首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
In the framework of the JT-60SA project, part of the Broader Approach (BA) agreement, EURATOM provides to Japan, the Toroidal Field (TF) magnet system, consisting of 18 superconducting coils. The procurement of the conductor for the TF coils is managed by Fusion for Energy, acting as EU representative in the BA agreement. The TF conductor procurement is split into two contracts, one dedicated to the production of Niobium Titanium (NbTi) and Cu strand and the other to TF conductor production through strand cabling and cable jacketing operations.The TF conductor is a rectangular-shaped cable-in-conduit conductor formed by 486 (0.81 mm diameter) strands (2/3 NbTi–1/3 Cu) wrapped in a stainless steel foil and embedded into a stainless steel jacket.The 18 TF coils require (including spares) 115 ‘Unit Lengths’ (UL) of such conductor, each 240 m long for a total of about 28 km. Correspondingly about 10,000 km for NbTi and 5000 km for Cu strand are produced.The Japanese company Furukawa Electric Co. (FEC) is in charge of TF strand manufacture while the Italian company Italian Consortium for Applied Superconductivity (ICAS) is in charge of cabling and jacketing of TF conductor ULs. In the paper, we provide information on the production stages presently achieved in TF strand and conductor contracts.  相似文献   

2.
Strands relevant for fusion with high critical current densities and moderate hysteresis losses were developed and already produced on industrial scale. Based on these achievements EFDA-CSU Garching has launched a Nb3Sn strand development and procurement action inside Europe in order to assess the current status of the Nb3Sn strand production capability. All six addressed companies have replied positively to the strand R&D programme which includes the three major Nb3Sn production techniques namely the bronze, internal-tin and powder-in-tube (PIT) route. According to the strand requirements for the ITER TF conductor a critical current density of 800 A/mm2 (at 12 T, 4.2 K and 10 μV/m) and overall strand hysteresis losses below 500 kJ/m3 have been specified as the minimum guaranteed strand performance.The second major objective of this programme is to motivate the strand manufacturers to develop and design high performance Nb3Sn strands optimised for the ITER conductor. For this purpose, a target critical current density of 1100 A/mm2 has been added to the specification. This paper describes the strategy behind the strand development programme, the actual status of the strand production as well as first preliminary results obtained from the strand suppliers.  相似文献   

3.
《Fusion Engineering and Design》2014,89(9-10):2128-2135
The JT-60SA experiment is one of the three projects to be undertaken in Japan as part of the Broader Approach Agreement, conducted jointly by Europe and Japan, and complementing the construction of ITER in Europe. The JT-60SA device is a fully superconducting tokamak capable of confining break-even equivalent deuterium plasmas with equilibria covering high plasma shaping with a low aspect ratio at a maximum plasma current of Ip = 5.5 MA. This makes JT-60SA capable to support and complement ITER in all the major areas of fusion plasma development necessary to decide DEMO reactor construction. After a complex start-up phase due to the necessity to carry out a re-baselining effort with the purpose to fit in the original budget while aiming to retain the machine mission, performance, and experimental flexibility, in 2009 detailed design could start. With the majority of time-critical industrial contracts in place, in 2012, it was possible to establish a credible time plan, and now, the project is progressing on schedule towards the first plasma in March 2019. After careful and focused R&D and qualification tests, the procurement of the major components and plant is now well advanced in manufacturing design and/or fabrication. In the meantime the disassembly of the JT-60U machine has been completed and the engineering of the JT-60SA assembly process has been developed. The actual assembly of JT-60SA started in January 2013 with the installation of the cryostat base. The paper gives an overview of the present status of the engineering design, manufacturing and assembly of the JT-60SA machine.  相似文献   

4.
The modifying of the JT-60U magnet system to the superconducting coils is progressing as a satellite facility for ITER by both parties of Japanese government and European commission in the Broader Approach agreement. The magnet system requires current supplies of 25.7 kA for 18 TF coils and of 20 kA for 4 CS modules and 6 EF coils. The magnet system generates an average heat load of 3.2 kW at 4 K to the cryogenic system. The feeder components connected to the power supply provide current supply. The cooling pipes connected to the cryogenic system provide coolant supply. The instrumentation of the JT-60SA magnet system is used for its operation.  相似文献   

