1.
《Fusion Engineering and Design》2014,89(9-10):2128-2135
The JT-60SA experiment is one of the three projects to be undertaken in Japan as part of the Broader Approach Agreement, conducted jointly by Europe and Japan, and complementing the construction of ITER in Europe. The JT-60SA device is a fully superconducting tokamak capable of confining break-even equivalent deuterium plasmas with equilibria covering high plasma shaping with a low aspect ratio at a maximum plasma current of Ip = 5.5 MA. This makes JT-60SA capable to support and complement ITER in all the major areas of fusion plasma development necessary to decide DEMO reactor construction. After a complex start-up phase due to the necessity to carry out a re-baselining effort with the purpose to fit in the original budget while aiming to retain the machine mission, performance, and experimental flexibility, in 2009 detailed design could start. With the majority of time-critical industrial contracts in place, in 2012, it was possible to establish a credible time plan, and now, the project is progressing on schedule towards the first plasma in March 2019. After careful and focused R&D and qualification tests, the procurement of the major components and plant is now well advanced in manufacturing design and/or fabrication. In the meantime the disassembly of the JT-60U machine has been completed and the engineering of the JT-60SA assembly process has been developed. The actual assembly of JT-60SA started in January 2013 with the installation of the cryostat base. The paper gives an overview of the present status of the engineering design, manufacturing and assembly of the JT-60SA machine.  相似文献   

2.
Neutral beam (NB) injectors for JT-60 Super Advanced (JT-60SA) have been designed and developed. Twelve positive-ion-based and one negative-ion-based NB injectors are allocated to inject 30 MW D0 beams in total for 100 s. Each of the positive-ion-based NB injector is designed to inject 1.7 MW for 100 s at 85 keV. A part of the power supplies and magnetic shield utilized on JT-60U are upgraded and reused on JT-60SA. To realize the negative-ion-based NB injector for JT-60SA where the injection of 500 keV, 10 MW D0 beams for 100 s is required, R&Ds of the negative ion source have been carried out. High-energy negative ion beams of 490–500 keV have been successfully produced at a beam current of 1–2.8 A through 20% of the total ion extraction area, by improving voltage holding capability of the ion source. This is the first demonstration of a high-current negative ion acceleration of >1 A to 500 keV. The design of the power supplies and the beamline is also in progress. The procurement of the acceleration power supply starts in 2010.  相似文献   

3.
The JT-60SA cryostat is a stainless steel vacuum vessel (14 m diameter, 16 m height) which encloses the Tokamak providing the vacuum environment (10?3 Pa) necessary to limit the transmission of thermal loads to the components at cryogenic temperature. It must withstand both external atmospheric pressure during normal operation and internal overpressure in case of an accident.The paper summarizes the structural analyses performed in order to validate the JT-60SA cryostat vessel body design. It comprises several analyses: a buckling analysis to demonstrate stability under the external pressure; an elastic and an elastic–plastic stress analysis according to ASME VIII rules, to evaluate resistance to plastic collapse including localized stress concentrations; and, finally, a detailed analysis with bolted fasteners in order to evaluate the behavior of the flanges, assuring the integrity of the vacuum sealing welds of the cryostat vessel body.  相似文献   

4.
The JT-60SA experiment is one of the three projects to be undertaken in Japan as part of the Broader Approach Agreement, conducted jointly by Europe and Japan, and complementing the construction of ITER in Europe. It is a fully superconducting tokamak capable of confining break-even equivalent deuterium plasmas with equilibria covering high plasma shaping with a low aspect ratio at a maximum plasma current of Ip = 5.5 MA. In late 2007 the BA Parties, prompted by cost concerns, asked the JT-60SA Team to carry out a re-baselining effort with the purpose to fit in the original budget while aiming to retain the machine mission, performance, and experimental flexibility. Subsequently the Integrated Project Team has undertaken a machine re-optimization followed by engineering design activities aimed to reduce costs while maintaining the machine radius and plasma current. This effort led the Parties to the approval of the new design in late 2008 and hence final design and procurement activities have commenced. The paper will describe the process leading to the re-baselining, the resulting final design and technical solutions and the present status of procurement activities.  相似文献   

