首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
独家旺 《山西建筑》2014,(3):241-242
针对目前民用建筑工程成本控制现状,阐述了成本管理的内容及原则,从组织、技术、经济三方面提出了成本控制措施,并明确了成本控制的对象,从而使建筑企业实现经济效益最大化。  相似文献   

2.
郭生明 《山西建筑》2013,(34):238-239
介绍了施工项目成本管理的发展,阐述了施工项目成本管理中存在的问题,并结合这些问题,对施工项目成本管理和控制的方法进行了科学的探究,对施工项目成本管理与控制具有积极的指导意义。  相似文献   

3.
Cost estimation is a crucial factor for the success of an engineering project. This element is even more important at the initial stages of design where decisions should be taken based on the more accurately available cost data. In underground construction projects especially, where the variability of the geotechnical conditions can change initial estimates, the accurate estimation of the construction cost from the preliminary phases of the project can minimize cost overrun issues as well construction claims and disputes. The purpose of this paper is to provide insight in cost estimation for underground projects focusing on tunnels. For this reason, the analysis of construction cost is undertaken, based on data from a set of 9 tunnels that have been constructed in Greece. The analysis presented focuses on the excavation and temporary support cost with respect to the geotechnical conditions encountered. Although the cost is influenced by many parameters, through the analysis of past data using the Case Base Reasoning approach, valuable lessons can be learned by decoding the effect of the ground conditions on the construction cost. The construction cost of the Greek tunnels is estimated for 2011 price levels and it is expressed though range estimation for 5 rock mass categories that were identified. Furthermore, a direct linkage between construction cost and the encountered geotechnical conditions, as expressed in GSI values, are made in an attempt to capture the general trend of construction cost in terms of €/m3 and €/m. The findings can be used as a first order assessment in order to have a representative estimation of the tunneling cost from the initial stages of project design.  相似文献   

4.
陈贻民 《山西建筑》2007,33(32):253-254
从竞标性施工组织设计和指导性施工组织设计两方面对工程项目施工的组织设计编制进行了介绍,分析了施工企业在编制工程项目设计时存在的问题,并探讨了施工项目施工组织设计与施工成本之间的关系,以提高施工企业的经济效益。  相似文献   

5.
浅谈施工项目中的成本控制   总被引:3,自引:2,他引:1  
在对成本控制的概念、成本控制原则进行阐述的基础上,分析研究了建筑施工项目中成本控制的途径,证明了有效的成本控制将促进企业不断挖掘潜力,提高经济效益,提升企业整体的竞争力。  相似文献   

6.
王彩云 《山西建筑》2007,33(30):270-271
从合理设置项目管理机构,建立项目经理成本责任制,制定科学、经济的施工方案,做好现场安全文明施工管理,控制人工费、材料费及机械使用费方面等对建设工程企业如何做好成本管理工作进行了阐述,以使施工企业获得较大的经济效益。  相似文献   

7.
建设工程项目造价管理是工程建设过程中的重要部分,造价管理必须贯穿项目各阶段,包括决策设计阶段、项目实施阶段、竣工验收阶段。良好的造价管理可以节约成本、提升利润和缩短工期。文章就工程造价控制的意义和相关措施进行具体分析论述。  相似文献   

8.
浅议施工项目成本控制   总被引:2,自引:1,他引:1  
吉卫华 《山西建筑》2010,36(3):270-271
介绍了工程项目成本的构成,阐述了项目成本管理的任务,从项目资源计划、项目成本估算,项目成本预算和项目成本控制等方面进行了探讨,以加强施工项目成本管理,达到有效节约项目成本的目的。  相似文献   

9.
施工项目成本计划简述   总被引:1,自引:0,他引:1  
耿传锋 《山西建筑》2010,36(17):234-235
针对目前国内施工企业成本计划性不强的现象,重点对施工项目成本计划编制程序、编制方法及其重要性进行了论述,通过精心编制成本计划,确立成本目标,从而使得成本控制更有针对性。  相似文献   

10.
周卿 《山西建筑》2014,(16):283-284
简要介绍了工程项目施工成本的概念,并从当前工程项目施工过程所存在的问题出发,提出了优化施工成本管理的可行办法,以提升企业总体管理水平,减少企业发展过程中的阻碍,最终实现经济效益和社会效益的双丰收。  相似文献   

11.
何书强 《山西建筑》2009,35(36):268-269
针对施工企业成本控制的重要性,结合施工管理经验,就如何推行精细化管理、加强成本管控进行了探讨,以切实有效地管理好、控制好项目成本,提高工程的经济效益和社会效益。  相似文献   

