首页 | 本学科首页   官方微博 | 高级检索  
     

基于层次分析法的变电站工程造价关键指标分析
引用本文:刘士李,朱晓虎,陈付雷,李建青. 基于层次分析法的变电站工程造价关键指标分析[J]. 工程管理学报, 2016, 0(6): 129-133. DOI: 10.13991/j.cnki.jem.2016.06.024
作者姓名:刘士李  朱晓虎  陈付雷  李建青
作者单位:国网安徽省电力公司经济技术研究院
基金项目:国家电网公司科学技术项目,安徽省哲学社会科学规划项目(AHSKQ2015D39)
摘    要:变电站工程造价影响因素众多,造价管控的难度较大,出现了变电站工程概算结余过多的现象,占用了过多的资金,造成了资金的浪费。为了有效地控制变电站工程概算,有必要研究影响工程概算的关键指标。基于安徽电网变电站工程2010~2015 年的历史造价数据,用于主成分分析对指标属性进行优化精简,应用相关分析确定了指标属性与变电站工程概算的相互关系,从而构建了变电站工程的关键指标体系。同时,在56 位专家问卷调查的基础上,应用层次分析法对变电站工程关键指标的重要性权重进行技术分析,为下一步构建变电站工程投资预测模型奠定了基础,有效地控制变电站工程概算。

关 键 词:变电站工程  造价管理  主成分分析  层次分析法

Critical Factors for Cost Management of Power Grid Projects Based on Analytic Hierarchy Process
LIU Shi-li,ZHU Xiao-hu,CHEN Fu-lei,LI Jiang-qing. Critical Factors for Cost Management of Power Grid Projects Based on Analytic Hierarchy Process[J]. Journal of Engineering Management, 2016, 0(6): 129-133. DOI: 10.13991/j.cnki.jem.2016.06.024
Authors:LIU Shi-li  ZHU Xiao-hu  CHEN Fu-lei  LI Jiang-qing
Affiliation:Anhui Electric Power Company Research Institute of Economy and Technology
Abstract:Many factors influence the costs of power grid projects,resulting in difficulty for cost estimation and management. The budgetary estimates of power grid projects often exceed actual costs,causing the waste of abundant money. In order to effectively control cost estimation of power grid projects,it is necessary to investigate the critical factors of power grid projects. Therefore,this paper applied principal component analysis on the historical data of Anhui Electric Power Company from 2010 to 2015 to identify critical factors of power grid projects. Pearson correlation analysis was also adopted to investigate linear relationships between critical factors of power grid projects and their budgetary estimates. It also used analytic hierarchy process to calculate the importance weights of critical factors. The practical suggestions were also proposed based on current results to control cost estimation of power grid projects in future.
Keywords:power grid projects  cost management  principal component analysis  analytic hierarchy process
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息