5.
The modifying of the JT-60U magnet system to the superconducting coils is progressing as a satellite facility for ITER by both parties of Japanese government and European commission in the Broader Approach agreement. The magnet system requires current supplies of 25.7 kA for 18 TF coils and of 20 kA for 4 CS modules and 6 EF coils. The magnet system generates an average heat load of 3.2 kW at 4 K to the cryogenic system. The feeder components connected to the power supply provide current supply. The cooling pipes connected to the cryogenic system provide coolant supply. The instrumentation of the JT-60SA magnet system is used for its operation.  相似文献   

6.
《Fusion Engineering and Design》2014,89(9-10):2018-2023
Disassembly of the JT-60U torus was started in 2009 after 18 years of D2 operations and was completed in October 2012 for assembling the JT-60SA torus at the same position. The JT-60U torus was featured by the complicated and welded structure against the strong electromagnetic force, and by the radioactivation due to deuterium–deuterium (D–D) reactions. Since this work is the first experience of disassembling a large radioactivated fusion device in Japan, careful preparations of disassembly activities, including treatment of the radioactivated materials and safety work, have been made. During the disassembly period over 3 years, careful measures against exposure were taken and stringent control of exposure dose were implemented, and as a result, accumulated collective effective dose of ∼41,000 person-day to workers was only ∼22 mSv in total and no internal exposure was observed. About 13,000 components cut into pieces with measuring the contact dose were removed from the torus hall and stored safely in storage facilities. The total weight of the disassembly components reached up to ∼5400 tonnes. Most of the disassembly components will be treated as non-radioactive ones after the clearance level inspection under the Japanese regulations in the future. The assembly of JT-60SA has started in January 2013 after this disassembly of JT-60U torus.  相似文献   

7.
JT-60 is planned to be upgraded to JT-60SA tokamak machine with fully superconducting coils, which is a project of the JA-EU satellite tokamak program under both Broader Approach program and Japanese domestic program. The JT-60SA vacuum vessel (VV) has a D-shape poloidal cross section and a toroidal configuration with 10° facet segmented in toroidal direction. The material of the VV is 316L stainless steel with low cobalt content of <0.05 wt%. A double wall structure is adopted for the VV to ensure high rigidity and high toroidal one-turn resistance simultaneously.Fundamental welding R&D and a trial manufacturing of the 20° upper half of the VV have been performed to study the manufacturing procedure. After the confirmation of the quality of the mock-up, manufacturing of the actual VV started in November 2009.  相似文献   

8.
Design study of a wide-angle infrared (IR) thermography (surface temperature measurement) and visible observation diagnostics for JT-60SA are reported. The new design offers an optical solution without a “blind spot” which is one of the advantages. In order to image a large section inside the vacuum vessel (both in poloidal and toroidal directions), the optical system of endoscope is to provide a wide-angle view in the IR and visible wavelength ranges. The estimated IR optical spatial resolution is approximately 2 cm at a distance of 7.6 m from the front optics with a pupil diameter of 4 mm. For a surface temperature measurement it would be larger (∼4 cm for a surface temperature error less than 5%). The optics of this system can be divided into three parts: (1) a mirror based optical head (two set of spherical mirrors plus two flat mirrors) that produces an intermediate image, (2) a Cassegrain telescope system, and (3) a relay group of lenses, being adapted to the two kinds of detectors for IR and visible observations.  相似文献   

9.
JT-60SA is a superconducting tokamak machine to be assembled in Naka site, Japan, designed to contribute to the early realization of fusion energy by supporting the exploitation of ITER and research toward DEMO.In the frame of the Broader Approach Agreement a contract between ENEA and Walter Tosto (Chieti, Italy) started on July 2012 for the construction of 18 TF coil casings for JT-60SA. Two different sets of 9 casings each will be progressively delivered, from 2013 to the end of 2015, to ASG Superconductors (Genoa, Italy) and to Alstom (Belfort, France), where the integration of the winding pack into the casing will be carried out.Each TF coil casing (height 7.5 m and width 4.5 m) consists of four main components: one “Straight Leg Outboard” and one “Curved Leg Outboard” both with their own covers, “Straight Leg Inboard” and “Curved Leg Inboard”. The casing components are segmented in forgings and plates made of FM316LNL. The straight leg outboard is composed of two wings welded to a central core and two elbows welded at the ends with a cooling channel installed inside. Elbows of straight leg outboard are segmented in two half-elbows machined from 1 rough forging and welded to the central core made by plate. Welding of wings to the central core is performed in EBW (electron beam welding) and the straight part is welded to the elbows by NGTIG (TIG narrow gap) process. The curved leg outboard is composed of two wings welded to a central core for a final shape of “D”. Other supports are welded by TIG or Electrode process.This paper describes the technical design solutions, the manufacturing methods defined and the particular processes adopted, such as welding (EB, TIG), non-destructive examinations (NDE), vibration stress relief (VSR) and laser tracker survey, most of which have been validated by the construction of two different sets of full scale mock-ups representing the straight and the curved legs.  相似文献   

