以新疆天池能源南露天矿南端帮边坡为对象,研究了其在陡帮开采条件下的边坡稳定性。在综合分析南端帮边坡地质条件的基础上,总结分析了影响南帮稳定性的影响因素,确定了岩土体物理力学参数,采用了刚体极限平衡法,对原设计边坡、陡帮开采条件下边坡及复合边坡稳定性进行了分析评价。结果表明:南端帮下部煤台阶以10 m的参数靠帮,实现局部陡帮开采,边坡的稳定性满足规范要求。 相似文献
2.
露天煤矿边坡是构成采矿场形状的重要要素,合适的边坡角度对维持露天煤矿边坡稳定和经济效益具有重要意义。以哈尔乌素露天煤矿南端帮边坡为例,分别采用数值有限元法和Fellenius、Bishop、Janbu等3种极限平衡法相结合的方法,分析了哈尔乌素南端帮边坡在37°现有的条件下端帮边坡最小稳定系数为1.341,潜在圆弧滑动面贯穿整个坡体,南端帮边坡处于稳定状态且有进一步提高的可能。充分结合目前南端帮平台构成特征并考虑端帮运输系统的情况下,提出4种提高端帮边坡角度方案,并采用有限元法和Janbu极限平衡法对4种可行方案进行对比和稳定性分析。结果表明:边坡角度可以提高至40°,最低稳定系数能达到1.135,可增加原煤产量近43.8万t,增加岩石剥离量18.15万m3,可提高经济效益7 382万元。 相似文献
3.
露天边坡的稳定性是影响煤矿安全生产的重要因素,对其工作帮边坡破坏模式进行分析是有效地控制边坡稳定的前提。综合分析魏家峁露天煤矿工作帮边坡地质条件、边坡现状,并结合数值模拟计算,重点揭示边坡的位移特征、剪应变及塑性区扩展情况,对边坡失稳机理及破坏模式进行了分析,结果表明:力学机理上边坡岩体主要受开挖卸荷—剪切破坏影响,宏观表现上工作帮边坡主要发生蠕滑—拉裂型滑移破坏,边坡呈现出沿软弱层发生底部顺层后缘圆弧状的滑动,上覆粉土、粉砂层为坐落—平推型滑移。基于此,提出了“实时监测+疏干排水+清方剥离”的综合滑坡治理方案,提高了边坡稳定性,保障了矿山安全稳定生产。 相似文献
4.
针对弓长岭露天铁矿北帮边坡出现大范围整体下滑迹象,为避免灾难性事故的发生,利用经典的极限平衡法对现有边坡的稳定性进行分析和预测,研究结果表明:在北帮中西部边坡,受F100断层的影响,剖面1~剖面3最终境界边坡处于不稳定状态或安全储备不足,特别是剖面1和剖面2的不稳定性较大。在剖面4上F100断层与最终境界边坡的距离已超过150 m,边坡已有足够的安全储备。在北帮中东部,受F114断层的影响,剖面5~剖面8最终境界边坡处于不稳定状态或安全储备不足。边坡沿F113断层和F115断层整体发生滑动的可能性不大,但断层在坡面出露处发生局部台阶破坏的可能性较大。 相似文献
5.
6.
7.
8.
9.
针对安太堡露天矿东帮北部高陡边坡出现的蠕滑问题,简述了边坡的工程背景和滑坡现状,研究了蠕滑区滑坡的主要形成因素及滑动机理;通过滑坡前后边坡面的形态、后缘张拉裂缝以及剪出口的位置对滑移面进行预测;运用FLAC3D建立了边坡三维地质模型,并进行边坡的变形破坏分析,结合极限平衡分析软件Geo-slope对边坡稳定性进行计算,开展边坡稳定性评价。研究结果表明:边坡变形破坏分为后缘切层滑动、坐落式顺层蠕滑、前缘底鼓滑动3个阶段;雨季降雨以及地下水是造成边坡滑坡的主要外在因素,边坡面顺倾、软弱夹层的存在是导致边坡蠕滑变形的内在因素;自然状态下边坡研究剖面1 180~1 240 m水平段边坡稳定性系数为1.02,蠕滑区边坡稳定性为存在一定风险,需在该区域开展具有针对性的专项治理措施。 相似文献
10.
11.
12.
胜利露天矿南排土场扩容研究 总被引:1,自引:0,他引:1
从南排土场的工程水文地质及排弃料物理力学性质入手,分析了排土场现状边坡及增加台阶后的边坡稳定状况。分析表明整体边坡都处于稳定状态,排土场扩容是可行的。 相似文献
13.
Many South African Gold Mines are geologically in proximity to the Transvaal Dolomites. This geological unit, is karstic in many areas and is very extensive. Very large volumes of ground water can be found in the dolomites, and have given rise to major dewatering problems on the mines. Hitherto, the general philosophy on the mines has been to acept these large inflows into the mine, and then to pump out from underground at a suitably convenient level. The dolomites constitute a ground water control area which means that Goverment permission is required to do anything with ground water within the dolomite. When the first major inflows occurred, the mines started dewatering the dolomites, and in many areas induced sinkholes, with significant loss of life and buildings. The nett result is that mines have to pump large quantities of water out of the mine but recharge into the dolomite to maintain water levesl. During the past 2 years a number of investigations have been carried out to reduce the very high costs of dewatering. On one mine the cost of removing 130×103 m3/day is about 1×106 Rand/month. The hydrogeologic model for the dolomites is now reasonably well understood. It shows that surface wells to a depth of up to 150 m can withdraw significant quantities of water and reduce the amount that has to be pumped from considerable depth with significant saving in puming costs. Such a system has a number of additional advantages such as removing some of the large volume of water from the underground working environment and providing a system that can be used for controlled surface dewatering should it be required. 相似文献
14.
15.
通过理论分析和现场试验,查明了南露天爆破根底和大块的产生原因;根据南露天工程地质特点和生产实际状况,制定相应的爆破根底及大块综合治理技术措施,使金堆城南露天采场的根底和大块率降至正常生产允许的范围,提高了爆破质量和铲装效率,为南露天剥离工程生产效率的提高和南露天生产爆破设计提供技术依据。 相似文献
16.
17.
18.
19.
20.
在分析扎哈淖尔露天煤矿南帮滑坡区边坡工程地质条件的基础上,通过现场踏勘与分析,确定了滑体内弱层的位置与形态,明确了滑坡模式、成因与力学机制,采用极限平衡法,基于多重正、反分析理论相结合,确定了南帮滑坡区边坡岩土体与弱层的力学参数。通过定量分析边坡稳定性,为滑坡体清理方案及到界边坡施工方案设计提供了参考和依据。 相似文献