首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 12 毫秒
1.
Since redundant relationships in an activity-on-node (AON) project network indicate that the schedule is more complex than it actually is, they should not be considered when evaluating the schedule complexity. However, identifying the relationships that can be removed while maintaining the project logic is not an easy task. For this purpose, this paper proposes a methodology, adapted from interpretive structural modeling, that basically transforms an AON project network into a network called minimum-edge diagraph which contains no redundant relationships. The methodology steps are explained through a demonstrative example of a simple hypothetical project. The application of the methodology to the AON network of a real construction project shows that it is easy to use yet effective in removing redundant relationships.  相似文献   

2.
Time and cost are related on projects. Project managers are frequently required to make time-cost trade-offs. With the complexity of large projects and the schedule impact of time-cost modifications, decisions on time-cost optimization are usually done on a hit or miss basis. This technical note presents an innovative technique that can be used to automate and optimize the time-cost trade-off process. The technique is based on “maximum flow–minimal cut” theory. The method is an improvement over current practice.  相似文献   

3.
Construction contractors often finance projects using bank credit lines that allow contractors to withdraw money up to certain credit limits. Finance-based scheduling provides schedules that ensure that the contractor’s indebtedness at any time during the construction stage does not exceed the credit limit. Generally, constricted credit limits tend to yield prolonged schedules. Provided that credit limits can be adequately relaxed, compressed schedules of compressed-duration activities can be attained. Devising a compressed schedule calls for the incorporation of time-cost trade-off (TCT) analysis to strike a balance between the decreased overhead costs and the increased direct costs of the activities. Since employing TCT analysis usually causes great fluctuations in the daily resource requirements by mixing compressed-duration activities of high resource demand with others of low resource demand, therefore, the need for resource management techniques becomes inevitable to ensure efficient utilization of resources. This note used genetic algorithms to expand finance-based scheduling to devise schedules for relaxed credit limits. A prototype system was developed and coded using VISUAL BASIC, then demonstrated using a five-activity example project. The prototype was validated by comparing the results with those obtained by using the integer programming. Expanding finance-based scheduling to handle the whole spectrum of credit limits helps devise overall-optimized schedules that consider cash, time, cost, and resources.  相似文献   

4.
Network scheduling is typically performed in three phases—network creation, analysis, and development. Although the critical path method (CPM) constitutes a well-established logic in network analysis, human intuition and experience are required for the creation and development of the network. Because of this, a variety of alternative CPM networks can be created in scheduling the same project. The use of the most desirable network can lead to a considerable reduction in the duration of the projects. This can be achieved by accurately identifying activities and linking them in an appropriate manner. Many researchers insisted that network scheduling lacks efficiency in scheduling repetitive-unit projects. Because of this, many scheduling methods have been developed to model such types of projects. However, most are not network based and require a large amount of input data, although most leading scheduling software remains network based and field engineers desire networklike forms of the schedule. In an effort to overcome this limitation, this paper presents a procedure for creating and developing networks for repetitive-unit projects. This network-based model incorporates a two-dimensional arrangement of activities, resource-space coordinates, for ease in creating a network and optimizes the activity linkage, thus resulting in the most desirable results. The model is applied to a typical repetitive-unit project to illustrate the use and capabilities of the model. The model can serve as an aid for inexperienced schedulers in creating a network as well as its optimization. An experienced scheduler can also check the desirability of his or her own created network via the use of this model.  相似文献   

5.
Factors Affecting the Success of a Construction Project   总被引:1,自引:0,他引:1  
Different researchers have tried to determine the factors for a successful project for a long time. Lists of variables have been abounded in the literature, however, no general agreement can be made. The aim of this paper is to develop a conceptual framework on critical success factors (CSFs). Seven major journals in the construction field are chosen to review the previous works on project success. Five major groups of independent variables, namely project-related factors, project procedures, project management actions, human-related factors, and external environment are identified as crucial to project success. Further study on the key performance indicators (KPIs) is needed to identify the causal relationships between CSFs and KPIs. The causal relationships, once identified, will be a useful piece of information to implement a project successfully.  相似文献   

6.
This paper presents a new algorithm, called the enumerative branch-and-cut procedure (EBAC), for minimizing the total project duration of a construction project under multiple resource constraints based on an enumeration tree. The EBAC generates new branches to the tree corresponding to “better” feasible alternatives. It starts with all of the feasible schedule alternatives as the trial schedule alternatives at any node. The trial schedule alternatives are then evaluated to determine whether they are “worse” than any existing partial schedules in the tree by using the presented cut rules, and a worse alternative will be eliminated from the enumeration tree. In other words, the tree will contain only better feasible schedules. The presented algorithm has been coded in the VB6.0 language on a personal computer. It has been tested with the 110 scheduling problems, which have been widely used for validating a variety of schedule algorithms over the last 20?years. The EBAC can obtain the shortest project durations for all of the 110 problems.  相似文献   

