首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
为了探究阻碍施工人员实施建筑废弃物减量化行为的主要影响因素,文章在总结国内外文献的基础上,结合实地调查和访谈设计了施工人员建筑废弃物减量化行为影响因素调查表,并针对深圳市施工人员展开调查。调查结果发现,影响施工人员采取减量化措施最主要的阻碍因素是缺乏废弃物管理方面的培训和教育、缺乏业主的支持以及减量化在施工目标管理中缺乏优先权。针对以上调查结果,提出了相应的改进建议。  相似文献   

2.
为了帮助建筑设计师及废弃物相关管理人员清晰地理解设计阶段导致建筑废弃物产生的原因,在总结国内外文献的基础上,结合访谈从建筑技术、材料管理规划、设计师行为态度、设计师能力、建筑设计、外部制度6 方面归纳了设计阶段影响建筑废弃物减量化水平的因素,并据此设计调查问卷,针对深圳市的建筑设计人员展开广泛调查。根据调查分析结果,识别出了设计阶段影响废弃物减量化水平的35 个主要因素,并据此提出了相应的措施建议。  相似文献   

3.
Waste occurs within the lifecycle of buildings, during the construction, modification and demolition phases. These construction wastes become serious environmental problems in many countries and in Turkey. However, no net data regarding the amount of construction wastes exist in Turkey. During its period of usage, frequent interior modifications are made for various reasons, particularly true for residences in Turkey, thus generating construction wastes. The primary environmental target regarding this subject should be the prevention and reduction of construction waste generation. The aim of this study is to provide suggestions regarding the prevention/reduction of waste generated due to modifications done for various purposes in residences in Turkey. To this end, a survey of homeowners in Istanbul was conducted to determine the nature and purpose of modification work done in residences. In order to come up with solutions towards reducing the construction waste generation, it is vital that these reasons are known. In light of the causes determined, suggestions for solving the problems have been developed.  相似文献   

4.
金芳华 《城市建筑》2014,(4):214-214
在建筑工程中,有许多影响建筑工程质量测定的因素,我们应对各种影响因素进行具体分析,然后找到解决方案。本文将对影响建筑工程测量质量若干因素进行以下几点分析:建筑工程质量测量概述;影响建筑工程质量测量的因素;应对影响建筑工程测量质量的因素的措施。  相似文献   

5.
Previous attempts have been made to model cash flow forecast at the tender stage using net cash flow, value flow and cost flow approaches. Despite these efforts, significant variations between the actual and modelled forecasts were still observable. The main cause identified is the issue of risk inherent in construction. Using the cost flow approach, a model is developed to assess the impacts of risk occurring during the construction stage on the initial forecast cost flow. A questionnaire survey and case study approach were employed. As a first step, a questionnaire survey was administered to UK construction contractors to determine the significant risk factors impacting on their cost flow forecast. Using mean ranking analysis, the survey yielded 11 significant risk factors. The second stage of data collection involves the collection of forecast and actual cost flow data from case study projects to establish their variations at predetermined time periods. Using the significant risk factors identified in the first phase, relevant construction professionals who worked on the case study projects were requested to score the extent of risk occurrence that resulted in the observed variations. A combination of these two sets of data was used to model the impact of risk on cost flow forecast using an artificial neural network back propagation algorithm. The model enables a contractor to predict the likely changes to a cost flow profile due to risks occurring in the construction stage.  相似文献   

6.
中国不少地方政府采取BT模式建设公共项目,但许多BT项目最终并未取得成功,因此有必要对BT项目关键成功因素进行研究。首先梳理BT项目实施流程及工作内容,结合BT项目成功标准,初步归纳影响BT项目成功的关键因素,然后用问卷调查方法对初步关键成功因素进行修正和确认,得到关键成功因素清单,然后扩大问卷调查范围确定各关键成功因素的重要性,并对重要性的调查结果从整体和按角色进行对比分析,所得结果对BT项目中的业主、实施方、监理等各参与方都有借鉴作用。  相似文献   

