首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Design study of a wide-angle infrared (IR) thermography (surface temperature measurement) and visible observation diagnostics for JT-60SA are reported. The new design offers an optical solution without a “blind spot” which is one of the advantages. In order to image a large section inside the vacuum vessel (both in poloidal and toroidal directions), the optical system of endoscope is to provide a wide-angle view in the IR and visible wavelength ranges. The estimated IR optical spatial resolution is approximately 2 cm at a distance of 7.6 m from the front optics with a pupil diameter of 4 mm. For a surface temperature measurement it would be larger (∼4 cm for a surface temperature error less than 5%). The optics of this system can be divided into three parts: (1) a mirror based optical head (two set of spherical mirrors plus two flat mirrors) that produces an intermediate image, (2) a Cassegrain telescope system, and (3) a relay group of lenses, being adapted to the two kinds of detectors for IR and visible observations.  相似文献   

2.
JT-60SA is a superconducting tokamak to be assembled and operated at the JAEA laboratories in Naka (Japan). The tokamak is designed, manufactured and operated under the funding of the Broader Approach Agreement (between the government of Japan and the European Commission) and of the Japan Fusion National Programme; JT-60SA aims to prepare, support and complement the ITER experimental programme. The European contribution to the JT-60SA is, for a large fraction, procured by France, Germany, Italy, Spain and Belgium.This paper summarizes the activities carried out at F4E to develop a user-friendly software tool able to assess in real-time if an operational scenario could be structurally withstood by the magnet system of JT-60SA. Such tool is based on a theoretical formulation which is supported by a series of dedicated finite element method (FEM) calculations, and is able to provide a comparative assessment of any candidate scenario with respect to the baseline scenarios, and a quantitative assessment of all electro magnetic (EM) forces acting on the magnet system at any time during the candidate scenario. The tool as it is presented is specifically designed to be used for the JT-60SA tokamak, though it is designed so to that its usage could be extended easily to any other tokamak.  相似文献   

3.
The assembly scenarios and assembly tools of the major tokamak components for JT-60SA are studied in the following. (1) The assembly frame (with a dedicated 30-tonne crane), which is located around the JT-60SA tokamak, is adopted for effective assembly works in the torus hall and the temporary support of the components during assembly. (2) Metrology for precise positioning of the components is also studied by defining the metrology points on the components. (3) The sector segmentation for weld joints and positioning of the vacuum vessel (VV), the assembly scenario and tools for VV thermal shield (TS), the connection of the outer intercoil structure (OIS) and the installation of the final toroidal field coil (TFC) are studied, as typical examples of the assembly scenarios and tools for JT-60SA.  相似文献   

4.
Structural, mechanical and optical design work on antennas/launchers for the electron cyclotron range of frequency heating and current drive system in JT-60 Super Advanced (JT-60SA) have been advanced based on a linear motion antenna concept. A CAD model of the launcher was built with realistic component sizes. A mock-up of the steering structure consisting of two different bellows sections for poloidal and toroidal beam scanning was fabricated to test movement of the bellows. The poloidal (?40° to +20°) and toroidal (?15° to +15°) injection angle ranges required in JT-60SA were shown to be realized by this steering structure and mirrors.  相似文献   

5.
The JT-60 is planned to be modified to a full-superconducting tokamak referred to as the JT-60 Super Advanced (JT-60SA). The maximum temperature of the magnet during its quench might reach the temperature of higher than several hundreds Kelvin that will damage the superconducting magnet itself. The high precision quench detection system, therefore, is one of the key technologies in the superconducting magnet protection system.The pick-up coil method, which is using voltage taps to detect the normal voltage, is used for the quench detection of the JT-60SA superconducting magnet system. The disk-shaped pick-up coils are inserted in the central solenoid (CS) module to compensate the inductive voltage. In the previous study, the quench detection system requires a large number of pick-up coils. The reliability of quench detection system would be higher by simplifying the detection system such as reducing the number of pick-up coils. Simplifying the quench detection system is also important to reduce the total cost of the protection system. Hence the design method is improved by increasing optimizing parameters. The improved design method can reduce the number of pick-up coils without reducing the sensitivity of detection; consequently the protection system can be designed with higher reliability and lower cost. The applicability of the disk-shaped pick-up coil for quench detection system is evaluated by the two dimensional analysis. In the previous study, however, the analysis model only took into account the CS, EF (equilibrium field) coils and plasma. Therefore, applicability of the disk-shaped pick-up coil for the quench detection system remains open question because the fast plasma events, such as disruption, mini collapse and ELM (edge localized mode), directly influences on the voltage of pick-up coil making the quench signal undetectable. Consequently, a new analysis model proposed in the present paper was designed to avoid this difficulty by introducing the passive coil series such as vacuum vessel and stabilizer. The influence of fast plasma events is absorbed by passive coil series like real system, and the evaluation of applicability can be examined in detail. The analysis results show that the disk-shaped pick-up coil is applicable whenever the standard operation, disruption, mini collapse and ELM.  相似文献   

