首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 890 毫秒
1.
An upgrade of the electron cyclotron heating system on DIII-D to almost 15 MW is being planned which will expand it from a system with six 1 MW 110 GHz gyrotrons to one with ten gyrotrons. A depressed collector 1.2 MW 110 GHz gyrotron is being commissioned as the seventh gyrotron. A new 117.5 GHz 1.5 MW depressed collector gyrotron has been designed, and the first article will be the eighth gyrotron. Two more are planned, increasing the system to ten total gyrotrons, and the existing 1 MW gyrotrons will subsequently be replaced with 1.5 MW gyrotrons.Communications and Power Industries completed the design of the 117.5 GHz gyrotron, and are now fabricating the first article. The design was optimized for a nominal 1.5 MW at a beam voltage of 105 kV, collector potential depression of 30 kV, and beam current of 50 A, but can achieve 1.8 MW at 60 A. The design of the collector permits modulation above 100 Hz by either the body or the cathode power supply, or both, while modulation below 100 Hz must use only the cathode power supply.General Atomics is developing solid-state power supplies for this upgrade: a solid-state modulator for the cathode power supply and a linear high voltage amplifier for the body power supply. The solid-state modulator has series-connected insulated-gate bipolar transistors that are switched at a fixed frequency by a pulse-width modulation regulator to control the output voltage. The design of the linear high voltage amplifier has series-connected transistors to control the output voltage, which was successfully demonstrated in a proof-of-principle test at 2 kV. The designs of complete power supplies are progressing.The design features of the 117.5 GHz 1.5 MW gyrotron and the solid-state cathode and body power supplies will be described and the current status and plans are presented.  相似文献   

2.
A 20 MW Lower Hybrid Current Drive system using an antenna based on the Passive-Active Multijunction (PAM) concept is envisaged on ITER. This paper gives an overview of the mechanical analysis, modeling and design carried out on two major elements of the antenna: the grill front face, and the RF feed-through or windows. The front face will have to withstand high heat and fast neutrons fluxes directly from the plasma. It will be actively cooled and present a beryllium coating upon ITER requirement. The RF window being a critical safety importance class component (SIC) because of its tritium confinement function, two of them will be put in series on each line to achieve a double barrier. A design of a water cooled 5 GHz CW RF “pillbox” window capable of sustaining 500 kW of transmitted power is proposed. Both studies allow to move forward, and focus on critical issues, such as manufacturing processes and R&D associated programs including tests of mock-ups.  相似文献   

3.
For JET to fulfil its mission in preparing ITER operation, the installation of an electron cyclotron resonance heating system on JET would be desirable. The study described in this paper has investigated the feasibility of installing such a system on JET. The principal goals of such a system are: current drive over a range of radii for NTM stabilization, sawtooth control and current profile tailoring and central electron heating to equilibrate electron and ion temperatures in high performance discharges. The study concluded that a 12 gyrotron, 10 MW, system at the ITER frequency (170 GHz) adapted for fields of 2.7–3.3 T would be appropriate for the operation planned in JET. An antenna allowing toroidal and poloidal steering over a wide range is being designed, using the ITER upper launcher steering mechanism. The use of ITER diamond windows and transmission line technology is suggested while power supply solutions partially reusing existing JET power supplies are proposed. Detailed planning shows that such a system can be operational in about 5 years from the time that the decision to proceed is taken. The cost and required manpower associated with implementing such a system on JET has also been estimated.  相似文献   

4.
In the framework of the EFDA task HCD-08-03-01, the ITER lower hybrid current drive (LHCD) system design has been reviewed. The system aims to generate 24 MW of RF power at 5 GHz, of which 20 MW would be coupled to the plasmas. The present state of the art does not allow envisaging a unitary output of the klystrons exceeding 500 kW, so the project is based on 48 klystron units, leaving some margin when the transmission lines losses are taken into account. A high voltage power supply (HVPS), required to operate the klystrons, is proposed. A single HVPS would be used to feed and operate four klystrons in parallel configuration. Based on the above considerations, it is proposed to design and develop twelve HVPS, based on pulse step modulator (PSM) technology, each rated for 90 kV/90 A. This paper describes in details, the typical electrical requirements and the conceptual design of the proposed HVPS for the ITER LHCD system.  相似文献   

