首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States.The risk of ground falls during pillar recovery increases in multiple-seam mining conditions.The hazards associated with pillar recovery in multiple-seam mining include roof cutters, roof falls, rib rolls, coal outbursts, and floor heave.When pillar recovery is planned in multiple seams, it is critical to properly design the mining sequence and panel layout to minimize potential seam interaction.This paper addresses geotechnical considerations for concurrent pillar recovery in two coal seams with 21 m of interburden under about 305 m of depth of cover.The study finds that, for interburden thickness of 21 m, the multiple-seam mining influence zone in the lower seam is directly under the barrier pillar within about 30 m from the gob edge of the upper seam.The peak stress in the interburden transfers down at an angle of approximately 20°away from the gob, and the entries and crosscuts in the influence zone are subjected to elevated stress during development and retreat.The study also suggests that, for full pillar recovery in close-distance multiple-seam scenarios,it is optimal to superimpose the gobs in both seams, but it is not necessary to superimpose the pillars.If the entries and/or crosscuts in the lower seam are developed outside the gob line of the upper seam,additional roof and rib support needs to be considered to account for the elevated stress in the multiple-seam influence zone.  相似文献   

2.
With the depletion of easily minable coal seams, less favorable reserves under adverse conditions have to be mined out to meet the market demand. Due to some historical reasons, large amount of remnant coal was left unrecovered. One such case history occurred with the remnant rectangular stripe coal pillars using partial extraction method at Guandi Mine, Shanxi Province, China. The challenge that the coal mine was facing was that there is an ultra-close coal seam right under it with an only 0.8–1.5 m sandstone dirt band in between. The simulation study was carried out to investigate the simultaneous recovery of upper remnant coal pillars while mining the ultra-close lower panel using longwall top coal caving(LTCC). The remnant coal pillar was induced to cave in as top coal in LTCC system. Physical modelling shows that the coal pillars are the abutments of the stress arch structure formed within the overburden strata. The stability of overhanging roof strata highly depends on the stability of the remnant coal pillars. And the gob development(roof strata cave-in) is intermittent with the cave-in of these coal pillars and the sandstone dirt band. FLAC3 D numerical modelling shows that the multi-seam interaction has a significant influence on mining-induced stress environment for mining of lower panels. The pattern of the stress evolution on the coal pillars with the advance of the lower working face was found. It is demonstrated that the stress relief of a remnant coal pillar enhances the caveability of the pillars and sandstone dirt band below.  相似文献   

3.
The method of determining coal pillar strength equations from databases of stable and failed case histories is more than 50 years old and has been applied in different countries by different researchers in a range of mining situations. While common wisdom sensibly limits the use of the resultant pillar strength equations and methods to design scenarios that are consistent with the founding database, there are a number of examples where failures have occurred as a direct result of applying empirical design methods to coal pillar design problems that are inconsistent with the founding database. This paper explores the reasons why empirically derived coal pillar strength equations tend to be problem-specific and should be considered as providing no more than a pillar strength ‘‘index." These include the non-consideration of overburden horizontal stress within the mine stability problem, an inadequate definition of supercritical overburden behavior as it applies to standing coal pillars, and the non-consideration of overburden displacement and coal pillar strain limits. All of which combine to potentially complicate and confuse the back-analysis of coal pillar strength from failed cases. A modified coal pillar design representation and model are presented based on coal pillars acting to reinforce a horizontally stressed overburden, rather than suspend an otherwise unstable self-loaded overburden or section, the latter having been at the core of historical empirical studies into coal pillar strength and stability.  相似文献   