6.
Present status of the JT-60SA (JT-60 Super Advanced) project, implemented jointly by Europe and Japan since 2007, is described. The design of the main tokamak components was completed in late 2008, and all the scientific missions are preserved to contribute to ITER and DEMO reactors. The construction of the JT-60SA has begun with procurement activities for the superconducting magnet systems, vacuum vessel, in-vessel components and other components under the relevant procurement arrangements between the implementing agencies of JAEA (Japan Atomic Energy Agency) in Japan and Fusion for Energy in Europe. Designs and developments of the auxiliary heating systems for JT-60SA have been progressing at JAEA so as to provide the total injection power of 41 MW for 100 s.  相似文献   

7.
《Fusion Engineering and Design》2014,89(9-10):2128-2135
The JT-60SA experiment is one of the three projects to be undertaken in Japan as part of the Broader Approach Agreement, conducted jointly by Europe and Japan, and complementing the construction of ITER in Europe. The JT-60SA device is a fully superconducting tokamak capable of confining break-even equivalent deuterium plasmas with equilibria covering high plasma shaping with a low aspect ratio at a maximum plasma current of Ip = 5.5 MA. This makes JT-60SA capable to support and complement ITER in all the major areas of fusion plasma development necessary to decide DEMO reactor construction. After a complex start-up phase due to the necessity to carry out a re-baselining effort with the purpose to fit in the original budget while aiming to retain the machine mission, performance, and experimental flexibility, in 2009 detailed design could start. With the majority of time-critical industrial contracts in place, in 2012, it was possible to establish a credible time plan, and now, the project is progressing on schedule towards the first plasma in March 2019. After careful and focused R&D and qualification tests, the procurement of the major components and plant is now well advanced in manufacturing design and/or fabrication. In the meantime the disassembly of the JT-60U machine has been completed and the engineering of the JT-60SA assembly process has been developed. The actual assembly of JT-60SA started in January 2013 with the installation of the cryostat base. The paper gives an overview of the present status of the engineering design, manufacturing and assembly of the JT-60SA machine.  相似文献   

8.
Neutral beam (NB) injectors for JT-60 Super Advanced (JT-60SA) have been designed and developed. Twelve positive-ion-based and one negative-ion-based NB injectors are allocated to inject 30 MW D0 beams in total for 100 s. Each of the positive-ion-based NB injector is designed to inject 1.7 MW for 100 s at 85 keV. A part of the power supplies and magnetic shield utilized on JT-60U are upgraded and reused on JT-60SA. To realize the negative-ion-based NB injector for JT-60SA where the injection of 500 keV, 10 MW D0 beams for 100 s is required, R&Ds of the negative ion source have been carried out. High-energy negative ion beams of 490–500 keV have been successfully produced at a beam current of 1–2.8 A through 20% of the total ion extraction area, by improving voltage holding capability of the ion source. This is the first demonstration of a high-current negative ion acceleration of >1 A to 500 keV. The design of the power supplies and the beamline is also in progress. The procurement of the acceleration power supply starts in 2010.  相似文献   

9.
In the framework of the Broader Approach Activities, the EU will deliver to Japan the 18 superconducting coils, which constitute the JT-60SA Toroidal field magnet. These 18 coils, manufactured by France and Italy, will be cold tested before shipping to Japan. For this purpose, the European Joint Undertaking for ITER, the Development of Fusion Energy (“Fusion for Energy”, F4E) and the European Voluntary Contributors are collaborating to design and set-up a coil test facility (CTF) and to perform the acceptance test of the 18 JT-60SA Toroidal Field (TF) coils. The test facility is designed to test one coil at a time at nominal current and cryogenic temperature. The test of the first coil of each manufacturer includes a quench triggered by increasing the temperature.The project is presently in the detailed design phase.  相似文献   

