广州国际会展中心展览大厅钢结构安装技术 |
| |
引用本文: | 陈刚.广州国际会展中心展览大厅钢结构安装技术[J].广州建筑,2003(6):20-23. |
| |
作者姓名: | 陈刚 |
| |
作者单位: | 广州市第四建筑工程有限公司,广州,510220 |
| |
摘 要: | 广州国际会展中心展览大厅屋盖钢结构现为国内跨度最大的张弦桁架结构,为该工程的重点、难点,具有起吊重量大、吊装难度高、工期紧迫等特点,本文主要介绍展览大厅张弦桁架的吊装技术。
|
关 键 词: | 屋盖钢结构 张拉弦桁架 整体平移 |
Construction of Roof Steel Structure of Guangzhou International Meeting and Exhibition Center Exhibition Hall |
| |
Authors: | CHEN Gang |
| |
Affiliation: | Guangzhou No.4 Construction Engineering Co. Ltd. Guangzhou 510220 |
| |
Abstract: | It was a difficult problem to construct the project of the Guangzhou international meeting and exhibition center , for the installation technique of the roof steel structure of the exhibition hall. It is the biggest span pre -stressing chord truss in china. The project has the characteristic of huge lifting weight, difficult to lift and short time limit for this project. This article introduces the steel structure installation technique of the exhibition hall. |
| |
Keywords: | steel structure of roof pre-stressing chord truss whole truss horizontal transportation |