摘    要:为了解决杨税务潜山油气藏大位移井钻井完井中面临的摩阻扭矩大、井眼轨迹控制难度大、泥岩砾岩玄武岩地层钻速低、井底温度高和小间隙固井难度大等技术难点,结合区块地层特点,通过理论分析和模拟计算,优化了井身结构和井眼轨道,优选了井眼轨迹控制方式和钻井液体系,优化了钻井液性能,制定了提速和固井技术措施,形成了华北油田杨税务潜山油...

关 键 词:潜山油气藏  大位移井  钻井  完井  高温  井眼轨迹  杨税务区块
收稿时间:2020-08-25

Drilling and Completion Technologies of Extended-Reach Wells in the Yangshuiwu Buried Hill Reservoir
Affiliation:1.Research Institute of Engineering and Technology, CNPC Bohai Drilling Engineering Company Limited, Renqiu, Hebei, 062550, China2.Research Institute of Exploration and Development, PetroChina Huabei Oilfield Company, Renqiu, Hebei, 062552, China3.College of Petroleum Engineering, China University of Petroleum(Beijing), Beijing, 102249, China4.Oil Industry Training Centre, China University of Petroleum (East China), Qingdao, Shandong, 266580, China
Abstract:Drilling and completion operations in the extended-reach wells of the Yangshuiwu buried hill reservoir are facing technical challenges, such as high friction torque and bottom-hole temperature, difficult well trajectory control and small gaps in cementing, and low ROP in formations of mudstone, conglomerate, and basalt. In light of the formation characteristics, through theoretical analysis and simulation, the casing program and well trajectory were optimized, the well-trajectory control mode and the drilling fluid system were upgraded, and the performance of drilling fluid was improved. In addition, the technical measures for increasing ROP and cementing were introduced. As a result, a system of key drilling and completion technologies of extended-reach wells in the Yangshuiwu buried hill reservoir of the Huabei Oilfield was developed. The field tests of this technical system confirmed safe and smooth drilling and completion in Well T5X and Well T101X. Compared with the adjacent wells without the support of this system, the two test wells had a ROP increase of 27.4% and the drilling cycle decrease of 19.7%. The research and field tests demonstrated that this system can solve the technical difficulties encountered in the drilling and completion of extended-reach wells in the Yangshuiwu buried hill reservoir of the Huabei Oilfield, and can meet the requirements for safe and efficient drilling and completion in this area. 