5.
In the framework of the JT-60SA project, France and Italy will provide to JAEA 18 Toroidal Field (TF) coils including NbTi cable-in-conduit conductors. During the tokamak operation, these coils could experience a quench, an incidental event corresponding to the irreversible transition from superconducting state to normal resistive state. Starting from a localized disturbance, the normal zone propagates along the conductor and dissipates a large energy due to Joule heating, which can cause irreversible damages.The detection has to be fast enough (a few seconds) to trigger the current discharge, so as to dump the stored magnetic energy into an external resistor. The JT-60SA primary quench detection system will be based on voltage measurements, which are the most rapid technology. The features of the detection system must be adjusted so as to detect the most probable quenches, while avoiding inopportune fast safety discharges. This requires a reliable simulation of the early quench propagation, performed in this study with the Gandalf code.The conductor temperature reached during the current discharge must be kept under a maximal value, according to the hot spot criterion. In the present study, a hot spot criterion temperature of 150 K was taken into account and the role of each conductor component (strands, helium and conduit) was analyzed. The detection parameters were then investigated for different hypotheses regarding the quench initiation.  相似文献   

6.
ITER, when constructed, will be the equipment using the largest amount of superconductor strands ever built (Nb3Sn and NbTi). ALSTOM-MSA Magnets and Superconductors SA, “ALSTOM-MSA” received in 1998 the largest orders to date for the delivery of superconductor strands and cables (3100 km of cables for dipole and quadrupole magnets and various strands) for the Large Hadron Collider (LHC) being built at CERN, Geneva. These orders to ALSTOM-MSA correspond to more than 600 metric tonnes of superconducting strands, amount to be compared to around 600 metric tonnes of Nb3Sn strands and 250 metric tonnes of NbTi strands necessary for ITER. Starting from small and short R&D programs in the early 1990s, ALSTOM-MSA has reached its industrial targets and has, as of August 2004, delivered around 70% of the whole orders with products meeting high quality standards. Production is going on at contractual delivery rate and with satisfactory financial results to finish deliveries around end 2005, taking into account additional orders from CERN received mid-2004. We will explain how we succeed to transform a “cottage industry” (40 people in 1997) to a “world class” production activity (170 people in 2004). Main industrial problems now solved such as investments and industrial set up and ramp up to reach plateau production as well as more technical problems closely linked to industrial ones such as multifilament wire breaks, strand magnetization, coating process (0.15 μm controlled) and others, will be addressed and the various methods used to solve such problems will be reviewed.  相似文献   

7.
Neutral beam (NB) injectors for JT-60 Super Advanced (JT-60SA) have been designed and developed. Twelve positive-ion-based and one negative-ion-based NB injectors are allocated to inject 30 MW D0 beams in total for 100 s. Each of the positive-ion-based NB injector is designed to inject 1.7 MW for 100 s at 85 keV. A part of the power supplies and magnetic shield utilized on JT-60U are upgraded and reused on JT-60SA. To realize the negative-ion-based NB injector for JT-60SA where the injection of 500 keV, 10 MW D0 beams for 100 s is required, R&Ds of the negative ion source have been carried out. High-energy negative ion beams of 490–500 keV have been successfully produced at a beam current of 1–2.8 A through 20% of the total ion extraction area, by improving voltage holding capability of the ion source. This is the first demonstration of a high-current negative ion acceleration of >1 A to 500 keV. The design of the power supplies and the beamline is also in progress. The procurement of the acceleration power supply starts in 2010.  相似文献   

8.
The JT-60SA experiment is one of the three projects to be undertaken in Japan as part of the Broader Approach Agreement, conducted jointly by Europe and Japan, and complementing the construction of ITER in Europe. It is a fully superconducting tokamak capable of confining break-even equivalent deuterium plasmas with equilibria covering high plasma shaping with a low aspect ratio at a maximum plasma current of Ip = 5.5 MA. In late 2007 the BA Parties, prompted by cost concerns, asked the JT-60SA Team to carry out a re-baselining effort with the purpose to fit in the original budget while aiming to retain the machine mission, performance, and experimental flexibility. Subsequently the Integrated Project Team has undertaken a machine re-optimization followed by engineering design activities aimed to reduce costs while maintaining the machine radius and plasma current. This effort led the Parties to the approval of the new design in late 2008 and hence final design and procurement activities have commenced. The paper will describe the process leading to the re-baselining, the resulting final design and technical solutions and the present status of procurement activities.  相似文献   

