共查询到20条相似文献,搜索用时 15 毫秒
1.
2.
L. A. Nazarov L. A. Nazarova A. M. Freidin Zh. K. Alimseitova 《Journal of Mining Science》2006,42(6):530-539
It is shown for the room-and-pillar mining of ore deposits of alternating thickness that service-life of pillars is much dependent
on the value of horizontal stresses in the intact massif. A method is proposed and an effective algorithm is developed for
determining the rheological parameters of rocks on the basis of the inverse problem solution by the data on covergence of
the roof and floor in mines.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 11–21, November–December, 2006. 相似文献
3.
4.
卫建清 《采矿与安全工程学报》2003,20(1):106-108
通过理论分析并结合房柱式开采的工艺要求 ,确定了房柱式开采煤房和煤柱的相关参数 ,进行了房柱式开采的巷道布置 ,现场实测了煤柱的变形规律和应力分布状况 ,证明了煤柱在房采过程中的稳定性 ,为成功实施房柱式开采奠定了基础。 相似文献
5.
Y型通风无煤柱开采需要沿空留巷,所留巷道要保持到下一个工作面回采使用.对于沿空留巷,煤矿工程技术人员经过了几十年不懈的努力,用各种支护材料对沿空留巷进行了支护实践,也没能够摸索出一套有效的支护技术.现用水泥充填墙配合掘进巷道期间高密度的锚索、锚杆联合支护和留巷前补强支护取得了Y型通风无煤柱开采沿空留巷的成功技术.利用这个技术结合我矿实际情况,我们制定我矿Y型通风无煤柱开采工作面掘进期间巷道支护方案,并成功地实现了Y型通风无煤柱开采.下面是Y型通风无煤柱开采掘进巷道期间高密度的锚索、锚杆联合支护和留巷前补强支护在我矿应用与探讨. 相似文献
6.
7.
D. R. Kaplunov 《Journal of Mining Science》1999,35(3):286-290
A set of problems is considered for planning underground mining of ore deposits. Achievements are noted in domestic mining
science in the field of improving planning methods and design parameters for underground mines. Principles in the development
of planning theory for mining enterprises at the contemporary level are formulated.
Institute of Problems of Complex Development of Bowels, Russian Academy of Sciences, Moscow. Translated from Fiziko-Tekhnicheskie
Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 80–84, May–June, 1999. 相似文献
8.
上覆煤层开采后,在煤层底板形成原岩应力区、弹性应力增高区、塑性区、卸压区、应力恢复区和压实区等6个区域,上覆煤层遗留边界煤柱附近围岩内形成"椭圆应力拱"结构,前拱脚位于应力恢复区,后拱脚位于弹性应力增高区,上覆岩层载荷通过前、后拱脚传入底板,并对下伏煤层巷道产生附加应力,明显影响到下伏煤层巷道稳定性.基于此,构建上覆煤... 相似文献
9.
Taken taifeng coal mine in Mongolia for example, discussed the stability and controllability about advance pillars which locate at the front of working face and makes simulation on pillar with the software UDEC3.1. The failure styles of advance pillars are shear failure and compression failure through analyzing the stability of advance pillars. The paper concludes that can protect advance pillars from shear failure by controlling coefficient of volumetric expansion of mining field rock and supports' working resistance and can also protect it from compression failure by advance supporting, increasing setting pressure and working resistance. Two advance pillars are influenced and the main failure form is compression failure through the numerical simulation. 相似文献
10.
11.
12.
13.
14.
A. E. Sleptsov 《Journal of Mining Science》1988,24(4):368-371
Institute of Mining of the North, Yakut Branch, Academy of Sciences of the USSR, Yakutsk. Translated from Fiziko-Tekhnicheskie
Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 93–96, July–August, 1988. 相似文献
15.
房柱法是缓倾斜薄矿体开采的主要方法之一,而房柱法矿柱回采是国内外均面临的重大技术难题。以南温河钨矿为工程背景,先采用理论计算人工假柱尺寸,然后就矿柱回采工艺及预期经济效益预算进行了研究。研究表明:1)人工假柱跨度平均为11m,尺寸不小于4.35m,人工假柱养护龄期不得少于20d;2)试验采场内预计回收矿柱矿石量3 895.417t,矿柱直接经济价值为495.37万元,利润311.92万元。通过试验阶段矿柱回采,能够为南温河钨矿今后矿柱回采大范围推广奠定坚实的基础,也为今后类似矿山矿柱回采提供了宝贵的借鉴意义。 相似文献
16.
17.
18.