首页 | 本学科首页   官方微博 | 高级检索  
     

顶管隧道近距离穿越既有地铁盾构区间设计
引用本文:黎建.顶管隧道近距离穿越既有地铁盾构区间设计[J].山西建筑,2014(7):188-189.
作者姓名:黎建
作者单位:中铁隧道勘测设计院有限公司,天津300133
摘    要:结合成都市犀浦镇龙梓万片区电力隧道工程实例,针对顶管隧道施工力学进行了研究,分析了工程设计要点和施工技术控制要领,并对既有地铁盾构区间进行了受力模拟计算和安全性分析,为类似工程积累了一定经验。

关 键 词:电力隧道  穿越  既有地铁区间  模拟计算

The interval design of pipe jacking tunnel close quarters crossing existing metro shield
LI Jian.The interval design of pipe jacking tunnel close quarters crossing existing metro shield[J].Shanxi Architecture,2014(7):188-189.
Authors:LI Jian
Abstract:Abstract: Combining with the electric power tunnel engineering examples of Longziwan district Xipu Chengdu, researched the pipe jacking tunnel construction mechanics, analyzed the key points of engineering design and construction technology control key methods, and made the force simu- lation calculation and safety analysis on existing metro interval, accumulated certain experience for similar engineering.
Keywords:Key words: power tunnel  crossing  existing metro interval  simulation calculation
本文献已被 CNKI 维普 等数据库收录!