首页 | 本学科首页   官方微博 | 高级检索  
     

某库区复建公路T梁更换边梁临时加固措施分析
引用本文:韩炼,胡俊,曾晖,曾东灵,王志鑫.某库区复建公路T梁更换边梁临时加固措施分析[J].低温建筑技术,2019,41(9):39-42.
作者姓名:韩炼  胡俊  曾晖  曾东灵  王志鑫
作者单位:荆州市长江河道管理局,湖北荆州,434000;海南大学土木建筑工程学院,海口,570228;五邑大学土木建筑学院,广东江门,529020;海南省水文地质工程地质勘察院,海口,570206
基金项目:海南省自然科学基金;海南省自然科学基金;海南省自然科学基金;中国博士后科学基金
摘    要:桥梁T梁更换过程中,单独更换中梁时,边梁失去约束受力不均匀极易失去稳定性,直接影响梁板吊装现场施工安全。基于力学平衡理论,研究分析了3种边梁临时加固措施的适用性,利用有限元力学建模与仿真程序构建有关加固措施的力学模型,分析与评价其加固效果。该方法确保了t梁吊装的平稳有序,对类似T梁更换施工具有一定的参考意义。

关 键 词:T梁更换  边梁失稳  临时加固  处理措施

ANALYSIS OF TEMPORARY REINFORCEMENT MEASURES SIDE BEAM DURING REPLACEMENT PROCESS OF MIDDLE T-BEAM IN RECONSTRUCTED HIGHWAY IN A CERTAIN RESERVOIR AREA
HAN Lian,HU Jun,ZENG Hui,ZENG Dongling,WANG Zhixin.ANALYSIS OF TEMPORARY REINFORCEMENT MEASURES SIDE BEAM DURING REPLACEMENT PROCESS OF MIDDLE T-BEAM IN RECONSTRUCTED HIGHWAY IN A CERTAIN RESERVOIR AREA[J].Low Temperature Architecture Technology,2019,41(9):39-42.
Authors:HAN Lian  HU Jun  ZENG Hui  ZENG Dongling  WANG Zhixin
Affiliation:(Jingzhou Yangtze River Channel Management Bureau, Hubei Jingzhou 434000,China;College of Civil Engineering and Architecture, Hainan University, Haikou 570228, China;College of Civil Engineering and Architecture, Wuyi University, Guangdong Jiangmen 529020, China;Hainan Hydrogeological Engineering Geological Survey Institute, Haikou 570206, China)
Abstract:During the replacement process of the bridge T beam, when the middle beam is replaced separately, the side beam loses its constraint and the force is uneven, and it is easy to lose stability, which directly affects the construction safety of the beam and slab lifting site.Based on the theory of mechanical balance, the applicability of three temporary reinforcement measures for side beams is studied and analyzed. The mechanical models of reinforcement measures areconstructed by using finite element mechanics modeling and simulation program, and the reinforcement effect is analyzed and evaluated.The methods ensure the smooth and orderedlifting of the T-beam, and havecertain reference significance for the similar T-beam replacement construction.
Keywords:T-beam replacement  side beam instability  temporary reinforcement  treatment plan
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号