9.
JT-60SA is a superconducting tokamak machine to be assembled in Naka site, Japan, designed to contribute to the early realization of fusion energy by supporting the exploitation of ITER and research toward DEMO.In the frame of the Broader Approach Agreement a contract between ENEA and Walter Tosto (Chieti, Italy) started on July 2012 for the construction of 18 TF coil casings for JT-60SA. Two different sets of 9 casings each will be progressively delivered, from 2013 to the end of 2015, to ASG Superconductors (Genoa, Italy) and to Alstom (Belfort, France), where the integration of the winding pack into the casing will be carried out.Each TF coil casing (height 7.5 m and width 4.5 m) consists of four main components: one “Straight Leg Outboard” and one “Curved Leg Outboard” both with their own covers, “Straight Leg Inboard” and “Curved Leg Inboard”. The casing components are segmented in forgings and plates made of FM316LNL. The straight leg outboard is composed of two wings welded to a central core and two elbows welded at the ends with a cooling channel installed inside. Elbows of straight leg outboard are segmented in two half-elbows machined from 1 rough forging and welded to the central core made by plate. Welding of wings to the central core is performed in EBW (electron beam welding) and the straight part is welded to the elbows by NGTIG (TIG narrow gap) process. The curved leg outboard is composed of two wings welded to a central core for a final shape of “D”. Other supports are welded by TIG or Electrode process.This paper describes the technical design solutions, the manufacturing methods defined and the particular processes adopted, such as welding (EB, TIG), non-destructive examinations (NDE), vibration stress relief (VSR) and laser tracker survey, most of which have been validated by the construction of two different sets of full scale mock-ups representing the straight and the curved legs.  相似文献   

10.
In the framework of the Broader Approach Activities, the EU will deliver to Japan the 18 superconducting coils, which constitute the JT-60SA Toroidal field magnet. These 18 coils, manufactured by France and Italy, will be cold tested before shipping to Japan. For this purpose, the European Joint Undertaking for ITER, the Development of Fusion Energy (“Fusion for Energy”, F4E) and the European Voluntary Contributors are collaborating to design and set-up a coil test facility (CTF) and to perform the acceptance test of the 18 JT-60SA Toroidal Field (TF) coils. The test facility is designed to test one coil at a time at nominal current and cryogenic temperature. The test of the first coil of each manufacturer includes a quench triggered by increasing the temperature.The project is presently in the detailed design phase.  相似文献   

11.
The losses of high-energy particles from the plasma depend on the toroidal field (TF) ripple in Tokomak machine. TBM (test blanket module), using RAFM (reduced activation ferritic/martensitic) steels as structure material, impacts on TF ripple in International Thermonuclear Experimental Reactor (ITER). The aim in this paper was to investigate the impact of TBM on TF ripple in ITER. It was analyzed based on ANSYS code and the Chinese DFLL (Dual Function Lithium Lead)-TBM as instances of analysis. The results indicated the TF ripple was still beyond the acceptable level of ITER (δTF < 0.3%) while considering several kinds of configurations (different masses, different dimensions, and different distances to plasma) of the DFLL-TBM. The correction coil might be one way to further reduce the effect on ripple of TF, and the ferromagnetic inserts under TF coil need to continue optimized.  相似文献   

12.
The Fusion Advanced Studies Torus (FAST) conceptual study has been proposed [A. Pizzuto on behalf of the Italian Association, The Fusion Advanced Studies Torus (FAST): a proposal for an ITER Satellite facility in support of the development of fusion energy, in: Proceedings of 22nd IAEA Fusion Energy Conference, Geneva, Switzerland, October 13–18, 2008; Nucl. Fusion, submitted for publication] as possible European ITER Satellite facility with the aim of preparing ITER operation scenarios and helping DEMO design and R&D. Insights into ITER regimes of operation in deuterium plasmas can be obtained from investigations of non linear dynamics that are relevant for the understanding of alpha particle behaviours in burning plasmas by using fast ions accelerated by heating and current drive systems.FAST equilibrium configurations have been designed in order to reproduce those of ITER with scaled plasma current, but still suitable to fulfil plasma conditions for studying burning plasma physics issues in an integrated framework. In this paper we report the plasma scenarios that can be studied on FAST, with emphasis on the aspect of its flexibility in terms of both performance and physics that can be investigated. All plasma equilibria satisfy the following constraints: (a) minimum distance of 3 energy e-folding length (assumed to be 1 cm on the equatorial plane) between plasma and first wall to avoid interaction between plasma and main chamber; (b) maximum current density in the poloidal field coils, transiently, up to around 30 MA/m2. The discharge duration is always limited by the heating of the toroidal field coils that are inertially cooled by helium gas at 30 K. The location of the poloidal field coils has been optimized in order to: minimize the magnetic energy; produce enough magnetic flux (up to 35 Wb stored) for the formation and sustainment of each scenario; produce a good field null at the plasma break-down (BP/BT < 2 × 10−4 at low field, i.e. BT = 4 T and ET = 2 V/m for at least 40 ms).Plasma position and shape control studies will also be presented. The optimization of the passive shell position slows the vertical stability growth time down to 100 ms.  相似文献   

