深部地下洞室施工期围岩大变形机制分析
引用本文:费文平,张建美,崔华丽,张国强. 深部地下洞室施工期围岩大变形机制分析[J]. 岩石力学与工程学报, 2012, 0(Z1): 2783-2787
作者姓名:费文平  张建美  崔华丽  张国强
作者单位:四川大学水力学与山区河流开发保护国家重点实验室;四川大学水利水电学院
基金项目:国家自然科学基金面上项目(50974091);国家重点基础研究发展计划(973)项目(2010CB732005)
摘    要:大岗山水电站引水发电系统地下洞室埋深大,花岗岩因风化卸荷强烈,岩脉破碎带发育,应力较高。在施工过程中,岩脉、断层穿越的主变室部位出现较大的变形,严重影响施工安全与进度。采用地质调查和现场监测的方法,结合现场施工情况分析主变室围岩大变形特征和机制,提出2种可能的大变形破坏模式,分析影响围岩大变形的因素,并评价主变室的稳定性。研究结果表明:主变室围岩大变形主要受辉绿岩脉8 1和断层f59,f60控制,同时,地应力高、施工强度大、支护进度滞后加剧围岩的大变形。深部地下洞室施工期的地质调查及现场监测可以及时预测高应力区卸荷围岩的大变形,以确保洞室施工期的稳定安全。研究成果对类似工程具有重要的参考价值。

关 键 词:岩石力学  地下洞室  大变形  围岩稳定性

LARGE DEFORMATION MECHANISM ANALYSIS OF SURROUNDING ROCKS IN DEEP UNDERGROUND CAVERN DURING CONSTRUCTION
FEI Wenping,ZHANG Jianmei,CUI Huali,ZHANG Guoqiang. LARGE DEFORMATION MECHANISM ANALYSIS OF SURROUNDING ROCKS IN DEEP UNDERGROUND CAVERN DURING CONSTRUCTION[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 0(Z1): 2783-2787
Authors:FEI Wenping  ZHANG Jianmei  CUI Huali  ZHANG Guoqiang
Affiliation:1,2(1.State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China;2.College of Water Resources and Hydropower,Sichuan University,Chengdu,Sichuan 610065,China)
Abstract:The underground caverns of Dagangshan hydropower station show typical characteristics of large buried-depth,strong weathering of surrounding rocks,full development of dike and fractures,and high in-situ stresses.During construction,the deformation of transformer chamber where dikes and faults cross through is very significant,which seriously affects the safety and advance of construction.On the basis of geological investigation and field monitoring,according to the field construction condition,the large deformation mechanism of surrounding rocks is analyzed.Two possible large deformation failure modes are proposed.Factors inducing large deformation are analyzed,and the stability of transformer chamber is evaluated.The results show that the large deformation of surrounding rocks is mainly controlled by diabase dike 8 1and faults f59,f60.The high in-situ stresses,high intensity of construction and delayed supporting accelerate the large deformation of surrounding rocks.The geological investigation and field monitoring are very useful for forecasting the large deformation of unloading rocks in high stress zones,and for ensuring the stability and safety of underground cavern during construction.The results have very important reference values for similar projects.
Keywords:rock mechanics  underground cavern  large deformation  stability of surrounding rocks