12.
王明东 《山西建筑》2014,(15):280-282
介绍了建筑施工项目精细化管理的内涵,对精细化管理的内容———两个建设、四项管理作了一一阐述,以期最大限度地减少管理所占用的资源、降低管理成本,真正做到决策科学化、管理系统化、运行高效化。  相似文献   

13.
程海玲 《福建建材》2009,(1):114-116
作业成本法在进行成本计算和分配上所取得的成就,在制造业企业中已经得到了大量的实际印证,它能给企业带来的实际效益是企业采用它的最好的理由.在施工成本管理中也可以采用作业成本管理,真正做到对施工成本的准确确定和核算,实现对成本发生动因的管理和控制,做到成本的有效降低。  相似文献   

14.
分析业主和承包商共同延误下业主指令加速施工时,加速施工费用索赔的争议焦点。提出并分析共同延误下加速施工费用索赔计算的三个原则:先延误先使用原则、利于业主原则和利于承包商原则。  相似文献   

15.
周文冠 《山西建筑》2012,38(7):261-262
根据铁路工程项目的特点,就工程项目成本管理与控制的各环节提出观点,并给出了具体的控制方法,包括明确经营目标、落实经济责任、优化施工方案、落实责任预算、加强过程控制等,并强化合同管理与索赔意识,从而全面提升项目管理水平。  相似文献   

16.
浅议建设工程项目成本管理   总被引:1,自引:1,他引:0  
针对项目成本管理在建设工程中的重要性,从施工前、施工过程和竣工验收阶段提出了相应的成本控制措施,指出只有承包商加强项目施工的成本管理,才能在激烈的建筑市场竞争下取得良好的经济效益。  相似文献   

17.
Rework can have adverse effects on the performance and productivity of construction projects. Techniques such as artificial neural networks (ANN) are widely used for prediction and classification problems and thus can be used to map the causes and effects of rework. The traditional back propagation neural network and general regression neural network data from 112 Hong Kong construction projects are used to examine the influence of rework causes on the various project performance indicators such as cost overrun, time overrun, and contractual claims. The results from this research could be used to develop forecasting systems and appropriate intelligent decision support frameworks for enhancing performance in construction projects. Furthermore, analysis of the neural network results indicates that the general regression neural network architecture is better suited for modelling rework causes and their impacts on project performance.

Les travaux de reprise peuvent avoir des effets néfastes sur les performances et la productivité dans les projets de construction. Des techniques comme les réseaux neuronaux artificiels (AAN) sont largement utilisés pour résoudre les problèmes de prévision et de classification et peuvent donc servir à cartographier les causes et les effets des travaux de reprise. Les données de réseaux neuronaux classiques à rétropropagation et les données de réseaux neuronaux à régression générale provenant de 112 projets de construction à Hong Kong sont utilisées pour examiner l'influence des travaux de reprise sur les divers indicateurs de performances de projets, comme les dépassements de coûts, les dépassements de délais et les réclamations contractuelles. Les résultats de cette recherche pourraient servir à développer des systèmes de prévision et des cadres appropriés et intelligents de soutien à la décision pour améliorer les performances de projets de construction. En outre, l'analyse des résultats de réseaux neuronaux indique que l'architecture du réseau neuronal à régression générale convient mieux à la modélisation des causes des travaux de reprise et à leurs conséquences sur les performances des projets.

Mots cle´s: projet de construction, dépassement des coûts, productivité, performances de projets, travaux de reprise, dépassement des délais  相似文献   

18.

The UK construction industry suffers the largest number of bankruptcies of any sector of the economy, with many companies failing because of poor financial management, especially inadequate attention to poor cash flow forecasting. The financial model outlined in this paper demonstrates the potential application of simulation methods in assessing financial alternatives.  相似文献   

19.
Characteristics of transnational projects are outlined and their environment reviewed with a view to highlighting those external variables that affect managerial functions in such projects. Reference is made to the published experiences on some macroprojects executed in various parts of the world. It is concluded that the know-how in this field is at best sketchy and unrelated to the actual managerial needs. Many of the present techniques and associated infrastructures are inadequate for handling transnational projects. Specifically, the techniques for the estimation of resources and costs, for the handling of information requirements and for financial transactions are substantially underdeveloped and unreliable.  相似文献   

20.
浅析建筑工程施工阶段造价管理与控制   总被引:1,自引:0,他引:1  
根据施工企业自身的特点,从施工技术管理人员的经济意识、合同管理、施工过程控制、工程变更的造价控制等方面探讨了如何加强施工阶段的造价管理与控制,对工程项目的成本控制及工程造价资料收集、分类作了论述,以使施工企业实现经济效益最大化.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号