13.
In the ITER tokamak, the toroidal magnetic field (TF) ripple is estimated with TF coils only, with the installation of ferromagnetic inserts (FIs), and with test blanket modules (TBMs) by using a 2-D code for easy and fast calculation. We assessed the effects of the thickness of the FIs on the TF ripple in order to optimize the FI. And we analyzed how the TBMs distort the TF, and calculated the TF ripple for various amounts of a ferromagnetic material and the positions of the TBMs. Even in the case of moving the TBMs outward up to 60-cm, and reducing the ferromagnetic material to 52%, the TF ripple is not decreased below 0.38%. So we had to adopt ripple correction coils. With a 52% reduced amount of the ferromagnetic material in a TBM, we could reduce the TF ripple to 0.28% at a coil current of 100 kA turn per each coil. And with an outward recess of the TBM up to 60 cm, we could reduce the TF ripple to 0.23% at a coil current of 250 kA turn per each coil. As a combined approach, if we reduce the amount of a ferromagnetic material in a TBM to 30%, and recess the TBM to 15 cm, we can efficiently obtain the TF ripple of 0.25% at a coil current of 150 kA turn per each coil.  相似文献   

14.
The JT-60SA cryostat is a stainless steel vacuum vessel (14 m diameter, 16 m height) which encloses the Tokamak providing the vacuum environment (10?3 Pa) necessary to limit the transmission of thermal loads to the components at cryogenic temperature. It must withstand both external atmospheric pressure during normal operation and internal overpressure in case of an accident.The paper summarizes the structural analyses performed in order to validate the JT-60SA cryostat vessel body design. It comprises several analyses: a buckling analysis to demonstrate stability under the external pressure; an elastic and an elastic–plastic stress analysis according to ASME VIII rules, to evaluate resistance to plastic collapse including localized stress concentrations; and, finally, a detailed analysis with bolted fasteners in order to evaluate the behavior of the flanges, assuring the integrity of the vacuum sealing welds of the cryostat vessel body.  相似文献   

15.
Present status of the JT-60SA (JT-60 Super Advanced) project, implemented jointly by Europe and Japan since 2007, is described. The design of the main tokamak components was completed in late 2008, and all the scientific missions are preserved to contribute to ITER and DEMO reactors. The construction of the JT-60SA has begun with procurement activities for the superconducting magnet systems, vacuum vessel, in-vessel components and other components under the relevant procurement arrangements between the implementing agencies of JAEA (Japan Atomic Energy Agency) in Japan and Fusion for Energy in Europe. Designs and developments of the auxiliary heating systems for JT-60SA have been progressing at JAEA so as to provide the total injection power of 41 MW for 100 s.  相似文献   

16.
Plan of ITER remote experimentation center (REC) based on the broader approach (BA) activity of the joint program of Japan and Europe (EU) is described. Objectives of REC activity are (1) to identify the functions and solve the technical issues for the construction of the REC for ITER at Rokkasho, (2) to develop the remote experiment system and verify the functions required for the remote experiment by using the Satellite Tokamak (JT-60SA) facilities in order to make the future experiments of ITER and JT-60SA effectively and efficiently implemented, and (3) to test the functions of REC and demonstrate the total system by using JT-60SA and existing other facilities in EU. Preliminary identified items to be developed are (1) Functions of the remote experiment system, such as setting of experiment parameters, shot scheduling, real time data streaming, communication by video-conference between the remote-site and on-site, (2) Effective data transfer system that is capable of fast transfer of the huge amount of data between on-site and off-site and the network connecting the REC system, (3) Storage system that can store/access the huge amount of data, including database management, (4) Data analysis software for the data viewing of the diagnostic data on the storage system, (5) Numerical simulation for preparation and estimation of the shot performance and the analysis of the plasma shot. Detailed specifications of the above items will be discussed and the system will be made in these four years in collaboration with tokamak facilities of JT-60SA and EU tokamak, experts of informatics, activities of plasma simulation and ITER. Finally, the function of REC will be tested and the total system will be demonstrated by the middle of 2017.  相似文献   