10.
Plan of ITER remote experimentation center (REC) based on the broader approach (BA) activity of the joint program of Japan and Europe (EU) is described. Objectives of REC activity are (1) to identify the functions and solve the technical issues for the construction of the REC for ITER at Rokkasho, (2) to develop the remote experiment system and verify the functions required for the remote experiment by using the Satellite Tokamak (JT-60SA) facilities in order to make the future experiments of ITER and JT-60SA effectively and efficiently implemented, and (3) to test the functions of REC and demonstrate the total system by using JT-60SA and existing other facilities in EU. Preliminary identified items to be developed are (1) Functions of the remote experiment system, such as setting of experiment parameters, shot scheduling, real time data streaming, communication by video-conference between the remote-site and on-site, (2) Effective data transfer system that is capable of fast transfer of the huge amount of data between on-site and off-site and the network connecting the REC system, (3) Storage system that can store/access the huge amount of data, including database management, (4) Data analysis software for the data viewing of the diagnostic data on the storage system, (5) Numerical simulation for preparation and estimation of the shot performance and the analysis of the plasma shot. Detailed specifications of the above items will be discussed and the system will be made in these four years in collaboration with tokamak facilities of JT-60SA and EU tokamak, experts of informatics, activities of plasma simulation and ITER. Finally, the function of REC will be tested and the total system will be demonstrated by the middle of 2017.  相似文献   

11.
JT-60SA is a fully superconducting coil tokamak upgraded from the JT-60U. This paper focused on the integrity of the top lid of cryostat in JT-60SA. The design requirement for the cryostat in normal operations is to achieve vacuum insulation of 10 3 Pa, and the top flange of the top lid is lightly welded onto its body flange. The weld is tensile-loaded by bending deformation of the top lid due to vacuum pressure of external 0.1 MPa. This weld integrity is evaluated with tensile-load reduction, which results in clamp reinforcement. The structural integrity of the top lid is validated.  相似文献   

12.
The mission of the JT-60SA Tokamak, to be built in Japan, is to contribute to the early realization of fusion energy by its exploitation in support of the ITER program. JT-60SA project is an important part of the “broader approach” activity as a satellite program for ITER. The toroidal field (TF) coils are a European “in kind” contribution and they will partly be built by France. JT-60SA TF coil uses the Cable In Conduit Conductor (CICC) with NbTi superconductor strands. TF conductors will have to operate at 5.7 T, 5 K and at current density of 450 A/mm2 with sufficient margins. In the framework of JT-60SA TF coil manufacture, the variable temperature characterization is an important step to select NbTi strand. At an early stage of design, we had to choose the strand with acceptable performances. During the design qualification and validation stage, it is important to qualify strands in conditions close to the operation conditions. The industry has proposed various strands manufactured with different processes. This work and publication examines a strand with an internal CuNi barrier, which is expected to lead to better current distribution between strands, by more precise calibration and control of the inter-strand resistance. The strands were tested at the Grenoble High Magnetic Field Laboratory facility. The domain (B, T, J) explored was in the range of 4.5–11 T for the magnetic field intensity, 4.2–6.5 K for the temperature and between 40 A/mm2 and 1200 A/mm2 for the current density. For each strand, “critical current density” and “current sharing temperature” measurements have been carried out, with a temperature precision of few tens of mK. Once the measurements performed, the fitting parameters (of type JC = f(B, T)) of each strand have been found, by performing regression analysis. This work will lead to select the strand with the best characteristics. In this paper, we present the results of this measurement task, the data and regression analysis (fits, Tcs, etc.) and the conclusion about the strand choice.  相似文献   

13.
A superconducting coil system is actually complicated by the distributed parameters, e.g. the distributed mutual inductance among turns and the distributed capacitance between adjacent conductors. In this paper, such a complicated system was modeled with a reasonably simplified circuit network with lumped parameters. Then, a detailed circuit analysis was conducted to evaluate the possible voltage transient in the coil circuit. As a result, an appropriate (minimum) snubber capacitance for the Switching Network Unit, which is a fast high voltage generation circuit in JT-60SA, was obtained.  相似文献   