5.
The design and overall dimensions of a 5 GHz TE10–TE30 mode converter are presented. This mode converter is a RF element of a 20 MW CW lower hybrid system proposed for ITER. A low power mock-up of this device has been manufactured at CEA/IRFM and measured at low power. RF measurements indicate a return loss of 40 dB and a transmission loss of 4.78 dB ± 0.03 dB for the three outputs. The forward conversion efficiency from TE10 mode to TE30 has been measured from electric field probing to 99.9%. The good RF performances obtained validate the RF design of this element.  相似文献   

6.
In the frame of the EFDA task HCD-08-03-01, a 5 GHz Lower Hybrid system which should be able to deliver 20 MW CW on ITER and sustain the expected high heat fluxes has been reviewed. The design and overall dimensions of the key RF elements of the launcher and its subsystem has been updated from the 2001 design in collaboration with ITER organization. Modeling of the LH wave propagation and absorption into the plasma shows that the optimal parallel index must be chosen between 1.9 and 2.0 for the ITER steady-state scenario. The present study has been made with n|| = 2.0 but can be adapted for n|| = 1.9. Individual components have been studied separately giving confidence on the global RF design of the whole antenna.  相似文献   

7.
8.
The electron cyclotron heating system on DIII-D has been supporting experiments with six gyrotrons. The gyrotrons are connected to three power supplies: two have single modulators, each energizing two gyrotrons, while the third has three modulators that can energize three gyrotrons asynchronously. However, only two gyrotrons can be run synchronously due to the limitation of the high voltage dc power supply providing the input voltage to the modulators. These two configurations mimic proposed architectures of power systems for multiple gyrotron systems and demonstrate their advantages or disadvantages, which will be discussed in more detail. A fourth power system is being built as part of an upgrade to eight gyrotrons. The two future gyrotrons will have depressed collectors. A 1.2 MW gyrotron will be delivered in mid-2011 and the design of a 1.5 MW gyrotron has been initiated. This fourth power supply will have two modulators to independently energize the cathode of each gyrotron. Commercially available high voltage amplifiers will provide the body voltage. It will also have a solid-state crowbar instead of an ignitron crowbar. This power supply is described in more detail, as well as the testing performed on the solid-state crowbar to prove its performance.  相似文献   

9.
A Korean high heat flux test facility for the semi-prototype (SP) qualification of an ITER first wall (FW) will be constructed to evaluate the fabrication technologies required for the ITER FW, and the acceptance of these developed technologies will be established for the ITER FW manufacturing procedure. Korea participated in this qualification program, and is responsible for suitable arrangements for the heat flux test of our fabricated SPs. Qualification testing can be started provided that adequate quality and control measures are implemented and validated by the ITER Organization (IO). The controlling measures required for all heat flux tests shall be concrete and demonstrate the satisfaction of the IO test programs. Each country shall provide a test plan covering the quality and controlling measures in the high heat flux test facility to be implemented throughout the test program. Korean high heat flux testing for these ITER plasma facing materials will be performed by using a 60 kV electron beam and a power supply system of 300 kW, where the allowable target dimension is 70 cm × 50 cm in a vacuum chamber. In addition, this facility needs a cooling system for a high-temperature target and decontamination system for beryllium filtration.  相似文献   

10.
The Korean Superconducting Tokamak Advanced Research (KSTAR) superconducting magnet power supply is composed of a Poloidal Field Magnet Power Supply (PF MPS) and a Toroidal Field Magnet Power Supply (TF MPS). When the PF MPS is operated, it requires a large amount of power instantaneously from the KSTAR electric power system. To achieve the KSTAR operational goal, with a long pulse scenario, a peak power of 200 MVA is required and the total power demand for the KSTAR system can exceed 200 MVA. The available grid power is only 100 MVA at the KSTAR site. Increasing the available grid power was uneconomical and inefficient which is why NFRI are installing a Motor Generator (MG).National Fusion Research Institute (NFRI) has made a contract with Vitzrotech and Converteam to design, manufacture and install the MG. Converteam has designed the electromagnetic and mechanical specification of the MG and Variable Voltage Variable Frequency (VVVF) converter.In this paper we discuss the conceptual design, including energy saving and electrical capacity of the MG system and the performance of the MG to satisfy the KSTAR 300 s operation scenario. In addition, the manufacturing and installation plan for the KSTAR MG is discussed.  相似文献   