17.
The ITER feeders are the components that connect the ITER magnet systems located inside the main cryostat to the cryogenics, power-supply and control system interfaces outside the cryostat. The feeder busbars rely on the Cable-In-Conduit Conductor (CICC) design concept as all the conductors for the ITER magnet systems. There are two types of busbars for the feeder systems. One is the Main Busbar (MB) for the TF, CS and PF feeders, and the other is the Corrector Busbar (CB) for the CC feeders. The busbar cable is wound from multiple stage sub-cables made with Cu and superconducting strands. The superconducting material is NbTi for the busbar strands of all feeder systems. All Feeder conductors are provided by China. The R&D programs are needed to acquire knowledge on the behavior of such conductors.Since the conductors are new, some full size copper dummy conductors have been produced for the testing of the cabling parameters, definition of automatic TIG welding of seamless jacket section, elaboration of cable insertion and compaction. Then, two short qualification conductor samples (MB and CB) are prepared in ASIPP, and NbTi advanced strands are produced by Western Superconductor Technology (WST).The details of manufacturing procedures for Feeder conductor samples will be described in this paper.  相似文献   

18.
The performance evaluation and analysis of PF5 conductor of the ITER Project in China have been performed using the Gandalf code (Bottura [1]). This study focuses on the Tcs and MQE of PF5 conductor with Cu–non Cu ratio of 2.3 NbTi strands from WST. The PF5 conductor samples have been measured in SULTAN at CRPP for evaluating the performance successfully. The measurement results are also presented with the evaluation results in the paper. The evaluation results related to Tcs and MQE are agreed well with the measurement results. The simulation with Gandalf code can predict the performance of PF5 conductor effectively and provide the helpful method for ITER conductor design and analysis.  相似文献   

19.
《Fusion Engineering and Design》2014,89(9-10):2018-2023
Disassembly of the JT-60U torus was started in 2009 after 18 years of D2 operations and was completed in October 2012 for assembling the JT-60SA torus at the same position. The JT-60U torus was featured by the complicated and welded structure against the strong electromagnetic force, and by the radioactivation due to deuterium–deuterium (D–D) reactions. Since this work is the first experience of disassembling a large radioactivated fusion device in Japan, careful preparations of disassembly activities, including treatment of the radioactivated materials and safety work, have been made. During the disassembly period over 3 years, careful measures against exposure were taken and stringent control of exposure dose were implemented, and as a result, accumulated collective effective dose of ∼41,000 person-day to workers was only ∼22 mSv in total and no internal exposure was observed. About 13,000 components cut into pieces with measuring the contact dose were removed from the torus hall and stored safely in storage facilities. The total weight of the disassembly components reached up to ∼5400 tonnes. Most of the disassembly components will be treated as non-radioactive ones after the clearance level inspection under the Japanese regulations in the future. The assembly of JT-60SA has started in January 2013 after this disassembly of JT-60U torus.  相似文献   

20.
JT-60SA is a superconducting tokamak to be assembled and operated at the JAEA laboratories in Naka (Japan). The tokamak is designed, manufactured and operated under the funding of the Broader Approach Agreement (between the government of Japan and the European Commission) and of the Japan Fusion National Programme; JT-60SA aims to prepare, support and complement the ITER experimental programme. The European contribution to the JT-60SA is, for a large fraction, procured by France, Germany, Italy, Spain and Belgium.This paper summarizes the activities carried out at F4E to develop a user-friendly software tool able to assess in real-time if an operational scenario could be structurally withstood by the magnet system of JT-60SA. Such tool is based on a theoretical formulation which is supported by a series of dedicated finite element method (FEM) calculations, and is able to provide a comparative assessment of any candidate scenario with respect to the baseline scenarios, and a quantitative assessment of all electro magnetic (EM) forces acting on the magnet system at any time during the candidate scenario. The tool as it is presented is specifically designed to be used for the JT-60SA tokamak, though it is designed so to that its usage could be extended easily to any other tokamak.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号