首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 218 毫秒
1.
Safety climate can benefit contractors, specialty contractors, and owners of industries by providing them with the knowledge of attitudes and perceptions that can help to consistently achieve better safety performance. The objective of this research was to determine safety climate that would enhance safety culture and positively impact perceived safety performance on construction projects. A safety climate questionnaire survey was conducted on the construction sites of a leading construction company and its subcontractors in Hong Kong. Approximately, 1,500 hard copy questionnaires were distributed and the response rate was excellent, resulting in 1,120 valid questionnaires being collected from 22 construction projects. By means of factor analysis, two underlying safety climate factors were extracted, accounting for 43.9% of the total variance. Multiple regression analysis confirmed that these climate factors, “management commitment and employee involvement” and “inappropriate safety procedure and work practices” were significant predictors of workers’ perceptions of safety performance. The findings indicated that the relationship between perceived safety performance and “inappropriate safety procedure and work practices” was inversely correlated. The results suggest that safety climate can be used as an effective measure of assessing and improving site safety for projects under construction. The findings of this study and the methodology might be useful for research at other construction sites in other regions and countries. This work provides useful information for project managers and safety practitioners who desire to improve safety climate and safety performance on construction sites.  相似文献   

2.
The need to match project managers’ (PMs) performance measures onto projects of both unique and similar characteristics has long since been acknowledged by researchers. The need for these measures to reflect the various phases of the project life cycle has also been contended in the recent past. Here, a competency-based multidimensional conceptual model is proposed for mass house building projects (MHBPs). The model reflects both performance behaviors and outcome in predicting the PMs’ performances at the conceptual, planning, design, tender, construction, and operational phases of the project life cycle. Adopting a positivist approach, data elicited for the construction phase is analyzed using multiple regression techniques (stepwise selection). Out of a broad range of behavioral metrics identified as the independent variables, the findings suggest the best predictors of PMs’ performances in MHBPs at the construction phase are: job knowledge in site layout techniques for repetitive construction works; dedication in helping works contractors achieve works schedule; job knowledge of appropriate technology transfer for repetitive construction works; effective time management practices on house units; ability to provide effective solution to conflicts, simultaneously maintaining good relationships; ease with which works contractors are able to approach the PM and volunteering to help works contractors solve personal problems. ANOVA, multicollineriality, Durbin–Watson, and residual analysis, confirm the goodness of fit. Validation of the model also reflected reasonably high predictive accuracy suggesting the findings could be generalized. These results indicate that the model can be a reliable tool for predicting the performance of PMs in MHBPs.  相似文献   

3.
Despite dramatic improvements in recent decades, the construction industry continues to be one of the industries with the poorest safety records. Recent improvements are due, in part, to the concerted efforts of owners, contractors, subcontractors, and designers. While past safety studies have investigated the roles of contractors, subcontractors, and designers, the owner’s impact on construction safety has not been previously investigated. This paper will present the results of a study on the owner’s role in construction safety. Data were obtained by conducting interviews on large construction projects. The relationship between project safety performance and the owner’s influence was examined, with particular focus on project characteristics, the selection of safe contractors, contractual safety requirements, and the owner’s participation in safety management during project execution. By identifying practices of owners that are associated with good project safety performances, guidance is provided on how owners directly impact safety performance.  相似文献   

4.
The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.  相似文献   

5.
Change orders are a source of many disputes in today's construction industry. The issue at hand is whether or not the execution of change orders work has a negative impact on overall labor efficiency on a construction project. Previous literature demonstrates evidence that change orders affect labor efficiency. Attempts have been made to quantify these impacts by many researchers, with limited success. Using the electrical construction industry, a research study has been conducted to quantify the impacts of change orders on labor efficiency. In this paper, results of hypothesis testing and regression analysis are presented. A linear regression model that estimates the loss of efficiency, based on a number of independent variables, is also presented. The independent variables used in this model are (1) qualitative and quantitative criteria used to determine whether projects are impacted by changes or not; (2) the estimate of change order hours for the project as a percentage of the original estimate of work hours; (3) the estimate of change order hours for the project; and (4) the total number of years that the project manager had worked in the construction industry. Additional projects were used to validate the model, with an average error rate of 5%. The results of this research study are useful for owners, construction managers, general contractors, and electrical specialty contractors, because they provide a means to estimate the impact of a change order under certain project conditions. This research also identifies factors, which, when understood and effectively managed, may be used to mitigate the impact of a change order on project costs and efficiency.  相似文献   