11.
A 3.6 MW (66 kV/55 A) DC power supply system was developed for the 170 GHz EC H&CD system in KSTAR. The power supply system consists of a cathode power supply (CPS), an anode power supply (APS) and a body power supply (BPS). The cathode power supply is capable of supplying a maximum voltage of ?66 kV and a current of 55 A to the cathode with respect to the collector using pulse step modulation (PSM). The high voltage switching system for the cathode is made by a fast MOS-FET solid-state switch which can turn off the high voltage to the cathode within 3 μs in the occurrence of gyrotron faults. The APS is a voltage divider system consisting of a fixed resistor and zener diode units with the capability of 60 kV stand-off voltage. The anode voltage with respect to the cathode is controlled in a range of 0–60 kV by turning the MOS-FET switches connected in parallel to each zener diode on and off. For high frequency current modulation of the gyrotron, the parallel discharge switch is introduced between the cathode and anode in order to clamp the charged voltage in the stray capacitance. The BPS is a DC power supply with the capability of 50 kV/160 mA. The nominal operation parameter of BPS was 23 kV and 10 mA, respectively, and the voltage output is regulated with a stability of 0.025% of the rated voltage. The series MOS-FET solid-state switch is used for on/off modulation in the body voltage sychronizing with anode voltage. The parallel discharge switch is also introduced between the body and collector for high frequency RF modulation. This paper describes the key features of the high voltage power supply system of the KSTAR 170 GHz gyrotron as well as the test results of the power supply.  相似文献   

12.
One important objective of the EU fusion roadmap Horizon 2020 is to lay the foundation of a Demonstration Fusion Power Reactor (DEMO) to follow ITER, with the capability of generating several 100 MW of net electricity to the grid and operating with a closed fuel-cycle by 2050. This is currently viewed by many of the nations engaged in the construction of ITER as the remaining crucial step towards the exploitation of fusion power. This paper outlines the DEMO design and R&D approach that is being adopted in Europe and presents some of the preliminary design options that are under evaluation as well as the most urgent R&D work that is expected to be launched in the near-future. The R&D on materials for a near-term DEMO is discussed in detail elsewhere.  相似文献   

13.
Initial testing on the Japan Atomic Energy Agency Gyrotron Test Stand of ITER-relevant TL components, has shown reasonable efficiencies, but identified that trapped modes between closely located miter bends, as well as mode conversion at miter bends can lead to excessive heating of the connecting waveguides. General Atomics has designed, built, and will test components to address this issue as well as ITER relevant components that have not been tested at the levels of 1 MW, 170 GHz, for extended pulse lengths. Some of the components that will be tested are ultra low loss miter bends, dc breaks, polarizers, power monitors, bellows, waveguide switches, waveguide cooling clamps, etc. Details of the components and test results will be presented.  相似文献   

14.
316LN stainless steel is selected as a material for toroidal-field (TF) conductor jacket of International Thermonuclear Experimental Reactor (ITER). In order to evaluate the true mechanical performance of the jacket material at 4.2 K and its suitability as the ITER TF conductor jacket, the mechanical properties of the full-size TF conductor jacket tube and sub-size specimens at 4.2 K and 300 K were investigated according to ASTM standards. The measured yield strength and elongation at 4.2 K for sub-size specimens and full-size tubes are more than 950 MPa and 20%, respectively. In addition, the fractographies of all fractured specimens were observed using scanning electron microscope (SEM). These results suggest that the TF conductor jacket can satisfy ITER requirements and the result of the full-size tube at 4.2 K is more representative and important for practical applications.  相似文献   

