首页 | 本学科首页   官方微博 | 高级检索  
     

基于AHP 和ISM 的高速铁路建设项目“PPP+EPC 模式”实施影响因素研究
引用本文:申泽宾,鲁潇. 基于AHP 和ISM 的高速铁路建设项目“PPP+EPC 模式”实施影响因素研究[J]. 工程管理学报, 2021, 35(2): 74-079. DOI: 10.13991/j.cnki.jem.2021.02.014
作者姓名:申泽宾  鲁潇
作者单位:1. 北京交通大学 经济管理学院;2. 中国电建集团铁路建设有限公司
基金项目:中国国家铁路集团有限公司项目
摘    要:为帮助社会资本参与高速铁路建设项目,推动“PPP+EPC模式”在铁路建设行业的持续发展,对高速铁路建设项目“PPP+EPC模式”实施影响因素进行研究。通过文献分析与实际调研识别高速铁路建设项目“PPP+EPC模式”实施的影响因素,对铁路PPP+EPC项目结构进行分析,提出项目主要参建方,邀请相关专家进行因素的影响评价和影响机理分析。根据影响因素分析结果提出相关对策建议,为投资建设方使用“PPP+EPC模式”参与高速铁路建设项目提供参考。

关 键 词:高速铁路建设项目  PPP+EPC模式  AHP  ISM

Research on Influencing Factors of "PPP + EPC Mode" Implementation of High-speed Railway Project Based on AHP and ISM
SHEN Ze-bin,LU Xiao. Research on Influencing Factors of "PPP + EPC Mode" Implementation of High-speed Railway Project Based on AHP and ISM[J]. Journal of Engineering Management, 2021, 35(2): 74-079. DOI: 10.13991/j.cnki.jem.2021.02.014
Authors:SHEN Ze-bin  LU Xiao
Affiliation:1. School of Economics and Management,Beijing Jiaotong University;2. Power China Railway Construction Co. Ltd.
Abstract:To help social capital participate in high-speed railway projects and promote the development of "PPP + EPC mode" in the railway construction industry, this paper evaluates the influencing factors of the implementation of "PPP + EPC mode" in high-speed railway projects. Through the literature analysis and local survey,the paper identifies the influencing factors of the implementation of "PPP + EPC mode" in high-speed railway project. Firstly,this paper analyzes the structure of the railway PPP + EPC project,puts forward the main participants of the project. Secondly,this paper invites relevant experts to carry out the factor impact evaluation and impact mechanism analysis. Finally,this paper puts forward relevant countermeasures and suggestions according to the analysis results of influencing factors,so as to provide references for the investors and constructors to use "PPP + EPC mode" to participate in high-speed railway construction projects.
Keywords:high-speed railway project   PPP + EPC mode   AHP   ISM
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号