6.
Safety of construction projects may be affected by various factors such as types and scale of projects, construction methods, safety management procedure, climate, site conditions, etc. Among them is the quality of design in relation to safety. Presently, however, designers typically are not involved in construction safety. They are often uncertain of their responsibilities in relation to construction safety and fail to be responsible for avoiding or reducing safety-related risks. In this study, the concept of safety impact assessment to achieve “design-for-safety” in the design phase is introduced. For this purpose, a safety impact assessment model was devised, and a methodology using the risk-based safety impact assessment approach for open-cut type underground construction projects in Korea is suggested. The suggested methodology includes a safety information survey, classification of safety impact factors caused by design and construction, and quantitative estimation of magnitude and frequency of safety impact factors. A checklist which can be easily used for assessing the safety performance of design products is also proposed. A real-world case study on the safety impact assessment of a subway construction project in Korea is also provided in the paper.  相似文献   

7.
Sustainable, or “green,” rating systems, such as the United States Green Building Council’s Leadership in Energy and Environmental Design (LEED), are leading to changes in the way owners, designers, and contractors approach the design, construction, and operation of buildings. The processes and features included in green design and construction may have positive and/or negative impacts on construction worker safety and health. This paper presents the findings of a research study of the impact of green building design and construction practices on construction worker safety and health. Occupational Safety and Health Administration (OSHA) recordable and lost time injury and illness data from green projects (as identified by LEED) and from nongreen projects was collected through a structured questionnaire survey. The data collected was analyzed to test for the presence of a difference in OSHA recordable incident rates (RIRs) and lost time case rates (LTCRs) between green and nongreen projects. It was found that there was suggestive, but inconclusive evidence of a statistically significant difference in the RIRs of the green and nongreen building projects included in the study. No statistically significant difference was found between the LTCRs for the green and nongreen projects included in the study. The study findings provide valuable information to the construction industry for the purposes of project safety planning and the assessment of safety and health on projects.  相似文献   

8.
9.
Safety issues have gained vital importance throughout the construction industry. Many construction companies around the world are implementing safety, health, and environmental management systems to reduce injuries, eliminate illness, and to provide a safe work environment in their construction sites. This paper describes an exploratory study of site safety management in construction sites’ environments. It explains a successful, modern safety, health and environmental management system for a leading construction company based in Hong Kong. A typical site-specific safety plan was utilized to provide safety guidance throughout the construction project. A safety management survey was conducted to determine the status of safety in the construction sites. All employees of the company and its subcontractors participated in the survey from 20 construction projects. In total, 1,022 valid records were obtained from the construction sites. The analysis provided useful information on eight aspects of construction safety, including safety policy and standards, safety organization, safety training, inspecting hazardous conditions, personal protection program, plant and equipment, safety promotion, and management behavior. The findings of the survey provide practical knowledge to construction project managers and construction safety practitioners in order to make their sites safer. Insights and discussions are given in this paper.  相似文献   

10.
One area within the construction industry that has dramatically changed is the growth of open shop construction. This growth suggests that open shop general contractors may have a competitive advantage over union general contractors. This paper investigates productivity and wage rate variances between Colorado open shop and union general contractors on projects completed since January 1981. Though there is little productivity variance, a significant variance of wage rates indicate the Colorado open shop general contractor presently has a clear overall labor advantage. The productivity and wage rate variance of 29 individual project job tasks were investigated. Data was collected from 35 union and 20 open shop contractors' project labor costs reports. Additional information was collected during interviews with representatives of eleven general contractors. The productivity and wage rate variances are described by individual job tasks; by the union craft jurisdictions of laborers, carpenters, ironworkers, and cement finishers; and by an overall comparison between open shop and union general contractors.  相似文献   

11.
Over the past few decades, both the guaranteed maximum price (GMP) and target cost contracting (TCC) arrangements have been regarded as alternative integrated procurement strategies for clients to mitigate risks, minimize claims, integrate the diverse interests of a complex construction project, and offer incentives to provide value-added services. However, the adoption of GMP/TCC contracts may also generate significant risks and difficulties that merit considerable attention. This paper aims to provide a concise review of the potential pitfalls of the GMP/TCC scheme in general and identifies the key risk factors and potential difficulties associated with GMP/TCC in comparison with other procurement strategies in construction in particular via an empirical survey of clients, contractors, and consultants in Hong Kong. The survey data gleaned from 45 valid replies were analyzed using the mean score ranking technique, Kendall’s concordance test, and Spearman’s rank correlation test. The survey results indicated that “involvement of inexperienced or claim-conscious contractors in a project procured by a GMP/TCC contract” was considered to be the most significant risk factor; while “design development must keep pace with main contractor’s program for tendering the domestic subcontractors’ works packages” as the major difficulty in implementing GMP/TCC projects. The research findings derived from this study are particularly essential in assisting the contracting parties to mitigate the detriments brought about by potential risks or difficulties when embarking on GMP/TCC contracts. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to GMP/TCC success for future construction projects.  相似文献   