7.
Published criticism in recent years concerning the inadequacy of Critical Path Method (CPM) as a project planning tool is identified and grouped under six major headings with reference to the publications in which the criticism were contained. These are answered from the writer's field experience and from experiences published by other authors. The object of the analysis is to see whether or not CPM as a project planning tool can meet the required functions of planning in construction, including consideration of legal and contractual framework and the complex and interdisciplinary nature of the project environment. The analysis reveals that, despite numerous criticism, project and construction planning should be done using CPM scheduling. Main factors affecting successful planning are realistic estimation of the productivity of crews in the context of expected job‐management efficiency conditions, and inclusion of sufficient time buffers between dissimilar trades. CPM is found to be equally useful as a planning tool for linear or repetitive projects. The limitations of this technique are identified in terms of the defined planning functions in the engineering phase of capital projects. A broad model for management of the engineering phase in revenue‐generating projects is suggested.  相似文献   

8.
Much of the project scheduling literature treats task durations as deterministic. In reality, however, task durations are subject to considerable uncertainty, and that uncertainty can be influenced by the resources assigned. The purpose of this paper is to provide the means for contractors to optimally allocate their skilled workers among individual tasks for a single project. Instead of the traditional use of schedules, we develop control policies in the form of planned resource allocation to tasks that capture the uncertainty associated with task durations and the impact of resource allocation on those durations. We develop a solution procedure for the model and illustrate the ideas in an example. The data for the example is collected from a real project.  相似文献   

9.
Contractors are required by the Michigan Department of Transportation (MDOT) to submit a progress schedule identifying the controlling path of activities for a construction project. During the 2000 construction season, MDOT allowed contractors to submit a progress schedule with overlapping or concurrent controlling operations. Prior to this, only one activity at a time could be controlling on the progress schedule. This paper reports on the results of a research project where the focus was to examine the accuracy of the progress schedules, which only list controlling items. Eight construction projects were studied and a determination of progress schedule accuracy was made. This was done to determine if there was an increase in accuracy of the schedules when concurrent controlling operations were used. Included in the eight projects were four without concurrent controlling activities and four with concurrent controlling activities. A comparison based upon similar projects with and without concurrent activities was made. Additionally, 22 projects were analyzed, all without concurrent controlling activities, to determine the accuracy of progress schedules for two types of projects. The comparison revealed that, in three of the four cases, the accuracy of progress schedules increased with the allowance of concurrent controlling activities. The 22 projects revealed that the accuracy of progress schedules varied considerably. It was also determined that contractors overestimated the duration of activities included in progress schedules.  相似文献   

10.
11.
A poor scope definition in an engineering design project disrupts project rhythm, causes rework, increases project time and cost, and lowers the productivity and morale of the workforce. A quantitative measurement of the project scope is the basis for productivity modeling that involves the measurement, estimation, control, and evaluation of productivity. This paper proposes a conceptual model, the quantitative engineering project scope definition (QEPSD), to standardize the measurement of engineering project scope in construction projects, within a computer aided design environment. The QEPSD quantitatively measures engineering project scope, in terms of the complexity of design items by defining design categories and complexity functions appropriate to the particular discipline. The proposed method was originally verified and implemented specifically for steel drafting projects. Actual data was analyzed and used to demonstrate the benefits of historical data prepared using QEPSD for project scope definition. It was found that the new method led to increased utilization of previously untapped values in historical data, improving the accuracy of project scope definition, and productivity modeling. The paper concludes with a discussion of the potential benefits of adopting the QEPSD method, and its implications upon various project management functions.  相似文献   

12.
Environmentally sustainable building construction has experienced significant growth during the past 10 years. The public is becoming more aware of the benefits of green construction as prominent politicians, celebrities, documentarians, and journalists highlight the built environment’s impact on greenhouse gas emissions and natural resource consumption. Other factors, including higher energy prices, increased costs of building materials, and regulatory incentives, are also pushing the green building market to grow and expand. However, barriers to green building continue to exist, including the ability to deliver a green project within acceptable cost constraints. In order for project managers to deliver sustainable construction according to clients’ cost expectations, modifications must be made to traditional project management processes and practices. The objective of this paper is to suggest specific modifications to conventional building practices to optimize the delivery of cost-efficient green building projects. This paper presents an overview of research related to the costs and trends of green building and uses these research findings to make recommendations for greening project management practices for the construction industry. Our research results show that greening project management practices can add significant value to a sustainable construction project while delivering it within acceptable cost constraints. A detailed analysis using matrix present specific adjustments to traditional project management practices, with a premise that a green project improves its chances for financial success if a cross-discipline team is involved at the earliest stages and throughout the project.  相似文献   

