Part of the ITER experimental setup will be testing of the first wall blanket module built from EUROFER 97 steel. Lifetime of this component should be predicted with help of defect assessment procedure. This work verifies the application of the R5 assessment code on the 2D test blanket module geometry by using finite element simulations. Verification is based on the evolution of C(t) parameter. Results exhibit good correspondence in predictions provided by R5 and finite element method for different thermo-mechanical loading conditions. These results therefore show applicability of R5 procedure on such complex geometries. 相似文献
2.
3.
R. W. Conn D. E. Baldwin R. J. Briggs J. D. Callen R. J. Goldston R. D. Hazeltine R. E. Siemon T. S. Taylor 《Journal of Fusion Energy》1999,18(4):213-299
This report presents the results of a U.S. review of the 1996 Detailed Design Report (DDR) of the International Thermonuclear Experimental Reactor (ITER) project. It was prepared by a panel established by the U.S. Department of Energy (USDOE) Fusion Energy Sciences Advisory Committee (FESAC) and was subsequently endorsed by FESAC and provided to the USDOE. Copies of the charge and transmittal letters are incorporated at the end of this paper. Also incorporated in this paper are the reports of several subpanels established to provide detailed review and recommendations on specific topics. The authors of those subpanel reports are acknowledged in the text. The ITER was subsequently reduced in size and scope; this review refers to the full-size ITER design as it was completed in 1996. 相似文献
4.
Guangchun Zhang Hongchun Wu Liangzhi Cao Youqi Zheng Yunzhao Li Zhouyu Liu 《Fusion Engineering and Design》2013,88(5):413-420
The neutronics analysis on the test blanket module (TBM) has important significance for the ITER device and its related experiment design. Quantities of scoping-type studies and conceptual designs were published by using the Monte Carlo method. However, disadvantages like time consuming make it necessary to develop a new highly efficient method. Hence, a new two-step approach method based on the 3D deterministic method for analyzing the TBM is proposed in this paper. A code package 3DMOC-NSPn was developed. It is mainly composed of three modules, the 3DMOC for generating the homogenization cross section; the LINK code for cross section condensation and the NSPn code for blanket calculation. The detailed flux distribution throughout the whole TBM and the mainly neutronics features, such as TBR, displacement per atom (DPA), helium and hydrogen production rate can be obtained. To validate the numerical approach and the code package, the calculations on China dual functional lithium lead-test blanket module (DFLL-TBM) was performed. The reference results were obtained by using the MCNP code. The numerical results from 3DMOC-NSPn are in good agreement with the references. It indicates that the whole code package is a reliable neutronics analysis tool for the TBM design and evaluation. 相似文献
5.
使用中子学程序系统VisualBUS和活化数据库EAF-99对DFLL-TBM的高级子模块DLL-TBM的活化特性进行了计算和分析,包括DLL-TBM各部件在不同停堆时间的活度、衰变余热和剂量率.活化计算所需要的三维中子能谱通过MCNP/4C中子/光子输运程序和国际原子能机构发布的FEND1.0数据库计算得到.在活化计算分析的基础上,参照欧洲聚变堆安全和环境评估(SEAFP)策略中有关核废料的处理标准评估了TBM各区材料在退役后的废料处理工作,包括核废料应该采用何种适当的方式进行处理及其被完全清除干净的可行性. 相似文献
6.
7.
ITER中国液态锂铅实验包层模块结构设计与加工 总被引:1,自引:2,他引:1
根据ITER实验包层的发展目标,实验要求,限制条件,结合聚变发电反应堆FDS-Ⅱ DLL/SLL包层方案设计了DFLL-TBM原型结构,给出了加工工艺和装配序列方案.该实验模块特点是极向LiPb流道易于布置FCI流道插件,"]"型隔板和"盒形"背板式联箱简化冷却方案和结构.这种简单的结构易于加工制造,易于派生出在ITER不同运行阶段实验的系列模块,符合在ITER进行SLL-TBM和DLL-TBM两种包层模块实验的策略. 相似文献
8.