12.
International construction projects provide opportunities for developing countries to advance in the global economy and for international construction and design firms to increase their profit and market share. Despite the attractive opportunities that international construction offers, international contractors are faced with many challenges and difficulties when moving into international markets. Many risks are associated with international construction, whether external or project-specific risks. Those risks affect how contract clauses are written, including the dispute resolution clause. This paper discusses the different dispute resolution methods employed in international construction contracts and develops an analytical framework (DRM-Risk matrix) suggesting the use of specific dispute resolution methods depending on the risks expected in the project. The matrix may eventually help international contractors in the selection of the appropriate dispute resolution method during contract formation depending on the risks involved in a project.  相似文献   

13.
The construction industry is well known for its complexities and inefficiencies in dealing with human safety and construction processes. The industry itself has been notorious for its high casualty records over many years. Especially in Hong Kong, the concept of improving safety in construction sites has only started to be developed in recent years. The government has set up new ordinances and regulations, and companies are willing to invest more on this issue before the construction commences. Nowadays in Hong Kong, from the small to the sizable, nearly all construction companies have their own site safety plans indicating safety guidelines and protective measures to achieve certain safety standards on the project sites. However, when viewing the past records published by the Labour Department, no trend in injury frequency reduction was noted. Consequently, an effort has been made in this report to compare three different site safety plans of three renowned civil and building contractors were investigated. Moreover, in order to review the effectiveness of the prevailing site safety plans and the safety performance of the contractors, a questionnaire survey targeting some site staff was conducted to solicit their opinions on the implementation of site safety plans. From the results of the questionnaire survey the authors determined that the construction companies are now regarding occupational health and safety as prerequisites of all the site operations.  相似文献   

14.
Planning is an essential function of project management. Yet, many small- and medium-sized contractors do a relatively poor job of operational planning. Better prebid plans will reduce costs, shorten schedules, and improve labor productivity. Unfortunately, the published literature offers little guidance for smaller contractors on what constitutes effective planning. Most papers describe planning as a macrolevel process for owners. Most emphasize scope definition for industrial projects. This paper describes a microlevel planning process for contractors. It consists of eight steps which are: (1) assess contract risks; (2) develop a preliminary execution plan; (3) develop site layout plans; (4) identify the sequences that are essential-to-success; (5) develop detailed operational plans; (6) develop proactive strategies to assure construction input into design; (7) revise the preliminary plan; and (8) communicate and enforce the plan. The entire process is illustrated with a case study project and is fully illustrated with figures which show how to integrate the work of multiple contractors, keep key resources (crews or equipment) fully engaged with no downtime, provide time buffers so the work of follow on crews can be efficiently done, expedite the schedule using multiple work stations and concurrent work, ways to communicate the work plan to the superintendent and foremen, and how to assess the feasibility of various work methods. The steps are easy to understand and implement. They will yield immediate positive results.  相似文献   

15.
Briefing is the process by which client requirements are identified, clarified, and articulated in the early design stage of construction projects. It is crucial to the successful delivery of construction projects. Considerable research has been conducted in briefing during the past two decades. However, researchers consider many current briefing practices to be inadequate, and little research has been done in sufficient depth to explore briefing variables in the construction industry. This paper introduces a comprehensive framework of the variables that have an impact on construction project briefing. A questionnaire survey was conducted to validate these variables among project managers and architects in Hong Kong, the United Kingdom, and the United States. The results indicate that although no significant differences existed between the samples in the United Kingdom and the United States on the variables for construction project briefing, the views of the samples in Hong Kong deviated from the two Western countries. The Western professionals have more positive answers to most statements in the questionnaire. The findings have significant implications for industry practitioners in producing their guidelines for the briefing process and for writers in drafting how-to briefing guide for construction projects.  相似文献   

