A. I. Savich V. K. Razumov G. R. Khositashvili A. M. Pershutkina T. L. Tetradze 《Power Technology and Engineering (formerly Hydrotechnical Construction)》1990,24(2):122-130
Conclusions Additional detailed investigations of the foundation of the Khudoni arch dam performed at the detail design stage made it possible to refine the engineering-geological structure of the rock mass in the foundation of the structure, to evaluate its stress state, and to determine the variability of the physical and mechanical properties of the rock under the effect of natural and technogenic factors. These investigations showed that the structure of the investigated mass is characterized by a greater complexity than was assumed at the contract design stage, and the relatively high characteristics of the physical and mechanical properties of the rock in the interior parts of the mass in many respects are due to the effect of natural (tectonic and gravitational) stresses. With considerations of the results presented, it is necessary to maximally preserve the natural state of the interior parts of the mass when correcting the working drawings and selecting the technology of construction works.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 2, pp. 44–49, February, 1990. 相似文献
2.
T. A. Bokhua G. A. Lomidze 《Power Technology and Engineering (formerly Hydrotechnical Construction)》1988,22(12):715-718
Conclusion The results obtained on estimating the reliability of the Khudoni arch dam on the basis of the strength condition under an unusual load combination indicates on the whole the ability of the structure to withstand strong earthquakes (intensity 7 and 8) without noticeable trouble-free operation of the structure.A decrease of the values of the reliability function at certain points of the dam (at levelsy=550 m andy=680 m of the downstream face and at levely=660 m of the upstream face) indicate the need to take local structural measures (for example, local reinforcement) to increase the strength of the sections and eliminate dangerous zones in the body of the dam.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 12, pp. 49–52, December, 1988. 相似文献
3.
4.
5.
高拱坝工程技术是“九五”国家科技攻关重点项目,其中高拱坝关键技术的研究成果已在小湾电站高拱坝,溪络渡电站高拱坝,三峡工程等项目中得到推广和应用。本文以锦潭水电站高拱坝为依托,介绍高拱坝技术的实践和运用,为今后同类工程的勘察设计和施工提供参考。 相似文献
6.
7.
锦潭水电站是广东省有史以来建设的第一高拱坝,工程地处华南地台内部,粤北山字型构造前弧,施工技术含量较高。本文通过对锦潭水电站施工技术的阐述,介绍施工中的先进技术和工艺,为今后同类工程的设计施工提供参考。 相似文献
8.
随着技术进步与创新,RCC筑坝技术逐渐成熟,其在保证工程安全运行、加快工程进度、明显提高工程效益等方面具有优越性,也得到越来越广泛的运用。招徕河水电工程枢纽结合实际情况,也将RCC筑坝技术应用于修建拱坝的实践,不仅缩短了工程工期、降低了工程造价,而且为中国中原地区修筑RCC坝率先做出了成功范例。 相似文献
9.
10.
11.
介绍了洞坪电站拱坝工程泄洪孔牛腿采用翻转模、接缝灌浆采用球面键槽灌浆系统,将坝后桥改为二期施工,为多卡模施工创造条件等快速施工方法,从而取消了大坝临时导流底孔,加快了施工进度,取得了良好的经济效益和社会效益。 相似文献
12.
石门双曲拱坝长期运行中发生的两个问题 总被引:1,自引:0,他引:1
论述了石门拱坝28年长期运行中实际发生的两个重大问题,即第一石坝肩渗漏异常反映问题,由高压隧洞钢筋混凝土衬砌阻水失效引起;第二为坝踵开裂问题。两个问题经过全面处理、深入分析研究监测资料,石门大坝的安全运行大体上有保障。 相似文献
13.
紧水滩工程是我国首批建成的百米以上双曲薄拱坝,对坝岩岩体要求较高。分析中采用了三维有限元和刚体平衡法以及坚岩包络线法等。坝肩岩体断裂发育,研究中采用了滑型的组合分析与相应的稳定计算,对坝肩稳定进行了不确定因素的敏感性分析。坝肩岩体处理中确定以保护与强为主的原则,施工简单可靠,效果较明显。 相似文献
14.
15.
将某国外混凝土拱坝接缝灌浆与国内外接缝灌浆技术进行了对比分析,并据此提出了自己的观点与意见,供以后承担国外类似工程施工时参考。 相似文献
16.
文中通过对广西威后水电站高拱坝主要工程地质条件分析和初步研究,针对影响工程实施的几个关键工程地质问题,如地基出露砂泥岩组合、坝肩岩体结构、岩体试验参数选取、地质结构面与拱端推力相互作用、拱座稳定等,提出了合理的建议参数和解决办法,从而使工程得以顺利进行. 相似文献
17.
文章分析了玛坝整个破坏周边的破坏类型、对降落拱坝工作机制的形成作了论述,结合过去所论并在本文分析基础上,对玛坝破坏可能机制的主要路径进一步作了归结。在长期的累进破坏中,变形稳定、渗透稳定和抗滑稳定三者均失稳。 相似文献
18.
19.