首页 | 本学科首页   官方微博 | 高级检索  
     

重大水利工程下矿产开采对其安全影响评价及加固措施研究
引用本文:武雄,汪小刚,段庆伟,贾志欣,徐能雄,孙燕冬.重大水利工程下矿产开采对其安全影响评价及加固措施研究[J].岩石力学与工程学报,2007,26(2):338-346.
作者姓名:武雄  汪小刚  段庆伟  贾志欣  徐能雄  孙燕冬
作者单位:1. 中国地质大学,水资源与环境工程北京市重点实验室,北京,100083
2. 中国水利水电科学研究院,北京,100044
摘    要:针对我国矿产资源开发给相关重大水利工程的安全带来隐患这个严重的现实问题,结合实际工程,首先根据相邻矿区开采沉陷现场监测曲线,运用数值模拟方法对杨村矿区岩土体力学参数进行反演分析;然后利用数值模拟软件中的弹塑性模型和流变模型及概率积分法开展煤层开采对西淝河左大堤安全的影响评价。根据现行国家相关规程和我国40多年堤下开采实践经验,初步提出西淝河左大堤受采动影响的抗变形控制指标和折减指标。在上述研究成果的基础上,最后推荐方案3(距堤600 m)为正式开采方案及提出综合防护措施,为解决类似工程,如南四湖、南水北调工程中线总干渠压煤开采等提供一定的借鉴。

关 键 词:水利工程  矿产开采  安全影响评价  加固措施  堤体变形
文章编号:1000-6915(2007)02-0338-09
收稿时间:2006-06-13
修稿时间:2006-09-04

STUDY ON SAFETY IMPACT ASSESSMENT AND REINFORCEMENT MEASURES OF COAL MINING UNDER IMPORTANT HYDRAULIC ENGINEERING
WU Xiong,WANG Xiaogang,DUAN Qingwei,JIAZhixin,XU Nengxiong,SUN Yandong.STUDY ON SAFETY IMPACT ASSESSMENT AND REINFORCEMENT MEASURES OF COAL MINING UNDER IMPORTANT HYDRAULIC ENGINEERING[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(2):338-346.
Authors:WU Xiong  WANG Xiaogang  DUAN Qingwei  JIAZhixin  XU Nengxiong  SUN Yandong
Affiliation:1.Beijing Key Laboratory of Water Resources and Environment Engineering,China University of Geosciences,Beijing 100083,China;2.China Institute of Water Resources and Hydropower Research,Beijing 100044,China
Abstract:Exploitation of mine resources will exert potential threats upon the safe operation of important hydraulic engineering projects in China.Based on practical projects and field monitoring curves of coal mining near an ore district,numerical simulation method is employed for the back analysis of mechanical parameters of rocks and soils in Yangcun Ore District.The impacts on the security of Xifeihe River left embankment under coal mining are evaluated with elastoplastic model,two-exponent rheological model and probability integral method.Based on current national regulations or codes and over 40-year practical mine experiences in China,the controlling indices and the reduction factor for deformation of Xifei River left embankment by coal mining are primarily presented.On the basis of above results,the proposed scheme 3(600 m far from embankment) is recommended for a formal mining scheme;and corresponding comprehensive protection measures are presented.It can offer a scientific basis and can be served as a reference to the similar projects,such as mining at Nansi Lake and mining at the major channels of Middle Route of South-to-North Water Transfer Project.
Keywords:hydraulic engineering  mining  safety impact assessment  reinforcement measures  embankment deformation
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号