7.
识别施工图审查制度运行绩效关键影响因素,是提升制度运行绩效、避免盲目制度改革而产生工程质量安全监管风险的重要基础工作.以江苏模式施工图审查制度为研究对象,聚焦地区实践,通过文献分析与访谈,归纳识别出18个制度运行绩效影响因子,基于376份有效问卷的调查数据,利用因子分析法提取出5个关键影响因素,在对关键影响因素分析后给...  相似文献   

8.
政府选择代建企业的过程中,代建企业声誉能够增强代建企业的竞争力。对于代建企业声誉已经形成了相对科学的测量体系,但对声誉影响因素及其影响路径尚未得到有效的实证研究。沿用成熟的代建企业声誉测量模型,在文献研究和理论分析的基础上,得出了影响代建企业声誉的外显指标,并构建影响代建企业声誉的理论模型和研究假设。对151 家代建企业进行调查,构建结构方程对研究假设进行分析。分析结论为代建企业的企业声誉管理和政府制定相应的招标策略提供了理论支持。  相似文献   

9.
关系的质量是建设工程项目成败的关键因素之一。鉴于 PPP(公私合作关系)模式内生的项目复杂性和特殊性特征,探索 PPP 项目中关系管理的关键成功因素显得十分必要。通过文献综述和专家访谈方法获取 PPP 项目关系管理的 9 个关键成功因素,并形成调查问卷;在问卷调查的基础上,通过数据分析归纳我国 PPP 项目关系管理的现状与关键成功因素。问卷数据分析发现,高层管理者的承诺和支持、相互信任、风险的公平分担、问题/冲突解决的能力是 PPP 项目关系管理最重要的关键成功因素。此外,公共部门和私人部门对大多数关键成功因素的重要性认识不存在显著性差异。  相似文献   

10.
征地冲突影响新型城镇化建设,甚至影响和谐社会的建设。构建了征地冲突影响因素的结构模型,基于对山东省农民的实地调查问卷数据,运用结构方程模型,分析了征地冲突的关键影响因素。结果表明:征地冲突主要受3个关键影响因素的影响,影响程度最大的是经济利益,其次是法律制度和社会行政,其影响程度分别为0.95、0.92、0.89;教育程度对征地冲突影响不显著。根据研究结果提出合理的预防和治理征地冲突的措施,征地冲突的解决有利于新型城镇化建设。  相似文献   

11.
《Building and Environment》2002,37(5):539-547
This paper presents the results of a questionnaire survey, which was distributed among industrial contractors in the Eastern Province of Saudi Arabia, and formal interviews with the contractors’ officials responsible for construction safety. The intent of the survey was to gather data on those significant factors that influence the safety performance of industrial contractors. The sample survey consists of 28 companies that are involved with large volume of industrial construction activities in the Eastern Province. The paper identifies 20 main factors and 85 sub-factors and determines their level of importance based on the survey results and the analysis.  相似文献   

12.
Performance of small-scale building construction contract business poses a challenge to the sustainable development of the construction industry, particularly in developing countries like Nigeria. Small-scale construction contract business plays an important role in the economic development of any nation. In Nigeria, small-scale construction contract business has a tremendous role in the development of rural areas. This study assesses the mediation effects of client support with advance payment on cost factors that affect performance of small-scale contract businesses in Nigeria. The study identified three factors that affect cost performance of construction projects in developing countries: cash flow problems, effects of fraudulent practices, and effects of the nature of construction environments. In total, 550 survey questionnaires were administered to stakeholders in the Nigerian construction industry. Stratified proportionate random sampling method was used for the selection of respondents and 387 questionnaires were returned, with 357 used in the analysis.  相似文献   

13.
Joint ventures (JVs) have become popular because of their importance as a strategic alternative in global competition. International joint ventures (IJVs) are difficult to manage due to their complex structures involving more than two entities having different and competing objectives and strategies. Since each construction project is unique, project-specific factors are significant for the success of an IJV as well as the risks associated with the host country in which the IJV operates. In this study, the impact of host country conditions and project characteristics on IJV performance is investigated through a questionnaire survey. IJV performance is defined as a three-dimensional construct considering the performance of the project, the IJV partners, and the IJV organization itself. The results of the study suggest that project-related factors have a great impact on IJV performance. But they failed to provide evidence that IJV performance is affected by host country related risks.  相似文献   