10.
Optical design for divertor Thomson scattering system in JT-60SA has been conducted. The measurement system will use a Nd:YAG laser at 1064 nm, and scattered photons are collected by a collection optical system. The collection optics consists of primary mirror, secondary mirror, relay optics, and fiber collection optics. The laser transmission mirror and collection optics were designed to be installed in a slender lower port of JT-60SA. The assessment of the measurement errors in temperature was conducted for the designed collection optical system. Because of spatial limitation, the solid angle from the measurement points would be small especially for the measurement points in high field side, and consequently, the temperature errors in the high field side would be considerably large. The effects of several improvements on the error are discussed. Moreover, an assessment for the in-vessel laser transmission metallic mirrors is conducted for the present design.  相似文献   

11.
The JT-60SA vacuum vessel (VV) has a D-shaped poloidal cross section and a toroidal configuration with 10° segmented facets. A double wall structure is adopted to ensure high rigidity at operational load and high toroidal one-turn resistance. The material is 316L stainless steel with low cobalt content (<0.05%). The design temperatures of the VV at plasma operation and baking are 50 °C and 200 °C, respectively. In the double wall, boric-acid water is circulated at plasma operation to reduce the nuclear heating of the superconducting magnets. For baking, nitrogen gas is circulated in the double wall after draining of the boric-acid water.The manufacturing of the VV started in November 2009 after a fundamental welding R&D and a trial manufacturing of 20° upper half mock-up. The manufacturing of the first VV 40° sector was completed in May 2011. A basic concept and required jigs of the VV assembly were studied.This paper describes the design and manufacturing of the vacuum vessel. A plan of VV assembly in torus hall is also presented.  相似文献   

12.
In the framework of the JT-60SA project, part of the Broader Approach (BA) agreement, EURATOM provides to Japan, the Toroidal Field (TF) magnet system, consisting of 18 superconducting coils. The procurement of the conductor for the TF coils is managed by Fusion for Energy, acting as EU representative in the BA agreement. The TF conductor procurement is split into two contracts, one dedicated to the production of Niobium Titanium (NbTi) and Cu strand and the other to TF conductor production through strand cabling and cable jacketing operations.The TF conductor is a rectangular-shaped cable-in-conduit conductor formed by 486 (0.81 mm diameter) strands (2/3 NbTi–1/3 Cu) wrapped in a stainless steel foil and embedded into a stainless steel jacket.The 18 TF coils require (including spares) 115 ‘Unit Lengths’ (UL) of such conductor, each 240 m long for a total of about 28 km. Correspondingly about 10,000 km for NbTi and 5000 km for Cu strand are produced.The Japanese company Furukawa Electric Co. (FEC) is in charge of TF strand manufacture while the Italian company Italian Consortium for Applied Superconductivity (ICAS) is in charge of cabling and jacketing of TF conductor ULs. In the paper, we provide information on the production stages presently achieved in TF strand and conductor contracts.  相似文献   

13.
Within the Broader Approach Agreement, Fusion for Energy will deliver to the Japanese Atomic Energy Association, amongst other components, the 18 Toroidal Field Coils (TFCs) for the superconducting Tokamak JT-60SA [1]. These coils will be individually tested at cryogenic temperatures and at the nominal current in a test cryostat. This cryostat is provided as an in-kind contribution by Belgium and is being developed jointly with CEA-Saclay/France.The vessel is large, oval shaped with an overall length of 11 m, a width of 7.2 m and a height of 6.5 m. To reduce the heat load to the coils the cryostat is covered by LN2 cooled thermal shields. In addition to the cryostat, three test frames for the coils, the valve box vessel and the insulation vacuum system are also provided by Belgium. The Belgian contribution is design, manufacturing, assembly and test of the vacuum chamber, thermal shield and test frames by the Belgian company Ateliers de la Meuse (ALM), with the support of Centre Spatial de Liège (CSL). The TF coil test facility is assembled and the coil tests are performed by CEA/Saclay.The Belgian contribution, namely the design, manufacturing, assembly and test of the vacuum vessel, the thermal shields, and the test frames as well as of the vacuum pumping system are described in the presentation.  相似文献   

