华能玉环电厂1000 MW机组发电机定子劳辛格-天车组合吊装工艺
引用本文:李鹏亮. 华能玉环电厂1000 MW机组发电机定子劳辛格-天车组合吊装工艺[J]. 电力建设, 2007, 28(9): 54-56
作者姓名:李鹏亮
作者单位:天津电力建设公司,天津市,300012
摘    要:详细阐述1000MW机组发电机定子的吊装过程,包括:GYT-200C型劳辛格-天车液压提升装置吊装系统的配备和布置,用600t履带吊大钩将定子起吊、转向,用天车将定子运送到位,再利用液压提升装置将定子安放到位.

关 键 词:1000MW机组  发电机定子  吊装
文章编号:1000-7229(2007)09-0054-03
修稿时间:2007-04-11

Combined Tightwire Hydraulic-Roof Crane Technics in Huaneng Yuhuan Power Plant 1 000 MW Unit Stator Hoisting
LI Peng-liang. Combined Tightwire Hydraulic-Roof Crane Technics in Huaneng Yuhuan Power Plant 1 000 MW Unit Stator Hoisting[J]. Electric Power Construction, 2007, 28(9): 54-56
Authors:LI Peng-liang
Affiliation:Tianjin Electric Power Construction Co., Tianjin 300012, China
Abstract:The hoisting and positioning process of 1 000 MW generator stator is expatiated in this paper, including the configuration and arrangement of the GYT-200C hydraulic - roof crane lifting system, hoisting and turning with 600 t crawler crane hook, carrying the stator with roof crane, and positioning the stator with hydraulic lifting device.
Keywords:1 000 MW unit  generator stator  hoisting