14.
三峡库区民居建筑形态初探   总被引:3,自引:2,他引:1  
刁晓峰 《山西建筑》2010,36(5):54-56
结合三峡库区实地考察以及对瓷器口古镇建筑的实地测绘,从美学要素和建筑形态两方面诠释了川东民居的特色,并且指出考察中发现的问题与不和谐因素,以期给库区新建筑的改良和修建提供建设性意见。  相似文献   

15.
隧道工程施工过程蕴含复杂、多样的风险因素,但目前相关研究尚不完善。本研究应用问卷调查的方法,对采用矿山法施工的隧道工程项目施工过程中的风险因素进行识别和分析,总结出施工过程中重要的风险因素,为隧道工程项目施工过程的风险管理提供依据。  相似文献   

16.
发展装配式建筑,可以实现节约资源和能源、减少环境排放的效果,是我国推进建筑业供给侧改革的一项重要举措,但目前西宁市装配式建筑的发展举步维艰,速度和规模较国内同级城市仍有不小差距。 为明确影响西宁市装配式建筑发展的关键因素,进而制定更有效的地区装配式建筑产业发展政策,通过文献分析筛选影响国内装配式建筑发展的五大因素,根据专家访谈、问卷调查得出符合西宁市现状的影响因素清单,采用因子分析确定西宁市装配式建筑发展的五类关键因素;通过系统动力学建立影响因素的存量流量图进行验证分析。结果显示,西宁市装配式建筑发展应围绕政策支持力、技术经济条件、组织管理能力、技术能力、运输体系五类关键因素展开。  相似文献   

17.
ABSTRACT: This paper discusses the results of a survey conducted in 1992 in Ankara, Turkey, to develop a typology of the urban poor. It draws on poverty culture conceptualization and an empirical study done in the US. The present study was designed to identify the cultural and psychological differences among the poor. It was found that there were three types among the urban poor: doers, accommodators, and losers. The emergence of these types is explained in the historical context of the modernization, urbanization, and market-oriented economic policies in Turkey. The authors discuss the social policy implications of the findings for Turkey.  相似文献   

18.
地质危险源对天津城区管廊勘察影响与措施研究   总被引:1,自引:0,他引:1       下载免费PDF全文
高丽丽  李玉龙  路清  赵志峰  杨金瑞 《矿产勘查》2019,10(12):3023-3032
以天津市主城区综合管廊建设勘察阶段不良地质环境危险源为出发点,依据查阅的古籍资料、大量钻孔数据归纳分析和原位测试资料,并结合工程经验,分析汇总了工程勘察中人工填土、软土、新近沉积土、古河道、地下水位、地下水腐蚀性、承压水、粉(砂)土液化、地面沉降、活动断裂和岩土参数取值等11种地质因素的危险源。并针对存在的风险因素,提出了相应的建议措施。为天津市主城区的综合管廊建设规避勘察风险,提高建设安全性提供了参考。  相似文献   

19.
《Building and Environment》2004,39(11):1349-1357
This paper reports a study of quality in the ready-mixed concrete industry in Turkey. Ready-mixed concrete and total quality management are first considered in general, followed by an examination of the applicability of quality management systems to the ready-mixed concrete industry. A survey of 18 ready-mixed concrete plants in Turkey is reported. The survey used a questionnaire consisting of 35 questions directed to managers, engineers, and other technical staff of the plants. The results are evaluated by means of several statistical methods. The implications of the study for quality control in the Turkish ready-mixed industry are then discussed.  相似文献   

20.
为有效管理和控制我国建设工程跟踪审计风险, 以建设工程跟踪审计文献为研究基础,从审计客体风险、审计环境风险和审计主体风险三个维度选取了 22 个风险因素构建建设工程跟踪审计风险指标体系, 结合专家访谈和问卷调查, 运用建设工程跟踪审计贝叶斯网络模型的参数学习、诊断推理、 敏感性分析和最大致因链分析深入探究建设工程跟踪审计风险因素间的内在关系, 揭示风险因素间的作用机理, 找出主要风险因素, 并提出降低跟踪审计风险的建议。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号