13.
This paper presents the critical path method forward and backward passes with multiple calendars. Multiple calendars are required in many construction projects to effectively represent various project conditions such as work properties, resource availabilities, weather conditions, etc. For this reason, major project management software packages such as P3 and MS-Project provide functions to handle multiple calendars. However, the background theory of handling multiple calendars has not been disclosed, so users of those software packages simply assume without clear knowledge that the time data generated by them are correct. This paper provides how multiple calendars should be handled in scheduling. Applying the theory presented herein, it has been noticed that the P3 operations with two calendars may generate a wrong answer for a start-to-finish with zero lag and inconsistent results in all negative lags when nonworking days are involved. The theory covers all four relationships in the precedence diagramming method with lags of zero, positive, and negative values. This study should be of considerable benefit to the construction industry and academics because it details and advances the theory for scheduling with multiple calendars, which is real scheduling in practice.  相似文献   

14.
15.
16.
Repetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit-based algorithm for the planning and scheduling of repetitive projects is developed. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The algorithm takes into consideration: (1) the logical relationship of activity groups in a repetitive project; (2) the usage of various resource crews in an activity group; (3) the maintaining of resource continuity; and (4) the time and cost for the routing of resource crews. A sample case study and a case study of a sewer system project are conducted to validate the algorithm, as well as to demonstrate its application. Results and findings are reported.  相似文献   

17.
The success of a construction project depends on the coordinated efforts of project team members. This is especially crucial when a project is in dispute and hence the achievement of satisfactory project dispute resolution is critical to project success. This proposition has been empirically demonstrated a previous research that studied project dispute resolution satisfaction (DRS) using multivariate discriminant analysis (MDA). This paper reports on a study that builds on that research, with the specific aim of predicting project DRS through the use of logistic regression (LR). In this study, a LR model of project DRS (Model 1) is developed, and then compared with the MDA model. The findings suggest that the LR technique provides a higher hit rate and thus a higher proportion of correct classification. With the wider acceptance of the use of alternative dispute resolution (ADR) methods, the effect, on the LR model, of changing the demarcation between adverse and favorable project DRS is also examined. For this examination, another LR model (Model 2) was developed. It is believed that Model 2 may reflect the prevailing sentiment that ADR is viewed as an amicable way to resolve disputes. Both the MDA model and LR models (Model 1 and Model 2) indicated that “design changes” are the root cause of adverse project DRS. Within the scope of the project data, these findings suggest that design changes are not just disruptive to project progress but also a critical cause of construction disputes.  相似文献   

18.
In the light of particle swarm optimization (PSO) which utilizes both local and global experiences during search process, a permutation-based scheme for the resource-constrained project scheduling problem (RCPSP) is presented. In order to handle the permutation-feasibility and precedence-constraint problems when updating the particle-represented sequence or solution for the RCPSP, a hybrid particle-updating mechanism incorporated with a partially mapped crossover of a genetic algorithm and a definition of an activity-move-range is developed. The particle-represented sequence should be transformed to a schedule (including start times and resource assignments for all activities) through a serial method and accordingly evaluated against the objective of minimizing project duration. Experimental analyses are presented to investigate the performances of the permutation-based PSO. The study aims at providing an alternative for solving the RCPSP in the construction field by utilizing the advantages of PSO.  相似文献   

19.
Currently there are no formal decision tools or guidelines to assist owners and project managers in choosing delivery systems and project strategies that would allow significant reductions in the project cycle time. The development of a decision aid that would allow a project manager to prioritize and apply project cycle reduction techniques would be a valuable tool for achieving project cycle time reduction in projects. This paper presents a new high performance project delivery system called “project manager’s game planner” (PMGP) designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques (RRTs) with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five project phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the project performance whether to achieve significant cycle time reduction or to simply achieve effective project execution.  相似文献   

20.
Over 40% of Indian construction projects are facing time overrun ranging from 1 to 252 months; the reasons for which are being studied by researchers to suggest possible remedial measures. This paper identifies 55 attributes responsible for impacting performance of the projects. These attributes were then presented to Indian construction professionals in the form of a questionnaire. Statistical analysis of responses on the attributes segregated them into distinct sets of success attributes and failure attributes. Factor analysis of sets of success attributes and failure attributes separately grouped them into six critical success factors and seven critical failure factors. In order to understand the extent of contribution these factors have on the outcome of a construction project, a second stage questionnaire survey was also undertaken. The analyses of responses of the second stage questionnaire led us to conclude that two success factors and one failure factor: commitment of project participants; owner’s competence; and conflict among project participants contribute significantly in enhancement of current performance level of the project. The extent of their contribution has, however, been observed to vary for a given level of project performance. The analyses results are expected to help project professionals to focus on a few factors and get the optimum results rather than giving attention to all the factors and not getting the proportionate results.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号