首页 | 本学科首页   官方微博 | 高级检索  
     

填砂分段压裂技术在页岩油套变水平井的应用
引用本文:王金刚,孙虎,任斌,尹俊禄.填砂分段压裂技术在页岩油套变水平井的应用[J].石油钻探技术,2021,49(4):139-142.
作者姓名:王金刚  孙虎  任斌  尹俊禄
作者单位:1.中国石油集团川庆钻探工程有限公司长庆井下技术作业公司,陕西西安 710018
基金项目:国家科技重大专项“页岩气/页岩油连续管储层改造配套作业技术”(编号:2016ZX05023-006)部分研究内容
摘    要:针对井筒满足承压要求,但由于套管变形不能下入常规压裂工具进行分段压裂的页岩油水平井,通过极限填砂形成缝内砂塞,实现对已压裂层段的有效封隔,采用水平井填砂分段压裂技术进行分段压裂。为了不增加新的设备,研究形成了“尾追填砂”和“吹填缝口”2种填砂模式。长庆油田在华H40平台进行了页岩油套变水平井填砂分段压裂试验,累计填砂压裂8段,各段破裂压力均不一样,封堵效果可靠,施工成功率100%。现场试验结果表明,以“尾追填砂”填砂模式为主、“吹填缝口”填砂模式为辅,可以形成缝内砂塞,有效分隔已压裂层段,实现套变页岩油水平井的分段压裂,解决常规压裂工具无法下入的问题。 

关 键 词:页岩油    水平井    套管变形    填砂分段压裂    长庆油田    华H40平台
收稿时间:2021-04-28

Application of Staged Sand Filling Fracturing Technology in Horizontal Shale Oil Wells with Deformed Casings
Affiliation:1.Changqing Downhole Service Company, CNPC Chuanqing Drilling Engineering Company Limited, Xi’an, Shaanxi, 710018, China2.National Engineering Laboratory for Exploration and Development of Low-Permeability Oil & Gas Fields, Xi’an, Shaanxi, 710018, China3.Changqing Command Post, CNPC Chuanqing Drilling Engineering Company Limited, Xi’an, Shaanxi, 710018, China
Abstract:In some horizontal shale oil wells, the wellbore can meet the pressure-bearing requirement, but conventional fracturing tools fails to run in them due to casing deformation. To effectively pack the fractured intervals, the technology of staged sand filling fracturing in horizontal wells was adopted and extreme sand filling was used to form sand plugs in the fractures. Two sand filling modes, which included tail sand filling and fracture blowing, were formed to avoid introducing new equipments. In the Platform Hua H40 of the Changqing Oilfield, tests of staged sand filling fracturing were conducted in the horizontal shale oil wells with deformed casings. Eight stages were fractured by sand filling and the fracturing pressure varied at each stage, with good plugging results and a successful treatment operation rate of 100%. The field results demonstrate that sand filling is dominated by tail sand filling and assisted by fracture blowing, and sand plugs in the fractures can be formed to effectively isolate the fractured intervals. Finally, the staged fracturing of horizontal shale oil wells with deformed casings can be achieved, thereby solving the failure of running conventional fracturing tools. 
Keywords:
点击此处可从《石油钻探技术》浏览原始摘要信息
点击此处可从《石油钻探技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号