首页 | 本学科首页   官方微博 | 高级检索  
     

大型热水热网两级泵中间定压方式
引用本文:李朝阳,冯继蓓,贾震,唐占龙,付强.大型热水热网两级泵中间定压方式[J].煤气与热力,2008,28(6):14-17.
作者姓名:李朝阳  冯继蓓  贾震  唐占龙  付强
作者单位:1. 北京市煤气热力工程设计院有限公司,北京,100032
2. 国电承德热电有限公司,河北,承德,067002
摘    要:介绍了定压点设置在两级串联循环泵之间的两级泵中间定压补水方式.结合工程实例,对地形复杂的供热系统,比较了采用旁通管定压补水方式、两级泵中间定压补水方式的运行效果,两级串联循环泵中间定压补水方式的效果更好.

关 键 词:供热管网  水压图  定压点  定压补水

Pressurization Method during Two-stage Pumps for Large-type Hot-water Heat-supply Network
LI Zhao-yang,FENG Ji-bei,JIA Zhen,TANG Zhan-long,FU Qiang.Pressurization Method during Two-stage Pumps for Large-type Hot-water Heat-supply Network[J].Gas & Heat,2008,28(6):14-17.
Authors:LI Zhao-yang  FENG Ji-bei  JIA Zhen  TANG Zhan-long  FU Qiang
Abstract:The pressurization method of setting pressurization point between two-stage series circu- lating pumps is introduced.Combined with engineering example,for the heat-supply system in complicat- ed terrain,the operation results of the pressurization method by bypass pipe and the pressurization method of setting pressurization point between two-stage series circulating pumps are compared,and the latter has better result.
Keywords:heat-supply network  pressure diagram  pressurization point  pressurization by make-up water  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号