首页 | 本学科首页   官方微博 | 高级检索  
     

有粘结预应力混凝土框架结构施工
引用本文:吴洁.有粘结预应力混凝土框架结构施工[J].建筑技术,2009,40(3):253-254.
作者姓名:吴洁
作者单位:黄石理工学院土木建筑工程学院,435003,湖北黄石
摘    要:以武汉商业服务学院体育馆预应力框架和柱预应力混凝土施工为例,着重介绍了该工程预应力梁跨度大、预应力筋单孔束数多且长、张拉用千斤顶吨位大、预应力柱及部分预应力梁为变角度张拉和张拉端节点复杂等施工难点的解决措施,为后张有粘结预应力混凝土施工提供了参考。

关 键 词:预应力梁柱  张拉控制  细部构造

CONSTRUCTION OF FRAME STRUCTURE MADE OF BONDED PRESTRESSED CONCRETE
WU Jie.CONSTRUCTION OF FRAME STRUCTURE MADE OF BONDED PRESTRESSED CONCRETE[J].Architecture Technology,2009,40(3):253-254.
Authors:WU Jie
Affiliation:WU Jie (1. School of Civil Engineering and Architecture, Huangshi Institute of Technology, 435003 Huangshi, Hubei, China)
Abstract:Prestressed concrete frame and column construction of Wuhan Commercial Service College Gym- nasium is taken as an example herein to introduce measures that are adopted to solve construction difficulties in details, such as large span of prestressed beam, many long prestressed steel single pore bundle, high tonnage of prestressing hoisting jack, variable prestressing angle of prestressed column and partial prestressed beam and complex prestressing end nodes, providing references for post-tensioning bonded prestressed concrete construction.
Keywords:prestressed beam column  prestressing control  construction detail
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号