2000m~2钢筋混凝土双曲线冷却塔倒模施工技术
引用本文:王鹏.2000m~2钢筋混凝土双曲线冷却塔倒模施工技术[J].山西建筑,2012,38(8):116-118.
作者姓名:王鹏
作者单位:中国二十冶集团有限公司项目监管部,上海,201900
摘    要:以某发电厂2 000 m2钢筋混凝土双曲线冷却塔工程为例,对三角架倒膜施工方法进行了介绍,分别阐述了倒模系统设计、施工方案及具体的施工控制措施,指出该方法结构简单,施工质量可靠,便于推广,大、中、小型塔施工均可采用。

关 键 词:冷却塔  悬挂式三角架  倒模系统  施工控制

On reverse mould construction technique for 2000 m~2 reinforced concrete double-curve cooling tower
WANG Peng.On reverse mould construction technique for 2000 m~2 reinforced concrete double-curve cooling tower[J].Shanxi Architecture,2012,38(8):116-118.
Authors:WANG Peng
Abstract:Taking the 2 000 m2 reinforced concrete double-curve cooling tower project of some power plant as the example,the paper introduces the tripod reverse mould construction method,illustrates the reverse mould system design,the construction scheme,and factual construction controlling measures,and points out the method has simple structure,reliable construction quality,so it can be further extended and adopted in large,middle and small tower projects.
Keywords:cooling tower  hanging tripod  reverse mould system  construction control