某深水码头驳岸工程中冲孔桩施工质量控制
引用本文:宋广明.某深水码头驳岸工程中冲孔桩施工质量控制[J].山西建筑,2014(17):71-72.
作者姓名:宋广明
作者单位:天津华勘集团有限公司,天津300181
摘    要:介绍了冲孔灌注桩在深水码头驳岸工程中的施工工艺,针对冲孔桩施工工艺并结合工程实际特点,总结了桩位、冲孔、终孔、清孔等施工过程质量控制要点,指出把控好质量控制关键点对提高工程质量具有重要作用。

关 键 词:冲孔灌注桩  施工工艺  质量控制  要点

The quality control of punching hole pile construction in a deep water wharf revetment engineering
SONG Guang-ming.The quality control of punching hole pile construction in a deep water wharf revetment engineering[J].Shanxi Architecture,2014(17):71-72.
Authors:SONG Guang-ming
Affiliation:SONG Guang-ming (Tianjin Huakan Group Limited Company, Tianjin 300181, China)
Abstract:This paper introduced the construction technology of punching hole bored pile in deep water wharf revetment engineering,according to the punching hole bored pile construction technology,and combining with the engineering actual characteristics,summarized the quality control key points of pile spacing,punching hole,final hole,hole cleaning and other construction technologies,pointed out that good quality control key point had important role to improve the engineering quality.
Keywords:punching hole bored pile  construction technology  quality control  key point