4.
In order to reach a large, untapped reserve of high-quality coal, D8 Cloverlick Mine proposed to mine a corridor nearly 600 m deep beneath the Benham Spur of Black Mountain, Kentucky's highest peak. D8 Cloverlick Mine was extracting the Owl seam, but the corridor's route lay approximately 20 m above century-old mine workings in the C–(Darby) seam. Adding to the concern, three serious coal bursts had recently occurred in nearby Owl seam workings. Maps of the old workings seemed to indicate that the underlying C–seam had been fully extracted. However, two of the coal bursts had occurred above areas where the C–Seam was also shown as mined out. Mine Safety and Health Administration(MSHA) Technical Support therefore investigated the records of past mining to better understand the old mine maps. Underground conditions observed in current Owl seam workings were also compared with the maps of the old C–seam workings. The study concluded that the presence of hazardous underlying remnants could not be ruled out. To mitigate the burst risk, D8 Cloverlick Mine adopted a strategy of stress probe drilling. A self-propelled coal drill was used to auger 11.5-m-long, small diameter holes in advance of mining. As each hole was drilled, the cuttings were measured to detect the presence of highly stressed coal. Ultimately the crossing was successfully completed without incident.  相似文献   

5.
This study mainly investigates the mechanical mechanism of overlying strata breaking and the development of fractured zones during close-distance coal seam group mining in the Gaojialiang coal mine. First,a mechanical model for the second ‘‘activation" of broken overlying strata is established, and the related mechanical ‘‘activation" conditions are obtained. A recursive formula for calculating the separation distance of overlying strata is deduced. Second, a height determining method for predicting the height of fractured zones during close-distance coal seam group mining is proposed based on two values, namely,the separation distance and ultimate subsidence value of overlying strata. This method is applied to calculate the fractured zone heights in nos. 20107 and 20307 mining faces. The calculated results are almost equal to the field observation results. Third, a modified formula for calculating the height of a waterflowing fractured zone is proposed. A comparison of the calculated and observed results shows that the errors are small. The height determining method and modified formula not only build a theoretical foundation for water conservation mining at the Gaojialiang coal mine, but also provide a reference for estimating the height of water-flowing fractured zones in other coal mines with similar conditions.  相似文献   

6.
Aiming at the difficulty in stress analysis for strata under pillars with actual bearing conditions, an approach was proposed to apply multi-sectional linear approximation to the characteristic curves of pillar loads, and stress of strata was calculated under pillars with linear load by calculation method for uniform load. This approach leads to a rapid analyzing method for strata stress under pillars with any form of loads. Through theoretical analysis, strata stress expressions for pillars under linear bearing conditions are obtained. In addition, two concepts, stress increase factor and stress factor, are proposed for the approximate analysis of strata stress by uniform load approximation method. It is also found that the stress increase factor of strata is related to the strata stress factor and the ratio of the minimum load on the pillar’ two ends to the maximum one; and the distribution features of stress factors and the sizes of their influencing areas in strata influenced by overlying pillars are obtained. Combining with the gob pillar conditions of Jurassic coal seam in Tongxin Coal Mine, it is demonstrated that the results obtained by stress distribution analysis of the strata stress in non-influencing areas of pillars with linear bearing through uniform load approximation are in basic accordance with the results obtained for pillars under linear bearing condition. Therefore, it is feasible and accurate to calculate stress in non-influencing area in strata under pillars with linear bearing condition by uniform load calculation method.  相似文献   

7.
While the fully-mechanized longwall mining technology was employed in a shallow seam under a room mining goaf and overlained by thin bedrock and thick loose sands, the roadway pillars in the abandoned room mining goaf were in a stress-concentrated state, which may cause abnormal roof weighting, violent ground pressure behaviours, even roof fall and hydraulic support crushed(HSC) accidents. In this case,longwall mining safety and efficiency were seriously challenged. Based on the HSC accidents occurred during the longwall mining of 3-1-2 seam, which locates under the intersection zone of roadway pillars in the room mining goaf of 3-1-1 seam, this paper employed ground rock mechanics to analyse the overlying strata structure movement rules and presented the main influence factors and determination methods for the hydraulic support working resistance. The FLAC3 D software was used to simulate the overlying strata stress and plastic zone distribution characteristics. Field observation was implemented to contrastively analyse the hydraulic support working resistance distribution rules under the roadway pillars in strike direction, normal room mining goaf, roadway pillars in dip direction and intersection zone of roadway pillars. The results indicate that the key strata break along with rotations and reactions of the coal pillars deliver a larger concentrated load to the hydraulic support under intersection zone of roadway pillars than other conditions. The ‘‘overburden strata-key strata-roadway pillars-immediate roof" integrated load has exceeded the yield load that leads to HSC accidents. Findings in HSC mechanism provide a reasonable basis for shallow seam mining, and have important significance for the implementation of safe and efficient mining.  相似文献   

