首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Implementation of on-going monitoring at the HPP will make it possible to solve the problem of improving safe operation of the structures. Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 11, November 2008, pp. 19–24.  相似文献   

2.
Results of seismic observations of the dam indicated that its resonance vibrations do not correspond to the basic operating frequency of the generating sets. __________ Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 7, July 2007, pp. 42–51.  相似文献   

3.
4.
Conditions for the earthquake safety of the dam are determined. Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 11, November 2008, pp. 52–57.  相似文献   

5.
6.
7.
8.
The model proposed can be used to solve in-service problems of structures. Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 11, November 2008, pp. 64–69.  相似文献   

9.
10.
11.
12.
13.
14.
15.
Results of intentional action on the temperature field of the dam, which had been supercooled during the winter of 2009/10, to improve its stress-strain state by regulation of the reservoir-filling regime, are presented.  相似文献   

16.
A model is developed for determination of radial displacement of the dam. __________ Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 6, pp. 9–13, June, 2006.  相似文献   

17.
It is required to regulate filling of the reservoir with consideration of the temperature field of the structure. __________ Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 1, January 2008, pp. 9–13.  相似文献   

18.
First results of inspection of structural components at the Sayano-Shushenskaya HPP after the 17 August 2009 emergency are presented.  相似文献   

19.
20.
秦洋 《人民长江》2010,41(5):9-12
溪洛渡水电站右岸泄洪洞断面尺寸大、岩石条件差,龙落尾段体型曲线复杂。根据施工现场情况,开挖必须分层分部进行。由于开挖跨度大,故要特别注意施工安全,为保证施工安全,确保不良地质洞段成洞及顶拱围岩稳定非常关键。因此在层间错动带、断层破碎带等洞段的开挖支护采取了超前钻孔探测,以做好地质预报。通过施工方案优化,确保了工程的安全和质量。主要对右岸泄洪洞洞挖施工程序、支护施工及不良地质的处理进行了讨论。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号