16.
The competitive nature of the construction industry has motivated many specialty contractors to search for ways to improve efficiency by increasing their quality and decreasing their costs in order to strengthen their market share. As a result, contractors are turning to “better planning” as a method for improving their efficiency and, consequently, increasing their profitability. In fact, a consensus exists in the construction industry that more formalized preconstruction planning is necessary to remain successful in an increasingly competitive industry. This paper presents a model electrical preconstruction planning process that was crafted from outstanding processes used on several successful electrical projects. Furthermore, a method to evaluate the effectiveness of planning, by comparing actual planning to the model process, is briefly introduced. From this assessment, “effective planning” was correlated to project outcome, and evidence is provided that better planning is, indeed, related to successful performance.  相似文献   

17.
Collaborative Negotiation Behaviors in Thai Construction Projects   总被引:1,自引:0,他引:1  
When construction contractors encounter difficulties and changes from what was originally stated in contract documents, fair and equitable adjustments are required. Owners use construction management (CM) consultants to act as primary negotiators on their behalf. Throughout project execution, seamless negotiations take place that are intended to improve the relationships that are critical to successful project delivery. This study investigates the collaborative behaviors between CM consultants and contractors acting as negotiators in adverse situations. Characteristics of collaborative negotiations are identified as being rational, goal-oriented, reactive, cooperative, and adaptive. Four negotiable situations were investigated: change orders, errors in drawings and specifications, differing site conditions, and delayed progress payments. The research for this study used a questionnaire survey of 83 project managers from 51 CM consultants and 32 contractor companies focused on building construction in Thailand. The results show significant differences in collaborative behavior between CM consultants and contractors. Contractors were much more aware of the outcome of negotiations, which could lead them to be less collaborative. Both parties strongly regarded rationality as normal practice. Adaptability to new approaches proved difficult in negotiations. This study also proposes strategies and tactics for better collaboration to achieve win-win results in negotiations.  相似文献   

18.
With China’s entry into the World Trade Organization (WTO), the Chinese construction market will be increasingly open and finally become part of the international market. Because of different social and economic systems, as well as different historical and cultural backgrounds, contractors are likely to encounter different risks in different markets. Based on questionnaires and case studies, this paper adopts an importance evaluation index and makes an importance evaluation of various risks encountered by Chinese contractors when contracting for projects in Chinese markets. This paper also makes comparisons between and analyses of the research findings and related available investigation results. The Cox–Stuart trend increase test method is applied in the current research, the results indicating that the variance corresponding to the importance index value tends to increase as the risk event importance decreases. This tendency shows that those investigated tend towards unanimity in terms of higher importance risk events. This paper also examines the reliability of the questionnaires by means of Cronbach’s Alpha Coefficient. The research shows that the main risk currently encountered by Chinese contractors in domestic markets includes owner’s irregular behavior and government departments’ interference in construction markets. China’s accession to the WTO has provided greater opportunities for international contractors to enter the Chinese construction market. Therefore the research results described in this paper can provide valuable data enabling international contractors to gain a better understanding of the potential risks in the environment of the Chinese construction market.  相似文献   

19.
Globalized competition and customer needs forced construction companies to measure their performance beyond the financial measures such as profitability, turnover, etc. As qualitative determinants were added to measurement systems, their investigation and evaluation became a major area of research. In this study, the impact of “resources and capabilities,” “strategic decisions,” “project management competencies,” and “strength of relationships with other parties” on “company performance” was investigated. A questionnaire survey was administered to 73 Turkish contractors and the results of the survey were analyzed using structural equation modeling. The findings indicate that, as expected, resources and capabilities and strategic decisions have an important and direct impact on company performance, whereas project management competencies and strength of relationships with other parties impact company performance only indirectly, through their impact on companies’ resources and capabilities and strategic decisions.  相似文献   

20.
There have been many studies on different aspects of the construction process in regard to how they each impact construction productivity. In reviewing the documentation of this research, very few articles were located that dealt with heavy/highway construction in general, and even fewer were found that dealt with bridges in particular. In addition, very little was found in the literature dealing with the effect that the quality of workforce management has on construction productivity. This paper describes the results of four case studies of highway bridge construction performed by established contractors with little bridge building experience, in which workforce management had a significant negative effect on labor productivity. The contractors’ lack of experience in bridge construction seemed to be the cause of several problems that plagued each of the four projects. The baseline productivity of each project was calculated, and the loss of labor efficiency was estimated to be 80, 75, 32, and 70%, respectively. The schedule slippage on the four case study projects was estimated to be between 127 and 329%.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号