15.
16.
The Ion Cyclotron Heating and Current Drive (IC H&CD) system for ITER will provide 20 MW to the plasma. The associated Radio Frequency (RF) source system has to be compliant with all operation modes foreseen in that frame. Their specifications are fully described in this paper and constraints on IC RF source components are detailed, in particular concerning the final stage tube of the amplifier. Results of tests performed under a collaborative work at the National Institute for Fusion Science (NIFS) facility are presented. Consequences on the procurement process by ITER India (II) are deduced.  相似文献   

17.
In the framework of the strategy for the development and the procurement of the NB systems for ITER, it has been decided to build in Padova a test facility, including two experimental devices: a full size plasma source with low voltage extraction and a full size NB injector at full beam power (1 MV). These two different devices will separately address the main scientific and technological issues of the 17 MW NB injector for ITER. In particular the full size plasma source of negative ions will address the ITER performance requirements in terms of current density and uniformity, limitation of the electron/ion ratio and stationary operation at full current with high reliability and constant performances for the whole operating time up to 1 h. The required negative ion current density to be extracted from the plasma source ranges from 290 A/m2 in D2 (D?) and 350 A/m2 in H2 (H?) and these values should be obtained at the lowest admissible neutral pressure in the plasma source volume, nominally at 0.3 Pa. The electron to ion ratio should be limited to less than 1 and the admissible ion inhomogeneity extracted from the grids should be better than 10% on the whole plasma cross-section having a surface exposed to the extraction grid of the order of 1 m2.The main design choices will be presented in the paper as well as an overview of the design of the main components and systems.  相似文献   

18.
As part of its mission to prepare the operation of ITER, a major programme of enhancements has just been completed on the JET tokamak. These enhancements include a complete replacement of the plasma-facing components in JET, from carbon-based to the combination of beryllium and tungsten foreseen for ITER, an upgrade of the neutral beam heating available on JET from 20 MW/short pulse to 30 MW/long pulse operation, the installation of a high frequency pellet injection system for plasma fuelling and ELM control studies, an upgrade to the JET vertical stability system and a suite of new diagnostics.The future JET programme is foreseen to proceed progressively from a test of fuel retention in the standard regimes of ITER operation towards more aggressive, high performance experiments that will demonstrate the operating space limits with the new wall. Depending on the results of the earlier experiments, the exploitation of the enhancements is foreseen to be completed with a deuterium-tritium experiment. This would represent the most integrated test of ITER operational scenarios possible before ITER itself.JET is a cooperative programme funded and exploited in collaboration by all of the European fusion laboratories. As such, JET is a test bed for multi-national use of a single fusion facility, as is foreseen for ITER. Opportunities for broadening the participation in JET to other ITER Parties are presently being explored. If these opportunities can be implemented, JET would provide not only an integrated test of ITER regimes of operation but also a demonstration of how ITER will be operated, even to the extent of including significant numbers of the same team who will eventually operate ITER.  相似文献   

19.
A high power (20 MW) and CW millimeter wave (mm-wave) injection is planned for Electron Cyclotron Heating and Current Drive (EC H&CD) in ITER. An optimization of the mm-wave system for the ITER EC H&CD Equatorial Launcher (EL) is performed. The optimization of the system is aimed to obtain the maximum transmission efficiency on the condition that 1.8 MW injection per waveguide, ∼20 cm in beam radius at the resonance layer and narrow opening of the Blanket Shielding Module (BSM). The transmission efficiency of 99.1% from the end of the waveguide inside the launcher to the output of the BSM is achieved.The mm-wave propagation with high order modes is also calculated by using an experimentally obtained high power mm-wave beam pattern that includes 95%HE11, 0.6%LP11, 0.2%LP02 and 4.2% other higher order modes. The analysis predicts the 1–2% additional loss will be induced by the high order modes.  相似文献   

20.
The ITER Ion Cyclotron Resonant Heating (ICRH) antenna provides plasma heating at a power of 20 MW. Operation in the ITER environment imposes significant thermal power handling capability, structural integrity, shielding and operations requirements. The design will require a step change over any predecessor in terms of power, scale and complexity. This paper reports the main mechanical design features that address the challenges and often conflicting requirements during the conceptual design phase.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号