南京城北污水处理厂测量技术
引用本文:庄桂成,葛明.南京城北污水处理厂测量技术[J].建筑技术,2005,36(11):818-819.
作者姓名:庄桂成  葛明
作者单位:中建八局工业设备安装有限责任公司,210046;江苏建科建设监理有限公司,210008
摘    要:南京城北污水处理厂施工测量过程中,按照分级布网、逐级控制的原则进行现场测量控制,既满足了规范要求,又便于施工质量控制,且缩短了测量放样时间,提高了经济效益。

关 键 词:施工测量  放样  定位  精度  标高
文章编号:1000-4726(2005)11-0818-02
收稿时间:2005-09-20
修稿时间:2005-09-20

SURVEY TECHNOLOGY OF NANJING NORTH SEWAGE TREATMENT PLANT
ZHUANG Guicheng,GE Ming.SURVEY TECHNOLOGY OF NANJING NORTH SEWAGE TREATMENT PLANT[J].Architecture Technology,2005,36(11):818-819.
Authors:ZHUANG Guicheng  GE Ming
Affiliation:ZHUANG Guicheng GE Ming
Abstract:In the construction survey of Nanjing North Sewage Treatment Plant site survey and control were carried out in the principle of "setting up the net section by section and control in grades" which not only met the code requirement but also facilitated construction quality control shortened the time for surveying and setting out and improved economical benefits.
Keywords:construction survey  setting out  positioning  precision  elevation