8.
Highwall mining of thick(up to 30.48 m) steeply dipping(20° or more) coal seams provides many chal lenges, both geotechnically and operationally, as seam dips near or in excess of highwall mining machine capabilities are encountered. Maximizing coal recovery while maintaining highwall stability requires innovative techniques with regard to web and barrier pillar layout, depth of penetration, and choice of mining horizon within the seam. Stability of highwall mining slopes, openings, and pillarsare typically analyzed using the ARMPS-HWM program, as well as LAMODEL, UDEC and SLOPE/W modeling.Highwall stability can be maintained, and highwall mining production optimized by applying design cri-teria in creative ways, including alternating miner penetration depths and initiating mining of thick seams toward the bottom of the seam. Highwall mining of thick, steeply dipping coal requires careful planning and execution, including close cooperation between geotechnical design engineers, the mining company, and the highwall mining contractor. This paper describes the application of creative design techniques to a specific pit arrangement at the Westmoreland Kemmerer Mine, Kemmerer,Wyoming. Highwall mining was accomplished by UGM ADDCAR Systems, LLC on a contract basis.  相似文献   

9.
A gas–solid coupling model involving coal seam deformation,gas diffusion and seepage,gas adsorption and desorption was built to study the gas transport rule under the effect of protective coal seam mining.The research results indicate:(1) The depressurization effect changes the stress state of an overlying coal seam and causes its permeability to increase,thus gas in the protected coal seam will be desorbed and transported under the effect of a gas pressure gradient,which will cause a decrease in gas pressure.(2) Gas pressure can be further decreased by setting out gas extraction boreholes in the overlying coal seam,which can effectively reduce the coal and gas outburst risk.The research is of important engineering significance for studying the gas transport rule in protected coal seam and providing important reference for controlling coal and gas outbursts in deep mining in China.  相似文献   

10.
For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines.Studies showed that a miner on a pillar recovery section was at least three times more likely to be killed by a roof fall than other coal miners. Since 2007, however, there has been just one fatal roof fall on a pillar line. This paper describes the process that resulted in this historic achievement. It covers both the key research findings and the ways in which those insights, beginning in the early 2000 s, were implemented in mining practice. One key finding was that safe pillar recovery requires both global and local stability.Global stability is addressed primarily through proper pillar design, and became a major focus after the2007 Crandall Canyon mine disaster. But the most significant improvements resulted from detailed studies that showed that local stability, defined as roof control in the immediate work area, could be achieved with three interventions:(1) leaving an engineered final stump, rather than extracting the entire pillar,(2) enhancing roof bolt support, particularly in intersections, and(3) increasing the use of mobile roof supports(MRS). A final component was an emphasis on better management of pillar recovery operations.This included a focus on worker positioning, as well as on the pillar and lift sequences, MRS operations,and hazard identification. As retreat mines have incorporated these elements into their roof control plans,it has become clear that pillar recovery is not ‘‘inherently unsafe." The paper concludes with a discussion of the challenges that remain, including the problems of rib falls and coal bursts.  相似文献   

11.
This paper analyzes the control mechanism of coal and gas outbursts and proposes the concept of an effective pressure relief protection range, based on the stress relief of the underlying coal-rock mass and the development of a plastic zone. Also this study developed a stress change and fracture development model of the underlying coal-rock mass. In addition, the stress and depth of fracture of any point in the floor were deduced with the application of Maple Calculation Software. The specific engineering parameters of the Pingdingshan No. 12 colliery were applied to determine the relationship between the depth of fracture in the floor and the mining height. The pressure-relief principle of the underlying coal-rock mass was analyzed while varying the mining height of the upper protective seam. The findings indicate that as the depth of fracture in the floor increases, the underlying coal-rock mass experiences a limited amount of pressure relief, and the pressure relief protection range becomes narrower.Additionally, the stress distribution evolves from a ‘‘U" shape into a ‘‘V" shape. A 2.0 m mining height of protective seam situates the outburst-prone seam, Ji_(15), within the effective pressure relief protection range. The fracture development and stress-relief ratio rises to 88%, ensuring the pressure-relief effect as well as economic benefits. The measurement data show that: after mining the upper protective seam, the gas pressure of Ji_(15) dropped from 1.78 to 0.35 MPa, demonstrating agreement between the engineering application and the theoretical calculation.  相似文献   

