首页 | 本学科首页   官方微博 | 高级检索  
     

桥梁钢结构高强度螺栓组连接设计
引用本文:胡昊.桥梁钢结构高强度螺栓组连接设计[J].机械设计与制造,2012(3):161-163.
作者姓名:胡昊
作者单位:沈阳职业技术学院,沈阳,110045
摘    要:分析了桥梁钢结构中高强度螺栓的机械性能、拧紧力矩、摩擦面间传递的作用力及摩擦系数,针对高强度螺栓受力参数进行了分析计算,分别以结构件材料的屈服极限σs和结构件所受轴向力P作为高强度螺栓组设计和计算的依据,在保证高强度螺栓联接所能产生的强度与钢板母材的屈服极限σs强度相当,即连接结构的强度匹配的前提下,对高强度螺栓联接进行设计计算。采用此方法进行的高强度螺栓组联接设计更为合理,在实际生产运行中稳定可靠。

关 键 词:钢结构  高强度螺栓组  拧紧力矩  摩擦面  剪力  强度匹配

Connecting design of high-strength bolt set for steel construction of bridge
HU Hao.Connecting design of high-strength bolt set for steel construction of bridge[J].Machinery Design & Manufacture,2012(3):161-163.
Authors:HU Hao
Affiliation:HU Hao(Shenyang Polytechnic College,Shenyang 110045,China)
Abstract:The mechanical properties,tighten torque,the forces between friction surfaces as well as coefficient of friction of high-strength bolts of the steel construction used in bridge are analyzed;Base on force parameters of high-strength screws the analysis and calculation is made;And based on the material yield limit(σs)and the axial force(P)of structural parts;the practical calculation and design for the bolts connection are made respectively to ensure the the strength produced by high-strength bolt connecting matches with yield limit(σs)of the steel sheet,under which the design and calculation of high-strength bolt connecting are carrid out.It is verified that the design and calculation of the connection of the high-strength bolt made by adopting this method is more reasonable,and runs steadily and reliably in actual production.
Keywords:Steel construction  High-strength bolt set  Tighten torque  Friction surface  Shear force  Strength match
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号