14.
Recently, fabrication of the first superconducting coil in JT-60SA tokamak (EF4 coil) was finished. EF4 coil has ten double pancake (DP) coils. All DP coils were stacked up to form the winding pack. In order to check the manufacturing error of DP coils, their circularities (in-plane ellipticities) were evaluated for all DP coils. Positions of conductors for each DP coil were measured before curing process. Error bars of the current centers, which were used for the index for DP coil's circularity, ranged between 1.1 and 2.5 mm. During stacking the DP coils, the positions of these coils were optimized in order to cancel the error of circulation of the winding pack. As the result, the manufacturing error of the radial current center was achieved 0.6 mm for the winding pack. This value was an order of magnitude smaller than the required manufacturing error of EF4 coil.  相似文献   

15.
In the framework of the JT-60SA project, France and Italy will provide to JAEA 18 Toroidal Field (TF) coils including NbTi cable-in-conduit conductors. During the tokamak operation, these coils could experience a quench, an incidental event corresponding to the irreversible transition from superconducting state to normal resistive state. Starting from a localized disturbance, the normal zone propagates along the conductor and dissipates a large energy due to Joule heating, which can cause irreversible damages.The detection has to be fast enough (a few seconds) to trigger the current discharge, so as to dump the stored magnetic energy into an external resistor. The JT-60SA primary quench detection system will be based on voltage measurements, which are the most rapid technology. The features of the detection system must be adjusted so as to detect the most probable quenches, while avoiding inopportune fast safety discharges. This requires a reliable simulation of the early quench propagation, performed in this study with the Gandalf code.The conductor temperature reached during the current discharge must be kept under a maximal value, according to the hot spot criterion. In the present study, a hot spot criterion temperature of 150 K was taken into account and the role of each conductor component (strands, helium and conduit) was analyzed. The detection parameters were then investigated for different hypotheses regarding the quench initiation.  相似文献   

16.
《Fusion Engineering and Design》2014,89(9-10):2299-2303
Remote pipe cutting tool accessing from inside pipe has been newly developed for JT-60SA. The tool head equips a disk-shaped cutter blade and four rollers which are subjected to the reaction force. The tool pushes out the cutter blade by decreasing the distance between two cams. The tool cuts a cooling pipe by both pushing out the cutter blade and rotating the tool head itself. The roller holder is not pushed out anymore after touching the inner wall of the pipe. In other words, only cutter blade is pushed out after bringing the tool axis into the pipe axis. Outer diameter of the cutting tool head is 44 mm. The cutting tool is able to push out the cutter blade up to 32.5 mm in radius, i.e. 65 mm in diameter, which is enough to cut the pipe having an outer diameter of 59.8 mm. The thickness and material of the cooling pipe are 2.8 mm and SUS316L, respectively. The length of the cutting tool head is about 1 m. The tool is able to cut a pipe locates about 480 mm in depth from the mounting surface on the divertor cassette. The pipe cutting system equips two cutting heads and they are able to cut two pipes at the same time in order to remove the inner target plate. Reproducibility of the cross-sectional shape of the cut pipe is required for re-welding. The degree of reproducibility is inside 0.1 mm except for burr at outside of the pipe, which is enough to re-weld the cut pipe. Some swarf is generated during cutting the double-layered pipe assuming a plug located on the top of the pipe. The swarf is deposited on the bottom of the plug and collected by pulling out the plug in the actual equipment.  相似文献   

17.
An upgrade of the electron cyclotron heating system on DIII-D to almost 15 MW is being planned which will expand it from a system with six 1 MW 110 GHz gyrotrons to one with ten gyrotrons. A depressed collector 1.2 MW 110 GHz gyrotron is being commissioned as the seventh gyrotron. A new 117.5 GHz 1.5 MW depressed collector gyrotron has been designed, and the first article will be the eighth gyrotron. Two more are planned, increasing the system to ten total gyrotrons, and the existing 1 MW gyrotrons will subsequently be replaced with 1.5 MW gyrotrons.Communications and Power Industries completed the design of the 117.5 GHz gyrotron, and are now fabricating the first article. The design was optimized for a nominal 1.5 MW at a beam voltage of 105 kV, collector potential depression of 30 kV, and beam current of 50 A, but can achieve 1.8 MW at 60 A. The design of the collector permits modulation above 100 Hz by either the body or the cathode power supply, or both, while modulation below 100 Hz must use only the cathode power supply.General Atomics is developing solid-state power supplies for this upgrade: a solid-state modulator for the cathode power supply and a linear high voltage amplifier for the body power supply. The solid-state modulator has series-connected insulated-gate bipolar transistors that are switched at a fixed frequency by a pulse-width modulation regulator to control the output voltage. The design of the linear high voltage amplifier has series-connected transistors to control the output voltage, which was successfully demonstrated in a proof-of-principle test at 2 kV. The designs of complete power supplies are progressing.The design features of the 117.5 GHz 1.5 MW gyrotron and the solid-state cathode and body power supplies will be described and the current status and plans are presented.  相似文献   