12.
Aiming to address the following major engineering issues faced by the Pingdingshan No. 12 mine:(1) difficulty in implementing auxiliary lifting because of its depth(i.e., beyond 1000 m);(2) highly gassy main coal seam with low permeability;(3) unstable overlying coal seam without suitable conditions for implementing conventional mining techniques for protective coal seam; and(4) predominant reliance on ‘‘under three" coal resources to ensure production output. This study proposes an integrated, closed-cycle mining-dressing-gas draining-backfilling-mining(MDGBM) technique. The proposed approach involves the mining of protective coal seam, underground dressing of coal and gangue(UDCG), pressure relief and gas drainage before extraction, and backfilling and mining of the protected coal seam. A system for draining gas and mining the protective seam in the rock stratum is designed and implemented based on the geological conditions. This system helps in realizing pressure relief and gas drainage from the protective seam before extraction. Accordingly, another system, which is connected to the existing production system, is established for the UDCG based on the dense medium-shallow trough process. The mixed mining workface is designed to accommodate both solid backfill and conventional fully mechanized coal mining, thereby facilitating coal mining, USCG, and backfilling. The results show that: The mixed mining workface length for the Ji15-31010 protected seam was 220 m with coal production capacity 1.2 million tons per year, while the backfill capacity of gangue was 0.5 million tons per year. The gas pressure decreased from 1.78 to 0.35 MPa, and the total amount of safely mined coal was 1.34 million tons. The process of simultaneously exploiting coal and draining gas was found to be safe, efficient, and green.This process also yielded significant economic benefits.  相似文献   

13.
The horizontal distance X between roadway and the edge of its upper pillar is considered as an important parameter for layout of roadway in floor strata or in the adjacent coal seam. Based on the research achievements of rockstrata pressure, this paper illustrates the quantitative relationship among the mining situation of upper seam, the roekstrata properties around roadway, the vertical distance Z (between roadway and its upper pillar), and the horizontal distance X (between roadway and the edge of its upper pillar), and provides a main basis for the selection of value X and the relative location between roadway and its upper seam.  相似文献   

14.
Yima Coal Corporation is considering to adopt highwall mining method with auger machine to recover coal from north surface pit that has reached final highwall position. The major geomechanical issues associated with auger mining are highwall and pillar stability. Based on the field investigation and laboratory test results of mechanical parameters, numerical modeling is carried out to assess the stability of highwall and pillar. Field measurements of highwall deformation have been used to validate and ensure the confidence for the development of realistic models. The results of numerical modeling show that the mining method is feasible for mining the seam of 10 m thickness in north surface coal mine.  相似文献   

15.
Fetr6 is an underground mine using the stope-and-pillar mining method. As there was some evidence regarding pillar failure in this mine, improving works such as roof support and replacing existing pillars with concrete pillars (CP) were carried out. During the construction of the second CP, in the space between the remaining pillars, one of the pillars failed leading to the progressive failure of other pillars until 4 000 m 2 of mine had collapsed within a few minutes. In this work, this phenomenon is described by applying both numerical and empirical methods and the respective results are compared. The results of numerical modelling are found to be closer to the actual condition than those of the empirical method. Also, a width-to-height (W/H) ratio less than 1, an inadequate support system and the absence of a detailed program for pillar recovery are shown to be the most important causes of the Domino failure in this mine.  相似文献   

