首页 | 本学科首页   官方微博 | 高级检索  
     

盾构法和浅埋暗挖法结合建造地铁车站的模型试验
引用本文:刘维宁,路美丽,张新金,李兆平.盾构法和浅埋暗挖法结合建造地铁车站的模型试验[J].岩石力学与工程学报,2009,28(8):1629-1639.
作者姓名:刘维宁  路美丽  张新金  李兆平
作者单位:(1. 北京交通大学 土木建筑工程学院,北京 100044;2. 中铁第五勘察设计院集团有限公司,北京 102600)
基金项目:北京市科技计划项目资助 
摘    要: 针对目前国内区间盾构施工和车站施工工期矛盾的问题,提出盾构法和浅埋暗挖法结合建造地铁车站的新方案。通过1∶10大比尺模型试验研究,介绍模型地层、开挖方案和支护方案的模拟,比较真实地再现新型车站的施工过程。得到盾构管片应变、收敛变形和洞周土体变位在整个车站施工过程中的变化规律。试验结果表明在模型地层构造和地应力的条件下,采用试验中的施工开挖方案和支护方案能够保证车站洞室在整个施工过程中的安全稳定,证明提出的新型车站施工技术是可行的。

关 键 词:隧道工程盾构法浅埋暗挖法地铁车站施工过程模型试验变化规律
收稿时间:2008-11-12
修稿时间:2009-4-27

MODEL TEST ON METRO STATION CONSTRUCTED BY COMBINATION OF SHIELD METHOD AND SHALLOW-BURIED TUNNELING METHOD
LIU Weining,LU Meili,ZHANG Xinjin,LI Zhaoping.MODEL TEST ON METRO STATION CONSTRUCTED BY COMBINATION OF SHIELD METHOD AND SHALLOW-BURIED TUNNELING METHOD[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(8):1629-1639.
Authors:LIU Weining  LU Meili  ZHANG Xinjin  LI Zhaoping
Affiliation:(1. School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;;2. The Fifth Survey and Design Institute(Group) Co.,Ltd.,CRCC,Beijing 102600,China)
Abstract:In order to solve the contradiction of construction time limit for running tunnel constructed by shield method and station in China,the new-style station construction method,in which the station is constructed by shield method and mining method,is put forward. In the model test study with scale ratio of 1∶10,the simulation of model stratum,excavation scheme and tunnel support scheme are introduced;and the station construction process is reappeared. The variation laws of strain,convergence of the shield segments and displacement of the soil around station tunnel are achieved. The results show that the excavation and tunnel support schemes can ensure the safety of the station under the conditions of model stratum and in-situ stress,by which the feasibility of station construction technology recommended is proved as well.
Keywords:tunnelling engineering  shield method  shallow-buried tunneling method  metro station  construction process  model test  variation rules
本文献已被 万方数据 等数据库收录!
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号