18.
The real vacuum vessel (VV) manufacturing of JT-60SA has started since November 2009 at Toshiba. Prior to starting manufacturing, fundamental welding R&Ds had been performed by three stages. In the first stage, primary tests for screening welding method were performed. In the second stage, the trial welding for 1 m-long straight and curved double shell samples were conducted. The dependences of welding quality and distortion on the welding conditions, such as arc voltage and current, setting accuracy, welding sequence, and the shape of grooves were studied. In addition, welding condition with low heat input was explored. In the last stage, fabrication sequence was confirmed and established by the trial manufacturing of the 20° upper half mock-up [1]. This paper presents the R&D results obtained in the first and second stages.  相似文献   

19.
The mission of the JT-60SA Tokamak, to be built in Japan, is to contribute to the early realization of fusion energy by its exploitation in support of the ITER program. JT-60SA project is an important part of the “broader approach” activity as a satellite program for ITER. The toroidal field (TF) coils are a European “in kind” contribution and they will partly be built by France. JT-60SA TF coil uses the Cable In Conduit Conductor (CICC) with NbTi superconductor strands. TF conductors will have to operate at 5.7 T, 5 K and at current density of 450 A/mm2 with sufficient margins. In the framework of JT-60SA TF coil manufacture, the variable temperature characterization is an important step to select NbTi strand. At an early stage of design, we had to choose the strand with acceptable performances. During the design qualification and validation stage, it is important to qualify strands in conditions close to the operation conditions. The industry has proposed various strands manufactured with different processes. This work and publication examines a strand with an internal CuNi barrier, which is expected to lead to better current distribution between strands, by more precise calibration and control of the inter-strand resistance. The strands were tested at the Grenoble High Magnetic Field Laboratory facility. The domain (B, T, J) explored was in the range of 4.5–11 T for the magnetic field intensity, 4.2–6.5 K for the temperature and between 40 A/mm2 and 1200 A/mm2 for the current density. For each strand, “critical current density” and “current sharing temperature” measurements have been carried out, with a temperature precision of few tens of mK. Once the measurements performed, the fitting parameters (of type JC = f(B, T)) of each strand have been found, by performing regression analysis. This work will lead to select the strand with the best characteristics. In this paper, we present the results of this measurement task, the data and regression analysis (fits, Tcs, etc.) and the conclusion about the strand choice.  相似文献   

20.
Laser-induced breakdown spectroscopy (LIBS) is discussed as a possible method to characterize the composition, tritium retention and amount of material deposits on the first wall of fusion devices. The principle of the technique is the ablation of the co-deposited layer by a laser pulse with P (power density)  0.5 GW/cm2 and the spectroscopic analysis of the light emitted by the laser induced plasma. The typical spatial extension of the laser plasma plume is in the order of 1 cm with typical plasma parameters of ne  3 × 1022 m?3 and Te  1–2 eV averaged over the plasma lifetime which is below 1 μs. In this study “ITER-Like” mixed deposits with a thickness of about 2 μm and consisting of a mixture of W/Al/C and D on bulk tungsten substrates have been analyzed by LIBS to measure the composition and hydrogen isotopes content at different laser energies, ranging from about 2 J/cm2 (0.3 GW/cm2) to about 17 J/cm2 (2.4 GW/cm2) for 7 ns laser pulses. It is found that the laser energies above about 7 J/cm2 (1 GW/cm2) are needed to achieve the full removal of the deposit layer and identify a clear interface between the deposit and the bulk tungsten substrate by applying 15–20 laser pulses while hydrogen isotopes decrease strongly after the first laser pulse. Under these conditions, the evolution of the spectral line intensities of W/Al/C/hydrogen can be used to evaluate the layer composition.  相似文献   