16.
In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of protecting surface objects and coal pillars are established by TIN modeling and object-oriented technique. By using ACCESS2000as the database and the VC++ and OpenGL as the language, the calculation of protective coal pillars is realized and the 3D-visulizaiton system for protected objects on ground surface and for coal pillars is developed. The system can obtain the data of characteristic points on the surface interactively from the digitized mine topography map, constructing 3D model automatically. It can also obtain the interrelated parameters of the coal seam and drill hole data from existing geolog!cal surveying database to calculate the location, surface area and the total coal columns. The whole process can be computed quickly and accurately. And the 3D visualization system was applied in a mine, showing that the system solve the problem of complex calculation, not only realized the automatic 3D mapping and visualization of coal pillars for buildings protection, but also greatly improves the working efficiency.  相似文献   

17.
A pressure relief gas extraction technical model of a typical mining area is proposed based on coal and gas simultaneous extraction theory. Flac3 Dwas employed to model vertical stress and displacement contour plot characteristics of non-outburst coal seam(No. 4) on top of outburst coal seam(No. 2) along strike and incline directions. Field investigations were also conducted to verify the scientific nature of the simulation. The results demonstrate that gas pressure in No. 2 coal seam dropped to approximately 0.55 MPa in the pressure relief multi-coal seam. The highest expansion rate of the coal mine reached up to 2.58%.The pressure-relief angle was 76° along the incline direction and 60° along the strike direction. As the expansion rate and pressure-relief angle increased and the gas pressure decreased, a large amount of gas flowed into the gob of No. 4 from No. 2 coal seam and was later discharged through specific gas pipes,which eliminated No. 2 outburst risks. This study resulted in positive outcomes in that gas extraction time was reduced by 13.5 days, due to pressure relief, and drilling work load was reduced by 0.1161 m/t coal. This method ensures that gas is discharged from the outburst coal seam quickly and safely,demonstrating that the proposed technical model of pressure-relief gas extraction is effective in a multi-coal seam region.  相似文献   

18.
The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery. The excavation method is conventional drill and blast because of the small production. The partial pillar recovery is about 30% of the previous pillar size, 7 m × 7 m. The roof displacement was monitored during retreat operation; the surface movement was also monitored. The effect of the blasting vibration on the final pillar strength had been considered. Due to blasting, the pillar reduced about 20%. The consequence is more pillar deformation and roof vertical displacement. The pillar retreat and ground movement were simulated in a three-dimensional numerical model. This model was created to predict the surface subsidence and compare to the subsidence measured. This study showed that the remaining pillar and low seam reduce the subsidence that was predicted with conventional methods.  相似文献   

19.
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining,the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis.The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting conditions of the repeated mining face were obtained.The results indicate that when the repeated mining face passes the residual pillars,the sudden instability causes fracturing in the main roof above the old goaf and forms an extra-large rock block above the mining face.A relatively stable ‘‘Voussoir beam" structure is formed after the advance fracturing of the main roof.When the repeated mining face passes the old goaf,as the large rock block revolves and touches gangue,the rock block will break secondarily under overburden rock loads.An example calculation was performed involving an integrated mine in Shanxi province,results showed that minimum working resistance values of support determined to be reasonable were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf.On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable.  相似文献   

20.
A theory of seepage instability was used to estimate the harmfulness of water-inrush from a coal seam floor in a particular coal mine of the Mining Group, Xuzhou.Based on the stratum column chart in this coal mine, the distribution of stress in mining floors when the long-wall mining was respectively pushed along to 100 m and to 150 m was simulated by using the numerical software (RFPA2D).The permeability parameters of the coal seam floor are described given the relationship between permeability parameters.Strain and the water-inrush-indices were calculated.The water-inrush-index was 67.2% when the working face was pushed to 100 m, showing that water-inrush is possible and it was 1630% when the working face was pushed to 150 m, showing that water-inrush is quite probable.The results show that as long-wall mining is pushed along, the failure zone is enlarged, the strain increased, and fissures developed correspondingly, resulting in the formation of water-inrush channels.Accompanied by the failure of the strata, the permeability increased exponentially.In contrast, the non-Darcy flow β factor and the acceleration coefficient decreased exponentially, while the increase in the water-inrush-index was nearly exponential and the harmfulness of water-inrush in the coal mine increased accordingly.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号