ITER中国液态锂铅实验包层模块设计研究与实验策略 总被引:14,自引:16,他引:14
吴宜灿 汪卫华 刘松林 黄群英 郑善良 王红艳 陈红丽 陈明亮 柏云清 宋勇 章毛连 柯严 李春京 李艳芬 胡丽琴 刘萍 李静惊 李莹 许德政 曾勤 陈义学 《核科学与工程》2005,25(4):347-360
在广泛调研和深入分析国际聚变堆包层发展状况的基础上,根据液态锂铅包层一般特点和中国发展的系列液态锂铅包层概念设计,提出了一个具有演示氦气单冷却剂和氦气/锂铅双冷却剂包层技术的双功能包层模块实验系统方案,对其性能进行了分析研究,作为中国向ITER实验包层工作组(TBWG)提交的液态包层实验模块最终设计描述文件的内容框架。总结了该工作主要内容,包括基本设计思想和方案描述、性能分析概况、对辅助系统的要求和实验策略与关键技术等。 相似文献
9.
《Fusion Engineering and Design》2014,89(7-8):1119-1125
ITER will be used to test tritium breeding module concepts, which will lead to the design of DEMO fusion reactor demonstrating tritium self-sufficiency and the extraction of high grade heat for electricity production. China plans to test the HCCB TBM modules during different operation phases. Related design and R&D activities for each TBM module with the auxiliary system are introduced.The helium-cooled ceramic breeder (HCCB) test blanket module (TBM) is the primary option of the Chinese TBM program. The preliminary conceptual design of CN HCCB TBM has been completed. A modified design to reduce the RAFM material mass to 1.3 ton has been carried out based on the ITER technical requirement. Basic characteristics and main design parameters of CN HCCB TBM are introduced briefly. The mock-up fabrication and component tests for Chinese test blanket module are being developed. Recent status of the components of CN HCCB TBM and fabrication technology development are also reported. The neutron multiplier Be pebbles, tritium breeder Li4SiO4 pebbles, and structure material CLF-1 of ton-class are being prepared in laboratory scale. The fabrication of pebble bed container and experiment of tritium breeder pebble bed will be started soon. The fabrication technology development is proceeding as the large-scale mock-up fabrication enters into the R&D stage and demonstration tests toward TBM testing on ITER test port are being done as scheduled. 相似文献
10.
11.
氦气冷却系统是ITER中国液态锂铅实验包层模块(DFLL-TBM)在ITER装置内进行实验的重要辅助系统.根据ITER运行时的热工条件、安全要求、空间要求,分析了DFLL-TBM氦气冷却系统的功能,确定氦气冷却系统的设计原则和要求,在此基础上给出氦气冷却系统的初步设计方案和设备布置.该氦气系统的特点体现在:双功能,即有宽的裕量满足SLL-TBM和DLL-TBM实验;两条氦气回路共享压力控制单元和氦气净化子系统;旁路设计调节TBM和热交换器氦气的出口温度. 相似文献
12.
13.
14.
15.
16.
17.
《等离子体科学和技术》2016,18(10):1038-1043
The Chinese Fusion Engineering Tokamak Reactor(CFETR) is an important intermediate device between ITER and DEMO. The Water Cooled Ceramic Breeder(WCCB)blanket whose structural material is mainly made of Reduced Activation Ferritic/Martensitic(RAFM) steel, is one of the candidate conceptual blanket design. An analysis of ripple and error field induced by RAFM steel in WCCB is evaluated with the method of static magnetic analysis in the ANSYS code. Significant additional magnetic field is produced by blanket and it leads to an increased ripple field. Maximum ripple along the separatrix line reaches 0.53% which is higher than 0.5% of the acceptable design value. Simultaneously, one blanket module is taken out for heating purpose and the resulting error field is calculated to be seriously against the requirement. 相似文献
18.
19.
20.
Ferromagnetic material is used to reduce the toroidal field ripple in JFT-2M [H. Kawashima, et al., Demonstration of ripple reduction by ferritic steel board insertion in JFT-2M, Nucl. Fusion, 41 (2001) 257-263] and JT-60U [H. Takenaga, the JT-60 Team, Overview of JT-60U results for development of steady-state advanced Tokamak scenario, Proceedings of the 21st IAEA Fusion Energy Conference, Chengdu, China, 2006]. In ITER, since the ferromagnetic material is inserted in the space between the double walls of ITER Vacuum Vessel (VV), it is called “ferromagnetic inserts”. Suitable material is selected to satisfy the design requirements of ITER. The proper location and amount of the ferromagnetic inserts are optimized with the goal of reduction of the toroidal field ripple. The ferromagnetic inserts are designed to minimize electromagnetic forces acting on them. The electromagnetic forces have been calculated with the latest disruption scenarios. Magnetization forces due to magnetic fields have also been calculated. Structural integrity has been validated by a structural analysis. 相似文献