14.
The modifying of the JT-60U magnet system to the superconducting coils is progressing as a satellite facility for ITER by both parties of Japanese government and European commission in the Broader Approach agreement. The magnet system requires current supplies of 25.7 kA for 18 TF coils and of 20 kA for 4 CS modules and 6 EF coils. The magnet system generates an average heat load of 3.2 kW at 4 K to the cryogenic system. The feeder components connected to the power supply provide current supply. The cooling pipes connected to the cryogenic system provide coolant supply. The instrumentation of the JT-60SA magnet system is used for its operation.  相似文献   

15.
16.
Design and manufacturing of the JT-60SA cryostat is being performed by CIEMAT, according to the Broader Approach Agreement between Japan and the European Commission. Taking into account both the limitations of transport and the assembly sequence of JT60-SA, the cryostat is divided in two main parts, namely the cryostat base and the cryostat vessel body.The paper is focused on the structural analyses carried out by CIEMAT to evaluate the mechanical behavior of the JT-60SA cryostat base final design, since the cryostat vessel body will be designed and manufactured in a subsequent stage.The overall structural integrity of the cryostat base has been verified and confirmed utilizing the ‘limit analysis’ procedure defined in ASME code 2007 Section VIII, Div. 2. The study has been complemented by further finite element analyses that include the detail of the bolted fastenings, aimed to evaluate the mechanical behavior of the bolted joints themselves, as well as the stresses and deformations in the overall cryostat base structure.  相似文献   

17.
《Fusion Engineering and Design》2014,89(9-10):2018-2023
Disassembly of the JT-60U torus was started in 2009 after 18 years of D2 operations and was completed in October 2012 for assembling the JT-60SA torus at the same position. The JT-60U torus was featured by the complicated and welded structure against the strong electromagnetic force, and by the radioactivation due to deuterium–deuterium (D–D) reactions. Since this work is the first experience of disassembling a large radioactivated fusion device in Japan, careful preparations of disassembly activities, including treatment of the radioactivated materials and safety work, have been made. During the disassembly period over 3 years, careful measures against exposure were taken and stringent control of exposure dose were implemented, and as a result, accumulated collective effective dose of ∼41,000 person-day to workers was only ∼22 mSv in total and no internal exposure was observed. About 13,000 components cut into pieces with measuring the contact dose were removed from the torus hall and stored safely in storage facilities. The total weight of the disassembly components reached up to ∼5400 tonnes. Most of the disassembly components will be treated as non-radioactive ones after the clearance level inspection under the Japanese regulations in the future. The assembly of JT-60SA has started in January 2013 after this disassembly of JT-60U torus.  相似文献   

18.
To evaluate the joint fabrication technology for the JT-60SA EF coils, joint resistance measurements were conducted using a sample consisting of pancake and terminal joints. Both joints are shake-hands lap joints composed of cable-in-conduit conductors and a pure copper saddle-shaped spacer. The measurements demonstrated that both joints fulfilled the design requirement. Considering these measurements, the characteristics of both joints were investigated using analytical models that represent the joints. The analyses indicated that the characteristics of the conductors used in the joints affect the characteristics of the joints.  相似文献   

19.
JT-60 is planned to be upgraded to JT-60SA tokamak machine with fully superconducting coils, which is a project of the JA-EU satellite tokamak program under both Broader Approach program and Japanese domestic program. The JT-60SA vacuum vessel (VV) has a D-shape poloidal cross section and a toroidal configuration with 10° facet segmented in toroidal direction. The material of the VV is 316L stainless steel with low cobalt content of <0.05 wt%. A double wall structure is adopted for the VV to ensure high rigidity and high toroidal one-turn resistance simultaneously.Fundamental welding R&D and a trial manufacturing of the 20° upper half of the VV have been performed to study the manufacturing procedure. After the confirmation of the quality of the mock-up, manufacturing of the actual VV started in November 2009.  相似文献   

20.
This paper describes an asymmetric control method for the firing angle and a start/stop timing shift control of four thyristor converters called "Booster PS" to minimize the reactive power fluctuation during plasma initiation in JT-60SA. From the simulation using the "PSCAD/EMTDC" code, it is found that these control methods can drastically reduce the reac- tive power induced by the four units of the "Booster PS". In addition, the voltage fluctuation of the motor-generator connected to the "Booster PS" is expected to be suppressed. This can also contribute to achieve stable control of the JT-60SA magnet power supplies.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号