction of the embankments. In this study, a 6 m-high test embankment was constructed on BCS in India. The deformation of the embankment and changes in water content were measured over a period of 18 months. In the construction of the test embankment, two different BCS countermeasures were applied. The results of the tests on this embankment were compared with those from an embankment without countermeasures. Complicated deformation behaviors, including settlement and the uplift of embankment, were observed in the section without countermeasure. However, in the embankment with cement-mixed gravelly soil (CGS) slab improvement with geosynthetics, the much lower amplitude of embankment deformation is evidence of the effectiveness of this countermeasure. The cohesive non-swelling soil (CNS) layer applied immediately below the embankment to reduce the water content fluctuation of BCS was not effective enough for use for high-speed railway embankment. Besides determining the technical challenges for the BCS countermeasures, the results of this study confirmed that a high-performance embankment can be constructed with Indian embankment material by performing sufficient compaction management.
Keywords:Expansive soil  Railway embankment  Black cotton soil  Countermeasure  Construction management  Compaction
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号